Executing Plans
Overview
Load plan, review critically, execute all tasks, report when complete.
Announce at start: "I'm using the executing-plans skill to implement this plan."
Use subagents only when supported, permitted, and useful for independent tasks. Otherwise execute the plan directly; no extra runtime setup is needed.
The Process
Step 1: Load and Review Plan
- Inspect workspace ownership; reuse a clean task branch or isolate work if necessary
- Read plan file
- Review critically - identify any questions or concerns about the plan
- Resolve routine concerns from repository evidence; ask about material unresolved decisions
- If no concerns: Create todos for the plan items and proceed
Step 2: Execute Tasks
For each task:
- Mark as in_progress
- Preserve the intended outcome; adapt obsolete implementation details from current evidence
- Run verifications as specified
- Mark as completed
Step 3: Complete Development
After all tasks complete and verified:
- Inspect the requested delivery target and repository completion checks
- Use an available finishing workflow when its methods are needed
- Verify required checks and execute the delivery path already requested; ask only if it is unresolved
When to Stop and Ask for Help
STOP executing immediately when:
- Required access or a consequential user decision is unavailable after investigation
- Plan has critical gaps preventing starting
- A material scope conflict cannot be resolved from current instructions or evidence
- Verification reveals an external blocker that cannot be repaired within the authorized scope
Investigate test failures and missing local dependencies first; repair routine blockers within scope. Ask for the specific missing input only when it is necessary.
When to Revisit Earlier Steps
Return to Review (Step 1) when:
- Partner updates the plan based on your feedback
- Fundamental approach needs rethinking
Don't force through blockers - stop and ask.
Remember
- Review plan critically first
- Follow acceptance criteria and update the plan when current evidence requires a change
- Don't skip verifications
- Reference skills when plan says to
- Stop when blocked, don't guess
- Never start implementation on main/master branch without explicit user consent
Task Evidence Ledger
Track results against the actual work revision:
Task: Implement retry policy
Input: Existing plan, current error contract, caller tests
Files: Client implementation and focused retry tests
Acceptance: Bounded attempts; cancellation propagates
Evidence: Test command, exit status, revision
Next: Integration check after the dependent caller changes
Reuse passing evidence while its relevant inputs are unchanged.
Invalidate the affected check when a dependency or implementation changes.
Keep failed checks visible until their causes are resolved.
A skipped external integration is not a passing integration test.
Plan Drift and Recovery
Compare each step with current repository files before executing it.
When a command or file moved, update the plan from observed evidence.
Keep unfinished user tasks separate from newly discovered follow-up work.
For an unavailable dependency, complete independent tasks first.
Report the precise missing access or decision needed for blocked work.
Completion Example
Implemented: Tasks 1-4, with dependency order preserved.
Validated: Focused tests and required repository checks.
Delivery: PR created and merged when that was requested.
Unverified: External staging flow requires a configured environment.