Allen cacm1983

From curiositech/windags-skills · View interactive version

Allen cacm1983 is an AI agent skill from the GitHub repository curiositech/windags-skills. Temporal interval algebra for reasoning about time relationships in planning and knowledge representation

How to use this skill

Skill file

SKILL.md: Temporal Interval Reasoning (Allen 1983)

When to Use This Skill

Load this skill when you encounter:

| Trigger Situation | Why Allen Applies |

|---|---|

| "Does task A finish before task B starts?" | Requires interval relation classification (before, meets, overlaps…) |

| "I don't know exactly when X happened, only that it was during Y" | Disjunctive uncertainty over the 13 relations |

| "If we add this constraint, does the schedule still work?" | Constraint propagation + inconsistency detection |

| "Event A happens daily; event B happens yearly — how do they interact?" | Reference interval hierarchy for scope management |

Do not use if you only need to compare two absolute timestamps with no uncertainty — plain arithmetic suffices.


Decision Points

New Temporal Assertion Added

IF assertion conflicts with existing constraints:
    → Detect empty arc label during propagation
    → HALT immediately, report inconsistent interval pair
    → Do NOT continue with inconsistent state

IF assertion is consistent:
    → Run constraint propagation from affected arcs
    → Update labels by intersecting transitivity consequences
    → Continue until no more refinements possible

Handling Temporal Uncertainty

IF evidence only supports multiple relations:
    → Maintain full disjunctive label {before, meets, overlaps}
    → Never collapse to single relation without evidence
    → Log when/why constraint set narrows

IF forced to act under uncertainty:
    → Use disjunctive label as-is for planning
    → Tag any assumptions as defeasible
    → Avoid premature commitment

Scoping Temporal Reasoning

IF dealing with events at vastly different timescales:
    → Identify reference interval hierarchy (year→month→day)
    → Reason within each cluster separately
    → Create explicit bridge constraints at boundaries
    → Avoid flattening everything into one global graph

IF local reasoning feels sufficient:
    → Verify query scope matches reference interval level
    → Propagate only within relevant cluster
    → Escalate cross-cluster only when dependency detected

State Persistence

IF state continues with no explicit end bound:
    → Apply persistence default AND mark as defeasible
    → Any future end-bound assertion overrides default
    → Never treat persistence assumption as hard constraint

IF explicit temporal bound provided:
    → Override any existing persistence defaults
    → Propagate new constraint normally

Failure Modes

| Anti-Pattern | Symptom | Diagnosis | Fix |

|---|---|---|---|

| Point-ification | Reducing events to timestamps, losing overlap/containment info | Using time=14:30 instead of [14:30, 14:45] intervals | Model every event as interval with start/end, even if duration unknown |

| Premature Commitment | Picking single relation when evidence supports multiple | Asserting "before" when you only know "not during" | Maintain full disjunctive label until evidence forces narrowing |

| Global Propagation Bomb | O(N²) cost per update, performance degrades with KB size | Running constraint propagation across entire graph for local query | Use reference interval hierarchy to limit propagation scope |

| Empty Label Denial | Continuing reasoning after inconsistency detected | Getting nonsense results because conflicting constraints ignored | Treat empty arc label as SUCCESS (inconsistency caught early), halt immediately |

| Persistence Rigidity | Cannot override "continues until changed" assumptions | New temporal bounds rejected because they conflict with persistence | Tag all persistence defaults as defeasible, allow override by explicit assertions |

Detection Rules:


Worked Examples

Example 1: Meeting Schedule Conflict Detection

Scenario: Adding "Team Review" to calendar that already has "Client Call" and "Engineering Standup"

Initial State:

Client Call (I₁): [10:00, 11:00]
Engineering Standup (I₂): [11:30, 12:00]
Known: I₁ {before} I₂

New Assertion: Team Review (I₃): [10:45, 11:15]

Expert Reasoning Trace:

  1. Classify new relations:
  1. Constraint propagation:
  1. Consistency check: All labels non-empty → Schedule is feasible but has overlap

Novice Would Miss:

Expert Catches:

Example 2: Process Phase Dependencies

Scenario: Deployment pipeline with uncertain task completion times

Initial State:

Build Phase (B): duration unknown, must finish before Deploy
Test Phase (T): overlaps with end of Build, duration uncertain  
Deploy Phase (D): starts after both B and T complete

Constraint Network:

T {overlaps, finishes} B  (Test can finish with or before Build)
B {before, meets} D       (Build must complete before Deploy)
T {before, meets} D       (Test must complete before Deploy)

New Information: "Test found critical bug, extending by 2 hours"

Expert Reasoning:

  1. Update affects scope: Test extension pushes T endpoint later
  2. Propagation: If T {finishes} B originally, now T {overlaps} B (extends past Build end)
  3. Check consistency: T {overlaps} B still allows B {before, meets} D and T {before, meets} D
  4. Result: Deployment delayed but pipeline logic intact

Novice Would Miss:

Expert Catches:


Quality Gates

Temporal reasoning task is complete when:


NOT-FOR Boundaries

Do NOT use Allen's interval algebra for:

Delegate instead:

Allen excels at: Qualitative temporal reasoning under uncertainty with incremental knowledge updates and hierarchical scope management.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.