Meta-Orchestrator: Vision to Backlog Pipeline
Purpose
Translate a high-level vision into a reviewed, dependency-aware backlog import plan for Swarm Manager, then create the items only after the user approves.
This skill supports long, iterative planning before creation. If the user wants to front-load context, avoid premature workshop auto-spawn, or work one cluster at a time, stay in planning mode until they explicitly ask to create items.
Required reading:
prompt-manager skill read swarm-manager-backlog-tools
Canonical Contract
When shaping backlog items, use the real Swarm Manager contract:
kind:idea | research | fix | execute | chorename: kebab-case item idtitledescriptionpriority:1-10effort:XS | S | M | L | XLresearch_target: only for research itemsdepends_on:["kind/name", ...]initiative: per-item initiative nameacceptance_allowacceptance_deny
Do not use scope. It is not part of the backlog contract.
Initiative metadata is supplied separately in the batch-create request's top-level initiatives array.
Scope
In scope
- parse messy input into candidate work items
- discuss the work with the user before creation
- preserve visual/theme clusters when clarifying
- inspect the codebase when existing scenarios or seams are involved
- identify dependencies, initiative groupings, and likely item splits
- preview and create backlog items through Swarm Manager CLI
- update existing backlog items instead of duplicating them when appropriate
Out of scope
- managing workshop rounds after creation
- executing the work
- making code changes outside Swarm Manager itself
Workflow
Phase 1: Intake
- Read the full input.
- If images or whiteboards are involved, transcribe with confidence flags.
- Check existing backlog for likely duplicates.
- Break the vision into candidate work clusters before forcing item boundaries.
- Present the candidate clusters/items back to the user.
Use the user's grouping when it is meaningful:
- whiteboard columns
- color-coded regions
- numbered lists that appear thematic rather than priority-based
- user-directed "let's start with this section first"
Phase 2: Clarify In Planning Mode
This phase may last many turns.
The default pattern is:
- work one cluster at a time
- clarify intent, value, and dependencies
- note what is still unknown
- keep a running planned-item list without creating anything
When the user says not to create items yet, do not create them.
Ask clarifying questions in small batches:
- prefer 2-5 related questions
- preserve the current cluster/theme
- ask confirmation-style questions when possible
Good planning outputs:
- major sub-initiatives
- provisional backlog items
- dependency chain
- implementation-order hypothesis
- what should be left for workshop agents to discover later
Phase 3: Inspect Existing Code Before Finalizing Items
If the work touches scenarios, APIs, CLIs, or skills that already exist, inspect the codebase before finalizing the backlog plan.
Minimum expectations:
- read the relevant scenario docs/PRDs if they exist
- inspect existing APIs, stores, handlers, and command flows
- identify whether a requested capability already partially exists
- decide whether the work is:
- extension of an existing scenario
- cross-scenario integration work
- greenfield replacement
Do not finalize backlog items from whiteboard text alone when code already exists and that inspection can materially improve the plan.
Phase 4: Shape Backlog Items
Split work into backlog items when that improves:
- ownership
- dependency clarity
- scenario locality
- execution order
Common split triggers:
- one whiteboard bullet spans multiple scenarios
- API and UI work should be separated
- research is needed before execution
- a greenfield replacement needs separate research/spec/runtime items
Useful item patterns:
researchfor architecture audits, signal extraction, and contract definitionexecutefor feature/runtime implementationfixfor targeted bug/risk correctionchorefor archiving/removing legacy structuresideafor greenfield specification or concept-definition work when implementation is intentionally deferred
Phase 5: Preview Before Create
Before creating, present the planned items to the user in review form.
The review should include:
- item title
- kind
- initiative
- priority
- effort
- dependencies
- a short description
Then preview the import with the CLI:
cat > /tmp/meta-orch-items.json <<'EOF'
{
"items": [
{
"kind": "research",
"name": "desktop-release-control-plane-audit",
"title": "Audit desktop release control plane",
"description": "Trace the real desktop release flow across deployment-manager, scenario-to-desktop, LPBS, and prompt-manager deployment skills.",
"priority": 1,
"effort": "M",
"initiative": "desktop-release-governance",
"acceptance_allow": [
"scenarios/deployment-manager/**",
"scenarios/scenario-to-desktop/**",
"scenarios/landing-page-business-suite/**",
"scenarios/prompt-manager/**"
]
}
],
"initiatives": [
{
"name": "desktop-release-governance",
"title": "Desktop Release Governance",
"description": "Shared release-control, traceability, and LPBS-delivery work for desktop monetization.",
"status": "active"
}
]
}
EOF
swarm-manager backlog batch-create --file /tmp/meta-orch-items.json --preview
Preview is the default safety gate for large imports. Use it before creation unless the user explicitly wants immediate creation and the plan is already tightly reviewed.
Phase 6: Create
Only create after user approval.
swarm-manager backlog batch-create --file /tmp/meta-orch-items.json
Workshop round 1 auto-initializes on item creation. Do not manually trigger it.
If the session produced significant architecture context, upload it so workshop agents inherit the planning context. You can upload to either a backlog item or the initiative itself:
Upload to a backlog item (for item-specific context):
swarm-manager backlog file-upload --kind <kind> --name <name> --path orchestration-summary.md --stdin <<'EOF'
# Meta-Orchestrator Summary
## Source
[what the planning session covered]
## Decisions Made
- ...
## Dependency Notes
- ...
## Unresolved Questions Deferred To Workshop
- ...
EOF
Upload to the initiative (for cross-item strategic context):
swarm-manager initiatives file-upload --name <initiative> --path orchestration-summary.md --stdin <<'EOF'
# Initiative Context
## Strategic Rationale
[why this initiative exists and what success looks like]
## Cross-Item Decisions
[decisions that affect multiple items in this initiative]
## Sequencing Notes
[implementation order rationale, dependency reasoning]
EOF
Prefer initiative-level uploads when the context spans multiple items. Prefer item-level uploads when context is specific to one item.
Duplicate Handling
Check duplicates at two levels:
- Within the session
If the same concept appears in multiple clusters, prefer one item with multiple dependents.
- Against the existing backlog
If an item already exists, update it with the new context instead of creating a duplicate unless the user clearly wants a separate item.
Greenfield Replacement Pattern
When an existing scenario should not be evolved in place:
- create a research item to extract reusable signal from the legacy implementation
- optionally create a chore item to archive/remove the legacy scenario
- create new greenfield spec/runtime items built from first principles
Do not frame this as "adapt the old scenario" if the actual intent is replacement.
Questioning Rules
- Preserve user grouping by default.
- Prefer cluster-by-cluster clarification over giant cross-cutting interrogations.
- Ask only what is needed to improve the plan materially.
- If the user has already given all they know, stop interrogating and move to codebase inspection plus planning.
- It is acceptable to leave some ambiguity for workshop agents as long as the backlog descriptions capture what is already known.
Output Template Before Creation
Use a concise review structure like:
Planned backlog import:
Initiative: desktop-release-governance
- research/desktop-release-control-plane-audit
- execute/deployment-manager-approval-gate-surfaces
- execute/deployment-manager-visual-validation-approval-flow
Initiative: emulator-platform
- research/emulator-extraction-plan
- execute/build-vrooli-emulator-linux-first
Critical path:
- research/desktop-release-control-plane-audit
- execute/deployment-manager-approval-gate-surfaces
- execute/deployment-manager-visual-validation-approval-flow
Anti-Patterns
- do not create items before the user approves
- do not use
scope - do not skip codebase inspection when the target scenarios already exist
- do not flatten everything into one initiative if the work naturally separates
- do not manually trigger workshop round 1
- do not ask one tiny question at a time for long planning sessions
- do not preserve a legacy scenario by inertia when the actual need is a greenfield replacement
Troubleshooting
| Problem | Response |
|---------|----------|
| User wants to discuss only, not create | Stay in planning mode and produce a planned-item list only |
| Vision is large and messy | Group into clusters first, then clarify one cluster at a time |
| Existing code contradicts the whiteboard assumption | Surface the mismatch explicitly and adjust the backlog plan |
| Many items span multiple scenarios | Split by seam and link with depends_on |
| The user wants context preserved for spawned workshop agents | Add orchestration-summary.md after creation |