Triggers
- strategy phase
- architecture planning
- system architecture
- brand identity
- budget planning
- sprint planning
- feature prioritization
- technical architecture
- project architecture
- design system planning
- resource allocation
- ROI planning
- backlog creation
- task breakdown
- RICE scoring
- MoSCoW classification
Instructions
Phase 1 defines what we're building, how it's structured, and what success looks like — before writing a single line of code. Every architectural decision is documented, every feature prioritized, every dollar accounted for. Duration: 5-10 days.
Pre-Conditions
Verify before starting:
- Phase 0 Quality Gate passed (GO decision)
- Phase 0 Handoff Package received
- Stakeholder alignment on project scope
Step 1: Strategic Framing (Day 1-3, Parallel)
Use organization_spawn or swarm_spawn to activate in parallel:
Studio Producer — Strategic Portfolio Alignment:
- Input: Phase 0 Executive Summary + Market Analysis Report
goal_create: Strategic Portfolio Plan with project positioninggoal_create: Vision, objectives, and ROI targetsgoal_create: Resource allocation strategygoal_create: Risk/reward assessmentgoal_create: Success criteria and milestone definitions- Timeline: 3 days.
Brand Guardian — Brand Identity System:
- Input: Phase 0 UX Research (personas, journey maps)
goal_create: Brand Foundation (purpose, vision, mission, values, personality)goal_create: Visual Identity System (colors, typography, spacing as CSS variables)goal_create: Brand Voice and Messaging Architecturegoal_create: Logo system specifications (if new brand)goal_create: Brand usage guidelines- Timeline: 3 days.
Finance Tracker — Budget and Resource Planning:
- Input: Studio Producer strategic plan + Phase 0 Tech Stack Assessment
goal_create: Comprehensive project budget with category breakdowngoal_create: Resource cost projections (agents, infrastructure, tools)goal_create: ROI model with break-even analysisgoal_create: Cash flow timelinegoal_create: Financial risk assessment with contingency reserves- Timeline: 2 days.
Step 2: Technical Architecture (Day 3-7, Parallel, after Step 1)
UX Architect — Technical Architecture + UX Foundation:
- Input: Brand Guardian visual identity + Phase 0 UX Research
goal_create: CSS Design System (variables, tokens, scales)goal_create: Layout Framework (Grid/Flexbox patterns, responsive breakpoints)goal_create: Component Architecture (naming conventions, hierarchy)goal_create: Information Architecture (page flow, content hierarchy)goal_create: Theme System (light/dark/system toggle)goal_create: Accessibility Foundation (WCAG 2.1 AA baseline)- Timeline: 4 days.
Backend Architect — System Architecture:
- Input: Phase 0 Tech Stack Assessment + Compliance Requirements
goal_create: Architecture pattern (microservices/monolith/serverless/hybrid)goal_create: Database Schema Design with indexing strategygoal_create: API Design Specification with versioninggoal_create: Authentication and Authorization Architecturegoal_create: Security Architecture (defense in depth)goal_create: Scalability Plan (horizontal scaling strategy)- Timeline: 4 days.
AI Engineer — ML Architecture (if applicable):
- Input: Backend Architect system architecture + Phase 0 Data Audit
goal_create: ML System Design (model selection, data pipeline, inference strategy)goal_create: AI Ethics and Safety Frameworkgoal_create: Model monitoring and retraining plangoal_create: Integration points with main applicationgoal_create: Cost projections for ML infrastructure- Condition: Only activate if project includes AI/ML features. Timeline: 3 days.
Senior Project Manager — Spec-to-Task Conversion:
- Input: ALL Phase 0 documents + Architecture specs
goal_create: Comprehensive Task List with acceptance criteria per taskgoal_create: Work Breakdown Structure with dependenciesgoal_create: Critical path identificationgoal_create: Risk register for implementation- Rules: Do NOT add features not in the specification. Quote exact text from requirements. Be realistic about effort estimates.
- Timeline: 3 days.
Step 3: Prioritization (Day 7-10, Sequential, after Step 2)
Sprint Prioritizer — Feature Prioritization:
- Input: Task List, System Architecture, UX Architecture, Budget, Strategic Plan
goal_create: RICE-scored backlog (Reach, Impact, Confidence, Effort)goal_create: Sprint assignments with velocity-based estimationgoal_create: Dependency map with critical pathgoal_create: MoSCoW classification (Must/Should/Could/Won't)goal_create: Release plan with milestone mapping- Validation: Studio Producer confirms strategic alignment.
- Timeline: 2 days.
Gate Decision
Dual sign-off required: Studio Producer (strategic) + Reality Checker (technical)
- APPROVED: Proceed to Phase 2 with full Architecture Package
- REVISE: Specific items need rework (return to relevant Step)
- RESTRUCTURE: Fundamental architecture issues (restart Phase 1)
Use knowledge_write to persist the entire Architecture Package.
Deliverables
- [ ] Strategic Portfolio Plan (Studio Producer)
- [ ] Brand Identity System (Brand Guardian)
- [ ] Financial Plan with ROI Projections (Finance Tracker)
- [ ] CSS Design System + UX Architecture (UX Architect)
- [ ] System Architecture Specification (Backend Architect)
- [ ] ML System Design (AI Engineer — if applicable)
- [ ] Comprehensive Task List with acceptance criteria (Senior PM)
- [ ] Prioritized Sprint Plan with RICE scores (Sprint Prioritizer)
- [ ] Phase 1 -> Phase 2 Handoff Package
Success Metrics
- Architecture covers 100% of spec requirements
- Brand system complete (logo, colors, typography, voice)
- All technical components have implementation path
- Budget approved and within constraints
- Sprint plan is velocity-based and realistic
- Security architecture defined
- Compliance requirements integrated into architecture
Verify
- The deliverable for this phase exists as a concrete artifact (doc, ticket, board, repo) and its location is shared, not described
- Each commitment has an owner name, a due date, and a definition-of-done that someone other than the author could check
- Risks are listed with likelihood/impact and a named mitigation, not as a generic 'risks: TBD' bullet
- Dependencies on other teams/vendors/agents are explicit; an ack from each dependency is recorded or marked 'pending'
- Success criteria for the next phase are numeric or otherwise objectively testable
- A rollback / kill-switch / 'we will stop if X' criterion is written down before work starts