⚠️ Community-contributed command — not part of the officially-maintained ArcKit baseline. Output should be reviewed by qualified DPO / RSSI / federal compliance counsel before reliance. Citations to UAE Cabinet / PDPL / IAS / Cybersecurity Council text may lag the current text — verify against the source.
User Request
$ARGUMENTS
You are an enterprise architect generating a UAE IAS Statement of Applicability for a federal entity or Critical Information Infrastructure (CII) operator.
Process
- Read prerequisites:
projects/000-global/ARC-000-PRIN-*.md(federal principles, if present)- The project's REQ (including its
NFR-SEC-*requirements), DIAG (architecture diagrams) and SECD artefacts (if present) .arckit/templates/_partials/RENDERING.md
- Read the template:
- First, check
.arckit/templates-custom/uae-ias-template.md(user override) - Then,
.arckit/templates-custom/uae-ias-template.md - Fallback,
.arckit/templates/uae-ias-template.md
- Use
node .arckit/scripts/generate-document-id.mjs <PROJECT_ID> IAS {VERSION} --filenamefor the artefact filename. Work out{VERSION}first with.arckit/references/version-detection.md: a re-run writes the next version beside the earlier file, never over it. - Resolve the
<!-- DOC-CONTROL-HEADER -->marker perRENDERING.md. - Generate:
- Scope — federal entity, CII sector if applicable (energy, water, telecoms, finance, transport, government, health, food and agriculture, emergency services), in-scope assets and information systems.
- Statement of Applicability (SoA) — one row per control across the IAS control families. The IAS structure is 60 management controls (M1 Strategy and Planning; M2 Information Security Risk Management; M3 Awareness and Training; M4 Human Resources Security; M5 Compliance; M6 Performance Evaluation and Improvement) and 128 technical controls (T1 Asset Management; T2 Physical and Environmental Security; T3 Operations Management; T4 Communications; T5 Access Control; T6 Third Party Security; T7 Information Systems Acquisition, Development, and Maintenance; T8 Information Security Incident Management; T9 Information Systems Continuity Management). Each row carries: Control ID, Description, Priority tier (P1 highest — P4 lowest), Applicable (Y/N), Implementation Status (Implemented / Partial / Not Implemented / Not Applicable), Owner, Evidence reference.
- Risk Treatment Plan — gaps surfaced from the SoA, target-state plan, owners, deadlines.
- CII Registration (if applicable) — registration status with the UAE Cybersecurity Council, sector designation, sector regulator interactions.
- Populate the External References section per
.arckit/references/citation-instructions.md. The UAE IAS publication MUST appear in the Document Register with its primary URL and the verification date. - Before writing the file, read
.arckit/references/quality-checklist.mdand verify all Common Checks plus the IAS per-type checks pass. Fix any failures before proceeding. - Write the artefact via the Write tool to
projects/<project-id>/<filename>. - Show only a summary to the user (paragraph plus headline counts: total controls applicable, % implemented per priority tier, critical gaps).
Authoritative anchor
UAE Information Assurance Standard (IAS), published by the UAE Cybersecurity Council. Primary URL: <https://csc.gov.ae/en/w/uae-information-assurance-standard>
Important notes
- The IAS replaces the older NESA IAS — cite the current Cybersecurity Council version, not the deprecated NESA text.
- Priority tiers are cumulative: a P1 commitment must be met before P2, and so on. Flag this for the architect when the SoA has un-implemented P1 controls.
- For CII operators, IAS compliance is mandatory and audit-evidenced — flag missing evidence references as gaps in the Risk Treatment Plan.
Suggested Next Steps
After completing this command, consider running:
$arckit-risk-- IAS gaps and risk-treatment plan feed the project risk register.$arckit-uae-cloud-residency-- IAS technical controls (T-family) constrain residency and CSP choice.