Triggers
- launch phase
- go to market
- product launch
- marketing campaign launch
- deployment day
- blue-green deployment
- launch checklist
- growth activation
- user acquisition
- launch week
- post-launch
- launch optimization
- channel activation
- launch coordination
- release management
Instructions
Phase 5 coordinates go-to-market execution across all channels simultaneously. Maximum impact at launch. Every marketing agent fires in concert while engineering ensures stability. Duration: 2-4 weeks (T-7 through T+14).
Pre-Conditions
Verify before starting:
- Phase 4 Quality Gate passed (Reality Checker READY verdict)
- Phase 4 Handoff Package received
- Production deployment plan approved
- Marketing content pipeline ready (from Phase 3 Track B)
T-7: Pre-Launch Week
Use organization_spawn to activate content and technical preparation in parallel:
Content & Campaign Preparation:
- Content Creator: Finalize all launch content, queue in publishing platforms, prepare response templates
- Social Media Strategist: Finalize cross-platform campaign assets, schedule teasers, coordinate influencers
- Growth Hacker: Arm viral mechanics (referral codes, sharing incentives), configure growth tracking, set up funnel analytics
- App Store Optimizer (if mobile): Finalize store listing, submit for review, configure in-app review prompts
Technical Preparation:
- DevOps Automator: Prepare blue-green deployment, verify rollback procedures, configure feature flags, test pipeline
- Infrastructure Maintainer: Configure auto-scaling for 10x traffic, verify monitoring/alerting, test disaster recovery
- Project Shepherd: Distribute launch checklist, confirm dependencies, set up launch day comms, brief stakeholders
T-1: Launch Eve Final Checklist
Technical: Blue-green tested, rollback verified, auto-scaling configured, monitoring live, incident response on standby, feature flags configured.
Content: All content queued/scheduled, email sequences armed, social posts scheduled, blog posts ready, press materials distributed.
Marketing: Viral mechanics tested, referral system operational, analytics tracking verified, ad campaigns ready, community engagement plan ready.
Support: Support team briefed, FAQ/help docs published, escalation procedures confirmed, feedback collection active.
T-0: Launch Day
Hour 0 — Deployment: Use organization_delegate to DevOps Automator:
- Execute blue-green deployment to production
- Run health checks on all services
- Verify database migrations complete
- Confirm all endpoints responding
- Switch traffic to new deployment
- Monitor error rates for 15 minutes
- Confirm DEPLOYMENT SUCCESSFUL or ROLLBACK
Hour 1-2 — Marketing Activation: Activate platform agents in parallel:
- Twitter Engager: Publish launch thread, engage with responses, monitor mentions
- Reddit Community Builder: Authentic launch announcement, engage with comments
- Instagram Curator: Publish visual content, stories with demos
- TikTok Strategist: Publish launch videos, monitor viral potential
Hour 2-8 — Monitoring & Response:
- Support Responder: Handle inquiries, document common issues, escalate technical problems
- Analytics Reporter: Real-time metrics dashboard, hourly reports, channel attribution
- Feedback Synthesizer: Monitor all channels, categorize feedback, identify critical issues
T+1 to T+7: Post-Launch Week
Daily cadence:
- Morning: Analytics Reporter (daily metrics), Feedback Synthesizer (feedback summary), Infrastructure Maintainer (system health), Growth Hacker (channel performance)
- Afternoon: Content Creator (response content), Social Media Strategist (engagement optimization), Experiment Tracker (A/B results), Support Responder (issue resolution)
- Evening: Executive Summary Generator (stakeholder briefing), Project Shepherd (coordination), DevOps Automator (hotfixes if needed)
T+7 to T+14: Optimization Week
- Growth Hacker: Analyze first-week data, optimize funnels, scale winning channels, refine viral mechanics
- Analytics Reporter: Week 1 comprehensive analysis, cohort analysis, retention curves
- Experiment Tracker: Launch systematic A/B tests (onboarding, pricing, feature discovery)
- Executive Summary Generator: Week 1 executive summary, key metrics vs. targets, recommendations
Gate Decision
Dual sign-off: Studio Producer (strategic) + Analytics Reporter (data)
- STABLE: Product launched, systems stable, growth active -> Phase 6
- CRITICAL: Major issues requiring immediate engineering response -> Hotfix cycle
- ROLLBACK: Fundamental problems -> Revert deployment, return to Phase 4
Use knowledge_write to persist launch metrics, feedback themes, and system performance baselines.
Deliverables
- [ ] Successful zero-downtime deployment
- [ ] All marketing channels activated
- [ ] Real-time monitoring dashboard operational
- [ ] User support operational
- [ ] Feedback loop operational
- [ ] Week 1 analytics report
- [ ] Week 1 executive summary
- [ ] Growth channel performance analysis
- [ ] A/B test results from launch experiments
Success Metrics
- Zero-downtime deployment successful
- Systems stable (no P0/P1 in 48 hours)
- User acquisition channels active and tracking
- Feedback loop operational
- Stakeholders informed with executive summaries
- Support operational with < 4hr response time
- Growth metrics tracking and optimizing
Verify
- The deliverable for this phase exists as a concrete artifact (doc, ticket, board, repo) and its location is shared, not described
- Each commitment has an owner name, a due date, and a definition-of-done that someone other than the author could check
- Risks are listed with likelihood/impact and a named mitigation, not as a generic 'risks: TBD' bullet
- Dependencies on other teams/vendors/agents are explicit; an ack from each dependency is recorded or marked 'pending'
- Success criteria for the next phase are numeric or otherwise objectively testable
- A rollback / kill-switch / 'we will stop if X' criterion is written down before work starts