Triggers
- foundation phase
- scaffolding
- project setup
- CI/CD pipeline
- infrastructure setup
- design system implementation
- database setup
- API scaffold
- environment setup
- monitoring setup
- dev environment
- project scaffolding
- component library
- theme system
- deployment pipeline
Instructions
Phase 2 builds the technical and operational foundation that all subsequent work depends on. Get the skeleton standing before adding muscle. After this phase, every developer has a working environment, a deployable pipeline, and a design system to build with. Duration: 3-5 days.
Pre-Conditions
Verify before starting:
- Phase 1 Quality Gate passed (Architecture Package approved)
- Phase 1 Handoff Package received
- All architecture documents finalized
Workstream A: Infrastructure (Day 1-3, Parallel)
Use organization_spawn or swarm_spawn to activate in parallel:
DevOps Automator — CI/CD Pipeline + Infrastructure:
- Input: Backend Architect system architecture + deployment requirements
goal_create: CI/CD Pipeline (security scanning, testing, build/containerization, deployment, rollback)goal_create: Infrastructure as Code (environment provisioning, container orchestration, network/security config)goal_create: Environment Configuration (secrets management, env vars, multi-environment parity)- Files to create: .github/workflows/ci-cd.yml, infrastructure/ templates, docker-compose.yml, Dockerfiles
- Timeline: 3 days.
Infrastructure Maintainer — Cloud Infrastructure + Monitoring:
- Input: DevOps Automator infrastructure + Backend Architect architecture
goal_create: Cloud Resource Provisioning (compute, storage, networking, auto-scaling, load balancer)goal_create: Monitoring Stack (Prometheus/DataDog, Grafana dashboards)goal_create: Logging and Alerting (centralized logs, alert rules, on-call notifications)goal_create: Security Hardening (firewall rules, SSL/TLS, access control policies)- Timeline: 3 days.
Studio Operations — Process Setup:
- Input: Sprint Prioritizer plan + coordination needs
goal_create: Git Workflow (branch strategy, PR review process, merge policies)goal_create: Communication Channels (team channels, notification routing, status cadence)goal_create: Documentation Templates (PR template, issue template, decision log)goal_create: Collaboration Tools (project board, sprint tracking configuration)- Timeline: 2 days.
Workstream B: Application Foundation (Day 1-4, Parallel)
Frontend Developer — Project Scaffolding + Component Library:
- Input: UX Architect CSS Design System + Brand Guardian identity
goal_create: Project Scaffolding (framework setup, TypeScript, build tooling, testing framework)goal_create: Design System Implementation (CSS tokens, base components, theme system, responsive utilities)goal_create: Application Shell (routing, layout components, error boundary, loading states)- Timeline: 3 days.
Backend Architect — Database + API Foundation:
- Input: System Architecture Specification + Database Schema Design
goal_create: Database Setup (schema deployment/migrations, indexes, seed data, connection pooling)goal_create: API Scaffold (framework setup, route structure, middleware stack, health checks)goal_create: Authentication System (auth provider, JWT/session management, RBAC scaffold)goal_create: Service Communication (API versioning, serialization, error standardization)- Timeline: 4 days.
UX Architect — CSS System Implementation:
- Input: Brand Guardian identity + Phase 1 CSS Design System spec
goal_create: Design Tokens Implementation (CSS custom properties, brand palette, typography scale)goal_create: Layout System (container system, grid patterns, flexbox utilities)goal_create: Theme System (light/dark variables, system preference detection, theme toggle, smooth transitions)- Timeline: 2 days.
Verification Checkpoint (Day 4-5)
Use organization_delegate to an Evidence Collector for verification with screenshot evidence:
- CI/CD pipeline executes successfully
- Application skeleton loads in browser (desktop + mobile)
- Theme toggle works (light + dark)
- API health check responds
- Database is accessible (migration status)
- Monitoring dashboards are active
- Component library renders
Gate Decision
Dual sign-off: DevOps Automator (infrastructure) + Evidence Collector (visual)
- PASS: Working skeleton with full DevOps pipeline -> Phase 3
- FAIL: Specific infrastructure or application issues -> Fix and re-verify
Use knowledge_write to persist all foundation artifacts and verification evidence.
Deliverables
- [ ] Working CI/CD pipeline (builds, tests, deploys)
- [ ] Database schema deployed with all tables/indexes
- [ ] API scaffold responding on health check
- [ ] Frontend skeleton renders in browser
- [ ] Monitoring dashboards showing metrics
- [ ] Design system tokens implemented
- [ ] Theme toggle functional (light/dark/system)
- [ ] Git workflow and processes documented
- [ ] Evidence Collector verification screenshots
Success Metrics
- CI/CD pipeline builds, tests, and deploys without errors
- Database schema deployed with all tables and indexes
- API scaffold responding on health check endpoint
- Frontend skeleton renders in browser (desktop + mobile)
- Monitoring dashboards showing metrics
- Design system tokens implemented and component library rendering
- Theme toggle functional (light/dark/system)
- Git workflow and processes documented
Verify
- The deliverable for this phase exists as a concrete artifact (doc, ticket, board, repo) and its location is shared, not described
- Each commitment has an owner name, a due date, and a definition-of-done that someone other than the author could check
- Risks are listed with likelihood/impact and a named mitigation, not as a generic 'risks: TBD' bullet
- Dependencies on other teams/vendors/agents are explicit; an ack from each dependency is recorded or marked 'pending'
- Success criteria for the next phase are numeric or otherwise objectively testable
- A rollback / kill-switch / 'we will stop if X' criterion is written down before work starts