QA & Ship (Phase 5)
Applies when: development complete, tests passing, code reviewed. Does not apply before Phase 5.
Purpose: validate implementation meets requirements, ensure production readiness, ship with confidence.
Exit: acceptance criteria verified, no blockers, deployed, stakeholders informed.
References: references/acceptance-criteria-validation.md, references/qa-test-templates.md, references/release-checklist.md.
Deliverables
- Test Results - All acceptance criteria covered
- Release Certification - Checklist, stakeholder approvals
- Release Notes - User-facing changelog
- Deployment - Verified, monitoring active
Cucumber Acceptance Verification
All acceptance criteria (Gherkin scenarios) must pass before release.
| Step | Command | Expected Result | If Fails |
|------|---------|-----------------|----------|
| 1 | npm run cucumber:dry | No undefined steps | Implement missing step definitions |
| 2 | npm run cucumber | All scenarios pass | Debug failing scenarios |
| 3 | npm run test:critical | @critical scenarios pass | BLOCKER - must fix |
| 4 | npm run test:bdd | HTML report generated | Review reports/cucumber-report.html |
Read the summary lines: N scenarios (N passed) / N steps (N passed) means pass; any failed, skipped, or pending count means fail.
HTML Report Review
Check in reports/cucumber-report.html:
- Scenario Pass Rate - Should be 100% for release
- Failed Scenarios - Click to see step-by-step failure
- Pending Steps - Yellow = not implemented (blocker)
- Duration - Flag unusually slow scenarios
- Tags - Verify no @wip or @skip in release
QA Testing Checklist
Cucumber Acceptance Tests ⭐ REQUIRED
- [ ]
npm run cucumberpasses with 0 failures - [ ]
npm run test:criticalpasses (release gate) - [ ]
npm run cucumber:dryshows no undefined steps - [ ] HTML report (
reports/cucumber-report.html) reviewed - [ ] No @wip or @skip tags in scenarios for release
- [ ] No pending step definitions
- [ ] Scenario execution time reasonable (<30s average)
Functional
- [ ] All user stories verified
- [ ] All acceptance criteria tested
- [ ] Edge cases covered
- [ ] Error handling tested
- [ ] Cross-browser/device (if applicable)
Non-Functional
- [ ] Performance meets requirements
- [ ] Security scan passed
- [ ] Accessibility checked
- [ ] Load testing (if applicable)
Integration
- [ ] All integrations verified
- [ ] API contracts honored
- [ ] Data flows end-to-end
Test Code Quality (REQUIRED)
- [ ] Tests organized in correct directories (unit/integration/e2e)
- [ ] No hardcoded credentials in test code
- [ ] No secrets in README or documentation
- [ ] Tests run successfully in random order (
--randomize) - [ ] ALL existing tests still pass (no regressions)
- [ ] Assertions check specific values (not just existence)
- [ ] Tests verified to fail when code is broken
Test Verification Steps
Before marking QA complete, MUST verify:
- Run all tests. All must pass; no skipped tests without documented reason.
npm test
- Run in random order. All must pass.
jest --randomize
# OR
vitest --sequence.shuffle
- Check for credentials. Both must return no matches.
grep -rn "password.*=.*['\"]" tests/
grep -rnE "AKIA[A-Z0-9]{16}|['\"][A-Za-z0-9_-]{32,}['\"]" tests/
- Verify assertions (mutation test): comment out a key line of code being tested, run the related test, test MUST fail, restore code and verify test passes.
- Regression check: compare test count before vs after changes; same or more tests should pass.
Release Process
Pre-Release: 1. Complete QA checklist 2. Stakeholder sign-off 3. Prepare release notes 4. Verify rollback procedure 5. Schedule deployment
Deployment: 1. Deploy to staging 2. Run smoke tests 3. Deploy to production 4. Verify production smoke 5. Enable monitoring
Post-Release: 1. Monitor errors & performance 2. Gather user feedback 3. Address critical issues 4. Document lessons learned 5. Close project artifacts
Agentic Release (Eval Gate, Rollout, Monitoring)
Always applies, scaled by the PRD's §1.5 Solution Shape level; never "N/A". At levels 0-1 it is: acceptance tests as the gate, a staged release, a tested rollback plan, and monitoring of the §1.4 metrics. Detail: SKILL.extended.md → Agentic Release.
Eval release gate (§7A.6 Eval Plan), on the exact release versions and on QA's held-out split: golden set ≥ the PRD's threshold; red-team 0 critical/high failures plus an overall pass rate ≥ the PRD's target (incl. prompt injection, rules/general/untrusted-content.md); never-do enforced in code and verified at 100%; LLM judge kappa ≥ 0.7. Timing (A9): seed cases from Phase 1; QA grew the golden set and held-out split in parallel with Phases 2-4; they must be complete here, for this gate (judge calibrated in Phase 4).
Phase 5 exit: the eval release gate passed, shadow stage live, kill switch tested, and the stage criteria agreed. Each later promotion (human approval → autonomous) is a recorded decision by the 7A.8 owner, outside the phase gate. Stages (shadow → human approval → autonomous), the kill-switch test and monitoring (quality drift, cost per successful task, escalation rate and response time, guardrail metrics): SKILL.extended.md → Agentic Release.
Phase Gate Checklist
Cucumber Acceptance Gates (MUST PASS) ⭐
- [ ]
npm run cucumberexits with code 0 - [ ]
npm run test:criticalpasses (all @critical scenarios) - [ ] No undefined or pending step definitions
- [ ] HTML report generated and reviewed
- [ ] No @wip or @skip tags in release scenarios
Test Quality Gates (MUST PASS)
- [ ] All tests pass (
npm testreturns 0 failures) - [ ] Tests pass in random order (
--randomizeflag) - [ ] No hardcoded credentials in test code
- [ ] ALL existing tests still pass (no regressions)
- [ ] Tests verified to catch bugs (mutation test)
Acceptance & Quality
- [ ] All acceptance criteria verified (via Cucumber)
- [ ] No blocking bugs
- [ ] Performance validated
- [ ] Security review completed
Release Readiness
- [ ] Rollback plan documented
- [ ] Monitoring configured
- [ ] Release notes prepared
- [ ] Stakeholder approval
- [ ] Deployment instructions verified
- [ ] Agentic Release: eval release gate passed, shadow live, kill switch tested, stage criteria agreed (level 0-1: staged release, rollback, monitoring)
Release Notes Template
# Release Notes - [Feature]
**Date**: YYYY-MM-DD
**Version**: X.Y.Z
## What's New
- [Feature]: [Description]
## Improvements
- [Improvement]
## Bug Fixes
- [Fix]: [What was fixed]
## Known Issues
- [Issue]: [Workaround]
Common Pitfalls
| Pitfall | Fix |
|---------|-----|
| Rushing to ship | Respect checklist |
| Testing in production | Use staging |
| Missing rollback | Always have way back |
| No monitoring | Set up first |
| Poor communication | Keep everyone informed |
Role Guidance
| Role | Focus |
|------|-------|
| PM | Acceptance testing, UX, approve release |
| Dev | Fix bugs, support deploy, monitor |
| QA | Execute test plan, verify fixes, sign-off |
| Tech Lead | Operational readiness, approve deploy |
Pipeline Integration
If .aid/pipeline/state.json exists with pipeline_status: "running", Phase 5 test sequencing is driven by the pipeline-orchestrator skill.
| Without Pipeline | With Pipeline |
|-----------------|---------------|
| Manual test execution order | Pipeline enforces API_TESTS > E2E_TESTS > CERTIFICATION |
| Developer decides when to fix | Pipeline enforces fix-and-retry loops |
| Manual certification | Automated CERTIFICATION step with coverage verification |
Unchanged by the pipeline: Cucumber acceptance verification, QA testing checklist, release process, phase gate checklist.
Activation: the pipeline auto-transitions Phase 4 to Phase 5 when PHASE_GATE passes (if auto_advance_phase: true in config). Otherwise run /pipeline in Phase 5.
See ../pipeline-orchestrator/SKILL.md for full pipeline documentation.