[PROPOSED]
Growth Model vs Actuals Tracking
Unit economics of growth — measured against the plan, not reported in isolation.
The skill that turns "here are the numbers" into "here's what's drifting and why."
Reference: UoG formulas → ../../../shared/revops-domain-model.md §5
Reference: Confidence bands → ../../../shared/revops-domain-model.md §2
Config reads: uog_baseline_path, nrr_current, cs_platform_connected
Pre-flight
Read ~/.claude/plugins/config/claude-for-customer-success/rev-ops/CLAUDE.md and
~/.claude/plugins/config/claude-for-customer-success/company-profile.md.
If either is missing or contains [PLACEHOLDER] markers, stop and prompt for
/rev-ops:cold-start-interview.
Note from config: uog_baseline_path, nrr_current, cs_platform_connected
G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.
Use when
- Actual growth metrics need to be compared against the committed growth model
- Period-over-period tracking of growth model attainment is required — covers all three revenue vectors (Sales new logo, CS expansion, CS retention)
- Deviation from growth model needs to be surfaced with signal clarity
- CS leadership needs to see expansion NRR or retention GRR accountability signal against plan
Do NOT use for
- Forward scenario modeling (use scenario-modeling)
- Forecast variance root cause (use forecast-variance-analysis)
- Annual plan replanning trigger (use mid-year-replan-triggering)
Typical Activation
"Growth model vs actuals", "how are we tracking against the model", "growth model attainment", "actuals vs growth plan for [period]"
Reasoning Protocol
Before generating output, apply these primers:
- CLASSIFY: What type of growth model tracking request is this?
- Single-vector report (one of: new logo, expansion NRR, or retention GRR vs. plan)
- Full-model summary (all three vectors — cross-vector attainment snapshot)
- Variance memo trigger (threshold crossed on one or more vectors — memo generation + replan routing)
- Reporting mode (UoG baseline absent — actuals only, no variance analysis)
- CONSTRAINTS: What limits the solution space?
1. Confirm activation — user asking about plan vs. actual, unit economics, or NRR/GRR trend
2. Read UoG baseline from uog_baseline_path — if absent, run in reporting mode only; label output accordingly
3. Check CS platform connector for NRR/GRR actuals; check HubSpot for new logo actuals; declare fallback if unavailable
4. Apply G1 — variance projections require forecast language qualification
5. Apply G6 — data-as-of on all reads
6. Confirm accountability routing: Vectors 2–3 are CS-owned signals → route to CS leadership, not Sales
- EXPERT CHECK: What would a veteran RevOps growth analyst verify first?
- Is the UoG baseline confirmed present before running variance analysis? Comparing actuals
to an absent or stale baseline produces phantom variance — declare reporting mode and label
explicitly before surfacing any number.
- Are Vectors 2 and 3 routed to CS leadership, not Sales? Expansion NRR and GRR are CS
accountability signals — misrouting to Sales creates conflicting ownership and delays response.
- Is the variance threshold correctly applied per vector? >15% for new logo ARR, >5pp for NRR,
>3pp for GRR — applying a single threshold across vectors misses GRR signals and
over-triggers on normal NRR fluctuation.
- Is the replan trigger evaluated and declared? A crossed threshold requires an explicit
routing decision to mid-year-replan-triggering — not implicit in the variance memo.
- ANTI-PATTERNS: Common mistakes to avoid:
- Running variance analysis without confirming UoG baseline path is accessible (produces phantom variance)
- Routing CS-owned vectors (Expansion NRR, Retention GRR) to Sales leadership instead of CS leadership
- Applying forward-looking year-end projections without G1 qualification
- Surfacing CS platform or HubSpot reads without data-as-of timestamp (G6 violation)
After execution, verify:
- G1 qualification present on all year-end projections derived from variance analysis
- G6 data-as-of label applied to all CRM and CS platform reads
- CS-owned vector accountability correctly routed to CS leadership + RevOps
- Confidence: High when both CRM and CS platform are connected and baseline is present; Moderate when data is stale or baseline is absent (reporting mode)
- Confidence: [High] when both CRM and CS platform are connected and baseline is present / [Medium] when data is stale or baseline is absent (reporting mode) / [Low] if all inputs are manual or unverified
Three Growth Vectors
Vector 1 — New logo _(Sales-owned)_
Baseline fields: new_arr_target, ae_required (from UoG output)
Actuals: closed_won_ytd [CRM ✓ live]
Variance threshold: >15% behind or ahead of pro-rata plan
Accountability: Sales leadership
Vector 2 — Expansion _(CS-owned)_
Baseline fields: nrr assumption (from UoG inputs)
Actuals: current NRR by cohort [CS Platform ✓ live]
Variance threshold: >5 NRR points
Accountability: CS leadership — expansion NRR is a CS accountability signal,
not a RevOps-owned metric. CS leaders carry expansion attainment the same
way Sales leaders carry new logo attainment.
Vector 3 — Retention _(CS-owned)_
Baseline fields: GRR assumption (from UoG inputs if provided)
Actuals: current GRR [CS Platform ✓ live]
Variance threshold: >3 GRR points
Accountability: CS leadership — GRR is a CS accountability signal. A GRR
variance memo routes to CS leadership and RevOps jointly.
When baseline absent:
Run in reporting mode: surface actuals only, no variance analysis.
Label: [Variance analysis unavailable — UoG baseline not configured.
Reporting actuals only — Confidence: Low]
Variance Memo (fires when threshold crossed)
Variance memo for [vector]:
What diverged: [Vector] — actual [X] vs. plan [Y] (delta: [Z], threshold: [T])
Impact: At this rate, year-end ARR = $XXXk vs. $XXXk plan (−$XXXk)
Most likely factor: [Named evidence — not speculation]
Source: [CRM ✓ live / CS Platform ✓ live / Inferred]
Accountability routing:
Vector 1 (New logo) → Sales leadership + RevOps
Vector 2 (Expansion NRR) → CS leadership + RevOps
Vector 3 (Retention GRR) → CS leadership + RevOps
Replan trigger: [Yes — route to mid-year-replan-triggering / No]
Output
GROWTH MODEL VS ACTUALS — [Period]
[CRM ✓ live — as of YYYY-MM-DD] [CS Platform: ✓ live / Unavailable]
[UoG baseline: present [path] / absent — reporting mode only]
[Confidence: High/Moderate/Low]
Vector Owner Plan Actual Delta Signal
New logo ARR Sales $XXXk $XXXk −XX% [ON PLAN / ⚠ DRIFTING]
Expansion NRR (CS-owned) CS XXX% XXX% −Xpp [ON PLAN / ⚠ DRIFTING]
Retention GRR (CS-owned) CS XXX% XXX% −Xpp [ON PLAN / ⚠ DRIFTING]
[Variance memo if threshold crossed]
[DRAFT — RevOps and CS leadership]
[G1: Projections are models. Not revenue commitments.]
Reference Files
| File | Purpose |
|------|---------|
| references/reasoning-blueprint.md | Problem classification taxonomy, domain heuristics, common failure modes, and expert judgment patterns for this skill |
Security & Permissions
Network access: None direct — all external data access is mediated by host-provided MCP connector tools (HubSpot, CS platform, Slack, Linear). This skill makes no direct outbound HTTP calls.
Filesystem scope: None — this skill does not read or write local files. All data is provided at runtime via parameters or MCP connector responses.
Subprocess execution: None.
Dynamic code execution: None — pseudocode in this skill represents the logic contract and is not executed at runtime.
Data sensitivity: Inputs may contain confidential deal, customer, and revenue data. Handle with RevOps-level confidentiality.
Trust & Verification
Input trust model: All user-provided parameters are treated as untrusted at intake. Numeric inputs are validated for plausible range before use in calculations. String inputs are not evaluated as code.
Output trust model: All outputs are proposals or analytical inputs — no outputs constitute approved decisions, revenue commitments, or system actions without explicit human confirmation.
Connector data: Data retrieved via MCP connectors is treated as read-only observed state. Timestamps and data-as-of labels are applied to all connector-sourced values per G6.
Write-tier confirmation: Any proposed write to HubSpot, Linear, or Slack is surfaced as a draft requiring explicit user confirmation before execution.
Guardrails
- G1: All forward-looking variance projections require qualification
- G6: Data-as-of required on all reads
- When baseline absent: declare explicitly before any number is shown