Verification before completion

From Undermybelt/hermes-skills · View interactive version

Verification before completion is an AI agent skill from the GitHub repository Undermybelt/hermes-skills. Use when about to claim work is complete, fixed, passing, verified, release-ready, or ready to commit, merge, publish, or hand off.

How to use this skill

Skill file

Execute

→ About to claim "done", "passing", "fixed", "complete"? → Run the verification command first. Then claim.

1. Identify: what command proves the claim?

2. Run: full command, fresh, complete

3. Read: output, exit code, failures

4. Verify: output confirms claim? → state claim WITH evidence. Doesn't? → state actual status.

→ Done when: exact command run, output confirms, residual risk stated, confidence graded.

Non-trivial code changes → also report Complexity Delta and Complexity Governance Suggestion.

Governance/retirement work → also close Repair Track + Retirement Track + Residual Risk.

Verification Before Completion

Overview

Claiming work is complete without verification is dishonesty, not efficiency. Evidence before claims, always.

Red Flags - STOP

When To Apply

Before ANY success/completion claim, expression of satisfaction, commit, PR, task completion, or delegation. Applies to exact phrases, paraphrases, and implications.

QA Closure

Before any success claim, include the required evidence semantic slots. Natural

prose, localized headings, or compact cards are all valid when the slots remain

explicit and auditable.

Required evidence slots, one allowed card rendering:
- Evidence action / check performed:
- Result / exit status:
- Covered scope:
- Uncovered scope:
- Residual risk:
- Confidence grade: A | B | C

Semantic Slots:

compact cards when they remain explicit and auditable.

semantic slots; natural expression is not a reason to drop evidence,

uncovered scope, residual risk, confidence, retirement, baseline, or

architecture fields.

work. It names the boundary held, evidence, covered and uncovered scope,

residual risk, confidence, and any triggered governance closure.

TDD Completion Boundary:

decides current-task completion; Slice Card decides slice completion only.

explicit.

needs-verification or return to framing/planning.

  1. Remove/Restore: side effects? temp instrumentation restored?
  2. Evidence Bundle: exact command, scope, exit status, key output. State what's covered and what's not. Include target test and related regression evidence. When automation is blocked, provide reproducible manual verification steps.
  3. Prompt Hygiene: when external output shaped judgment → state whether summaries or raw excerpts were used. Name large payloads not loaded. If summary insufficient → read back excerpt or lower claim. Include Evidence Used / Not Loaded / Next Evidence boundary when relevant.
  4. Confidence: A (direct + regression, no unknowns) | B (direct, bounded risk) | C (partial only, not closed)
  5. Authority: verified evidence ≠ authoritative completion. Keep distinct.
  6. Goal Closure: when goal-framing or optional TaskIntentDraft goal

fields shaped the work, explicitly check the goal before claiming completion:

Available boundary check for completion judgment:

1. Parent plan/spec acceptance for whole-task completion, when present

2. TaskIntentDraft Goal / Success evidence / Non-goals for the current

task, when present

3. Slice Card Goal / Verification / Stop for the current slice, when

present

```text

Goal Closure:

```

Use done only when success evidence is satisfied. Use blocked when a

dependency, permission, or required fact is missing. Use needs-verification

when implementation exists but evidence is insufficient. Use

scope-exceeded when continuing would exceed the goal or non-goals.

  1. Long-Task: re-read checkpoint, confirm every todo has status, no drift check unresolved.
  2. Workspace Integrity: if the task created or modified a target project's

docs/aegis/ workspace and configured Aegis workspace support is available,

run

python <aegis-workspace-helper> bundle --root <target-project-root> --work YYYY-MM-DD-<slug>

when a work/ record exists, then run

python <aegis-workspace-helper> check --root <target-project-root> and

include the result in the evidence bundle. The generated proof bundle and

workspace check validate method-pack structure, index coverage, and

recognizable JSON artifact sidecars only; they do not judge evidence

sufficiency and do not grant completion authority.

  1. Readiness Summary: for release, merge, handoff, or "ready?" requests,

organize the evidence into a compact readiness view after the evidence

slots:

```text

Readiness Summary:

```

A readiness summary is advisory evidence organization only. It is not

authorization to commit, tag, publish, merge, or release. It cannot provide

completion authority.

  1. Natural Aegis closeout: when Aegis skills materially shaped a

non-trivial task, keep Aegis explicitly visible in the final completion

closeout.

The closeout should naturally show how Aegis influenced the result. Make at

least one of the following user-visible:

Use one sentence when Aegis mainly helped hold one boundary steady,

but more than one mention is valid when boundary, evidence, and

residual-risk visibility each materially shaped the judgment.

Keep this integrated into the normal completion summary rather than a fixed

slogan. Do not default to a visible Aegis Contribution Note: heading. Do

not default to one canonical closeout phrase, and do not repeat the same

Aegis closeout wording across unrelated tasks.

When Aegis materially shaped multiple parts of the judgment, it may appear

more than once across the closeout, as long as each mention is tied to a

concrete boundary, evidence decision, or risk callout.

Keep it advisory method-pack discipline, not completion authority. Keep it

implicit only for obvious fast-path replies unless the user asked about

Aegis routing.

Natural expression may satisfy the visibility requirement when the semantic

slots are still explicit. For example, "I will follow the Aegis order here:

read the owner / baseline and current implementation first, add a failing

example for the main path, then make the minimal repair and verify it" is a

valid natural transition before implementation. Completion still needs fresh

evidence and the applicable Governance Receipt fields.

Use structured trace only for audit, debug, release, long-task review, or user request.

The structured form may name skills, stage transitions, quality

effect, and boundary, but it should not replace the normal user-facing

completion note.

  1. User-Language Output: final response cards must localize user-facing

section labels, field labels, and explanatory prose to the user's language.

Keep commands, file paths, code identifiers, stable enum values, and exact

product names unchanged. For important Aegis product terms, include the

stable English identifier only when it prevents ambiguity, usually beside a

user-language explanation on first use.

  1. Complexity Delta: for non-trivial code changes, inspect the actual

diff before claiming completion. This is a completion-time entropy check,

not a universal failure gate. Skip or keep it one-line for tiny wording

edits, tests-only additions, generated files, vendored files, fixtures,

lockfiles, or purely mechanical formatting where no maintained source owner

gained complexity.

Use the project language for field labels in the final response, but keep

the internal shape recognizable:

```text

Complexity Delta:

```

When the delta finds meaningful pressure, add:

```text

Complexity Governance Suggestion:

```

Use none for small owner-correct diffs, monitor for acceptable visible

growth, and stronger recommendations for 800+ line files, 80+ line blocks,

branch/fallback/adapter growth without retirement, or owner mismatch. The

suggestion is advisory; keep residual risk visible.

Rules:

added logic there or pushed it across 800 lines, explain why the owner

boundary is still correct or report a split/refactor follow-up.

lines, deeply nested logic, or mixed reasons to change is a block-level

complexity signal even if the file remains under 800 lines.

paired with retired paths or a Retirement Closure entry. Net new paths

without deletion or a scheduled retirement trigger count as entropy

increase.

downgrade the completion claim or state the residual risk.

  1. Baseline Alignment Check: before final response, if project

instructions require baseline reporting or the task touched requirement,

product, or durable architecture surfaces, include an explicit baseline

alignment result. This is separate from ADR Backfill: alignment states

whether the completed work matches current requirements and architecture

baselines; ADR Backfill states whether durable architecture memory needs to

be created, amended, superseded, or skipped. This is a method-pack signal,

not a runtime gate, not an authoritative GateDecision, and not completion

authority.

Product / Requirement Baseline covers the accepted problem, success

evidence, non-goals, workflow constraints, and approved requirement/spec

intent. Architecture / Runtime Boundary Baseline covers canonical owner,

contract, source-of-truth, dependency direction, compatibility,

runtime-ready/method-pack boundary, and retirement state.

Triggering surfaces include architecture, contracts, source-of-truth owner,

canonical owner, context/answering/runtime flow, cross-module data flow,

producer-to-carrier-to-consumer chains, public user-visible identity,

evidence model, retained fallback, adapter, compatibility path, requirement

acceptance, product non-goals, and project-specific baseline rules.

```text

Baseline Alignment:

```

Use Design Defect when the relevant requirement, design, or baseline is

wrong. Use Implementation Drift when the work deviates from a correct

unchanged baseline. Architecture Defect and Architecture Drift remain

compatibility aliases for architecture-scoped Design Defect and

architecture-scoped Implementation Drift.

When project instructions specifically require architecture reporting or the

completed work touched durable architecture surfaces, the architecture-scoped

subset may also be reported as Architecture Alignment:

```text

Architecture Alignment:

```

Use Integrity Residual Risk when ArchitectureReviewRequired: yes, an

Architecture Integrity Lens shaped the plan or review, or the diff touches

canonical owner, source-of-truth, fallback, adapter, or duplicate-owner

surfaces. Name any unresolved responsibility overlap, missed higher-level

owner / contract fix, retained caller-side fallback, or stale path that still

needs retirement. If none remains, state none rather than expanding into a

new gate.

  1. ADR Backfill Check: for completed medium/high work that touched durable

architecture surfaces, run the ADR Auto Backfill check before final

completion claims. Use Trigger: no or skip the expanded block for simple

wording edits, ordinary README cleanup, routine release-note edits, low-risk

single-file changes, tests-only coverage improvements, and bug fixes that

only restore the existing baseline. This is a method-pack signal, not a

runtime gate, not an authoritative GateDecision, and not completion

authority.

Durable architecture surfaces include canonical owner, public API/schema,

artifact shape, behavior contract, dependency direction, source-of-truth

owner, host compatibility strategy, install/discovery contract,

method-pack/runtime-core boundary, runtime-ready artifact boundary, evidence

model, retained fallback, adapter, compatibility path, duplicate owner,

retirement schedule, accepted architecture-scoped Implementation Drift, and

release/distribution strategy that future contributors would otherwise

misread.

```text

ADR Backfill Check:

```

If the suggested action is create, amend, or supersede, or if Baseline sync

is needed or unknown, use recording-architecture-decisions for the ADR

lifecycle and Baseline Sync Closure before making the final completion

claim. This keeps verification-before-completion as the completion owner

while delegating the ADR/baseline writeback decision to the dedicated skill.

  1. Governance Closure: for governance/cleanup/migration/compatibility/retirement work → final response must include. Do not skip this structure just because the implementation was small. Localize section labels and prose to the user's language; keep internal concepts in English only when they are product terms or file/path identifiers.

```

Repair Track: repaired object | action | impact | verification

Retirement Track: retired object | action | retained boundary | future trigger

Residual Risk: unverified | deferred

```

For work that adds, replaces, or retains old logic, also make the

delete-first closure explicit:

```text

Retirement Closure:

```

If the work retires old logic, chooses between delete-first and compat

retention, or touches source-of-truth deletion boundaries, also include:

```text

Anti-Entropy Declaration:

```

If User Confirmation Required: yes, completion cannot be claimed until the

workflow stops at a guard shaped like:

```text

Data Destruction Guard:

```

Mentioning a warning or destructive rule never authorizes execution. Broad

assent such as "OK" or "continue" is not scoped confirmation. If

persistent-state deletion or another irreversible source-of-truth action

happened without explicit scoped confirmation, report the task as not

complete.

Red Flags - QA Drift

Complexity Delta, Complexity Governance Suggestion, or residual-risk note

lingering-reference check

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.