Pre mortem is an AI agent skill from the GitHub repository borghei/Claude-Skills. Runs a pre-mortem that sorts launch risks into evidenced tigers, paper tigers and unspoken elephants, each with an owner. Use when a big launch, build or migration is coming, or the team has a bad feeling it cannot name.

How to use this skill

Skill file

Pre-Mortem Risk Analysis Expert

Overview

A pre-mortem is a prospective hindsight exercise: imagine that your product has launched and failed, then work backward to identify why. This skill uses the Tiger / Paper Tiger / Elephant classification to categorize risks by type and urgency, ensuring launch-blocking issues are addressed before launch while avoiding wasted effort on unlikely risks.

Core Capabilities

When to Use

Clarify First

Before running the pre-mortem, settle the inputs below. When one is missing or vague and would change the result, ask about it; when it wouldn't, use a sensible default and say which one you used.

Ask about the two or three inputs that matter most for this request, not the whole list. If the user wants a result straight away, produce it and state your assumptions at the top.

Workflow

  1. Settle the Clarify First inputs and run the session from references/methodology-and-tools.md (scene-setting, silent generation, cluster, classify, mitigate, elephants).
  2. Record each risk with description, category (tiger/paper_tiger/elephant) and evidence; tigers also need urgency (launch_blocking/fast_follow/track), and launch-blockers an owner and decision_date.
  3. Run risk_categorizer.py and fix its findings before the session closes.
  4. Done when the tool exits 0, every launch-blocker has an owner and a decision date, and each elephant has a person who will raise it.
python3 project-management/discovery/pre-mortem/scripts/risk_categorizer.py project-management/discovery/pre-mortem/assets/sample_risks.json          # exit 0
python3 project-management/discovery/pre-mortem/scripts/risk_categorizer.py project-management/discovery/pre-mortem/assets/sample_risks_flawed.json   # exit 1
python3 project-management/discovery/pre-mortem/scripts/risk_categorizer.py --demo --format json

The tool groups risks by category and urgency, flags elephants whose text carries escalation signals (no owner, blocked, security, compliance, legal and similar), and reports two findings a rushed session skips: a launch-blocking tiger with no owner or decision_date, and a tiger whose evidence is speculative ("might", "could", "we think"), which makes it a paper tiger until shown otherwise. Exit codes: 0 no findings, 1 findings, 2 bad input (missing file, invalid JSON, missing fields). Document the session with assets/pre_mortem_template.md.

Anti-Patterns

Mitigating Paper Tigers

Mistake: "AWS regional outage on launch day" is classed as a Tiger and gets weeks of redundancy work, with no evidence that it is likely.

Why it happens: A frightening consequence feels like a high probability.

Instead: For every Tiger, write the evidence that it could actually happen. A described consequence alone does not count. With no evidence, reclassify it as paper_tiger and cover it with a standard runbook.

Risks too vague to act on

Mistake: The list holds "stakeholder issues", "scope creep" and "technical risk".

Why it happens: Generic labels are safe to say aloud and need no evidence.

Instead: Describe each risk as a concrete failure scenario in 1-2 sentences, such as "the CRO blocks launch on Day -7 because the enterprise SKU was cut". Translate worries ("the design feels weak") into a measurable consequence, or drop them.

Running the pre-mortem too late

Mistake: The session happens a week before launch and surfaces a Tiger that needs four weeks of work. The team launches anyway.

Why it happens: Pre-mortems get scheduled as a launch-readiness check instead of a planning step.

Instead: Run the first pre-mortem at project kickoff and a second one around Day -30. For each risk, confirm it can still be mitigated in the time left.

Nine more, each with a bad and a good example: references/red-flags.md.

References

Load the reference that matches the task — keep this file lean and pull detail on demand:

Scope & Limitations

In Scope: prospective hindsight using the "14 days after launch failure" framing; Tiger / Paper Tiger / Elephant classification with urgency levels; automated elephant escalation detection; risk registry generation; facilitation methodology for in-person and remote teams.

Out of Scope: ongoing risk management and tracking (see senior-pm/scripts/risk_matrix_analyzer.py); quantitative probability/impact scoring (senior-pm/); product discovery and hypothesis validation (brainstorm-experiments/); technical architecture risk assessment (engineering/ skills).

Important Caveats: most effective with 4-8 participants; the elephant escalation keyword check is a heuristic; pre-mortems complement, not replace, assumption mapping (identify-assumptions/); psychological safety is a prerequisite.

Files

| File | Purpose |

|------|---------|

| scripts/risk_categorizer.py | Categorizes risks, flags elephants to escalate, gates on unowned launch-blockers and speculative tigers |

| assets/sample_risks.json, assets/sample_risks_flawed.json | Runnable inputs: sound (exit 0) and flawed (exit 1) |

| assets/pre_mortem_template.md | Session template |

| examples/shared-dashboards-v1-pre-mortem.md | Worked session |

| references/*.md | See References |