[PROPOSED]
Annual Planning Workflow
Seven-phase gated planning cycle. Each phase produces a human-approved artifact
before the next begins. Phases can be run individually with --phase N.
Use when
- User initiates annual planning cycle, quota setting, or territory design process
- Annual planning workflow orchestration is needed across multiple RevOps domains
- GTM planning for a new fiscal year requires coordinated output across quota, territory, and comp
Do NOT use for
- Individual quota calculations (use quota-sensitivity-analysis)
- Comp modeling without full planning context (use comp-simulation)
- Mid-year replanning triggered by miss (use mid-year-replan-triggering)
Typical Activation
"Run annual planning", "start the planning cycle", "annual plan for [year]", "set quotas for next year", "kick off territory design"
Invokes: unit-of-growth-calculator v1.1.0 for capacity modeling (Phase 2)
Reference: UoG formulas → ../../../shared/revops-domain-model.md §5
Config reads: All planning parameters from company profile
Pre-flight
Read ~/.claude/plugins/config/claude-for-customer-success/rev-ops/CLAUDE.md and
~/.claude/plugins/config/claude-for-customer-success/company-profile.md.
If either is missing or contains [PLACEHOLDER] markers, stop and prompt for
/rev-ops:cold-start-interview.
Note from config: ae_quota, ae_attainment_planning_rate, current_ae_count,
arr_per_csm, nrr_current, avg_deal_acv, uog_baseline_path
G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.
Reasoning Protocol
Before generating output, apply these primers:
- CLASSIFY: What type of planning request is this?
- Full annual planning cycle (all 7 phases)
- Mid-year replan (subset of phases)
- Single-phase execution with
--phase N - Baseline update vs. new plan
- CONSTRAINTS: What limits the solution space?
1. Confirm activation — user initiating annual or mid-year planning
2. Read company profile — all seven planning parameters required; surface any missing ones
3. Check for existing plan baseline in uog_baseline_path — if present, offer update vs. new plan
4. Apply G2 — capacity model outputs are structural inputs, not hiring mandates
5. Apply G3 — comp plan outputs require HR + Finance dual review before rep communication
6. Apply G4 — territory proposals are drafts until dual-confirmed
- EXPERT CHECK: What would a veteran RevOps analyst verify first?
- Are all seven company profile parameters populated and current?
- Is the UoG baseline path configured? If absent, Phase 5 has no save target.
- Has the forecast scenario (P10/P50/P90) been selected before capacity modeling begins?
- Are CS constraint signals checked before AE headcount decisions? CS ceiling can invalidate an otherwise clean AE growth plan.
- ANTI-PATTERNS: Common mistakes to avoid:
- Skipping Phase 1 gate and running capacity modeling against an unvetted forecast
- Distributing comp plan outputs before HR + Finance dual review (G3 violation)
- Finalizing territory proposals without dual confirmation (G4 violation)
- Running phases out of order — each phase gates on the prior phase's approved artifact
After execution, verify:
- Each phase artifact is labeled [DRAFT] until its gate is cleared
- Baseline save (Phase 5) only runs after the planning scenario is confirmed
- Confidence: High when all company profile parameters are populated and UoG baseline is present; Moderate when any parameter is estimated or baseline is absent
- Confidence: [High] when all planning parameters populated and connectors live / [Medium] when any parameter estimated or connector unavailable / [Low] if all inputs are manual or unverified
Six Phases
Phase 1 — Forecast Scenarios
Run /rev-ops:scenario-modeling to produce P10/P50/P90.
Output: Three-scenario table with ARR and growth % for each scenario.
Gate: RevOps lead confirms scenarios are reasonable before Phase 2.
Phase 2 — UoG Three-Scenario Capacity Modeling
Invoke unit-of-growth-calculator once per scenario using Phase 1 output:
For each scenario (P10 / P50 / P90):
target_growth_pct = (Scenario_ARR − Current_ARR) ÷ Current_ARR
inputs: current_arr, target_growth_pct, nrr_current, segment, motion,
ae_quota, ae_attainment_planning_rate, arr_per_csm, touch_model
Present as comparison table:
Metric P10 Plan P50 Plan P90 Plan
New ARR target $XXXk $XXXk $XXXk
AEs required N N N
CSMs required N N N
CS headroom % XX% XX% XX%
Constraint signal [signal] [signal] [signal]
Gate — Critical Write: RevOps lead selects planning scenario.
Default: P50 if no selection within 48 hours (logged).
CS constraint signal surfaced for all three — if CS is the binding constraint
even at P10, that is the primary action item regardless of scenario selected.
Phase 3 — Quota Sensitivity Analysis
Run /rev-ops:quota-sensitivity-analysis using UoG-confirmed AE headcount
and New ARR Target from the selected scenario.
Gate: RevOps lead confirms. Finance sign-off if quota changes >10%.
Phase 4 — Comp Plan Simulation
Model payout at multiple attainment levels (50% / 65% / 75% / 85% / 100%).
Surface cost-to-company at each level. Flag unintended payout behaviors.
Gate — Critical Write: RevOps lead + HR/Finance dual confirmation.
G3 applies: no comp output distributed to reps without dual review.
Phase 5 — Baseline Save
Write confirmed UoG output to the path specified in uog_baseline_path
(or prompt to set path if absent). This becomes the annual plan baseline
that growth-model-vs-actuals-tracking compares against all year.
Gate — Critical Write: RevOps lead only.
Saves: full UoG calculation_result for the selected scenario
+ confirmed planning decisions log
+ OCV catalog version reference
+ date, confirmed by [name]
Phase 6 — Change Communication
Invoke /rev-ops:change-communication-packaging for any changes from
the quota model (Phase 3) or comp plan (Phase 4).
Gate: RevOps lead reviews all packages before distribution.
Output
Phase status tracker plus phase-specific artifacts: three-scenario capacity table (Phase 2), quota sensitivity table (Phase 3), comp simulation (Phase 4), baseline save confirmation (Phase 5), change communication package (Phase 6). Each phase artifact is labeled [DRAFT] until its gate is cleared.
Phase Status Tracking
ANNUAL PLANNING — [FY/Period]
─────────────────────────────────────────────────────────
Phase 1 Forecast Scenarios [ ] Pending / [✓] Complete / [⏸] Awaiting gate
Phase 2 Capacity Modeling (UoG) [ ] / [✓] / [⏸]
Phase 3 Quota Sensitivity [ ] / [✓] / [⏸]
Phase 4 Comp Plan Simulation [ ] / [✓] / [⏸]
Phase 5 Baseline Save [ ] / [✓] / [⏸]
Phase 6 Change Communication [ ] / [✓] / [⏸]
─────────────────────────────────────────────────────────
Reference Files
| File | Purpose |
|------|---------|
| references/reasoning-blueprint.md | Problem classification taxonomy, domain heuristics, common failure modes, and expert judgment patterns for this skill |
Security & Permissions
Network access: None direct — all external data access is mediated by host-provided MCP connector tools (HubSpot, CS platform, Slack, Linear). This skill makes no direct outbound HTTP calls.
Filesystem scope: None — this skill does not read or write local files. All data is provided at runtime via parameters or MCP connector responses.
Subprocess execution: None.
Dynamic code execution: None — pseudocode in this skill represents the logic contract and is not executed at runtime.
Data sensitivity: Inputs may contain confidential revenue planning and compensation data. Handle with RevOps-level confidentiality.
Trust & Verification
Input trust model: All user-provided parameters are treated as untrusted at intake. Numeric inputs are validated for plausible range before use in calculations. String inputs are not evaluated as code.
Output trust model: All outputs are proposals or analytical inputs — no outputs constitute approved decisions, revenue commitments, or system actions without explicit human confirmation.
Connector data: Data retrieved via MCP connectors is treated as read-only observed state. Timestamps and data-as-of labels are applied to all connector-sourced values per G6.
Write-tier confirmation: Any proposed write to HubSpot, Linear, or Slack is surfaced as a draft requiring explicit user confirmation before execution.
Distribution: Outputs contain revenue projections and pipeline data. Confirm receiving audience is authorized before sharing. All forward-looking figures carry [review — internal planning data] tags.
Guardrails
- G1: Forecast scenario outputs qualify as range models, not revenue commitments
- G2: Capacity outputs include: "Structural input. Hiring requires budget approval."
- G3: Comp plan output includes: "Requires HR + Finance dual review before rep distribution."
- G4: Territory proposals labeled: "[DRAFT — not final until dual-confirmed]"