Implementation planning is an AI agent skill from the GitHub repository theheavenlyd3mon/hermes-profiles. Plan the implementation of an approved requirement or specification: produce an executable, dependency-aware delivery plan covering work breakdown, dependency mapping, critical path, ownership, parallelism and sequencing, rollout strategy, rollback and recovery paths, and verification against the or

How to use this skill

Skill file

Implementation Planning

Turn an approved requirement or specification into an executable delivery plan.

This skill is a planning discipline — it produces a plan, not code, not a spec, and

not a lifecycle orchestration.

When to load this skill

Load when the input is an approved requirement, specification, or decision and

the task is to produce a concrete delivery plan that accounts for dependencies,

sequencing, risk, and verification.

| Trigger | Example |

|---|---|

| An approved SPEC.md or product brief needs a delivery plan | "Plan the implementation for the payments checkout spec" |

| A cross-team or multi-repo feature needs work coordination | "Plan the rollout for the identity-migration change across three services" |

| A data migration needs a staged execution plan | "Plan the schema migration with rollback stages" |

| A risky or high-stakes change needs a rollout strategy | "Plan the staged rollout for the auth-provider replacement" |

| Multiple workstreams need dependency mapping and critical-path analysis | "Map dependencies and critical path for the platform upgrade" |

When not to use

requirement. Route to product-discovery.

Route to spec-driven-development.

execute. Route to backend-engineering,

frontend-engineering, or

software-architecture-analysis.

not execute the neckbeard lifecycle gates, delivery-packet sequencing, or

phase orchestration. Delivery execution is a separate concern.

specification has not been approved, stop. Planning unapproved work is an

explicit stop condition. Record the missing approval and escalate; do not

produce a plan.

Entry gate: prerequisite approval

Before any planning work begins, verify that the input requirement or

specification has been approved by an authorized decision-maker. An approved

input is one that has passed a review gate (SDD spec review, product brief

approval, architecture decision record accepted, or equivalent).

If the input is not approved:

  1. Stop. Do not produce a draft plan, partial work breakdown, or

"assume-approved" artifact.

  1. State the missing approval explicitly: what decision is pending and who

(role or name) must approve it.

  1. Route to the appropriate upstream skill:

This gate exists because a plan built on an unapproved foundation wastes

every downstream team's time and creates false certainty.

Core workflow

  1. Ingest the approved input. Read the approved requirement, specification,

or decision record. Capture the source, approval date, approver, and any

explicit constraints or non-goals.

  1. Decompose into work. Break the approved scope into vertical slices or

workstreams that deliver independent value. Prefer vertical slices (end-to-end

capability) over horizontal layers (database then API then UI). Each slice

must have a clear completion criterion.

  1. Map dependencies. Identify every dependency: upstream inputs, downstream

consumers, shared services, data stores, platform capabilities, team

availability, and external vendors or partner teams. Distinguish hard

dependencies (blockers) from soft dependencies (preferences). Record them in

the dependency record.

  1. Identify the critical path. Trace the longest chain of dependent work

that determines the earliest possible completion. Flag any dependency that,

if delayed, shifts the critical path.

  1. Assign ownership. Every workstream and every dependency needs an owner.

Ownership means accountability for completion, not necessarily doing the

work personally. Record owners by name or role.

  1. Sequence and parallelize. Order work to respect dependencies and maximize

parallelism. Identify which slices can run concurrently, which must be

sequential, and where parallel tracks must synchronize.

  1. Design the rollout strategy. Define how the change reaches production:

big-bang, staged (by customer, region, percentage), canary, feature-flagged,

or a combination. Define the rollout stages, gates, and duration of each stage.

  1. Design rollback and recovery. For every rollout stage, define the

rollback path: what triggers a rollback, how to execute it, how long it takes,

and what state is left behind. Include data rollback where applicable.

  1. Verify against the original requirement. Trace every workstream back to

the approved input. Confirm nothing is missed and nothing extra is included.

Record any deliberate scope decisions.

  1. Identify unresolved decisions and risks. List every decision that could

not be resolved during planning and every residual risk. Assign each an owner

and a resolution deadline.

Outputs

An implementation plan includes these sections. Templates are in templates/.

| Output | Template | Purpose |

|--------|----------|---------|

| Work breakdown | templates/implementation-plan-template.md | Vertical slices, workstreams, completion criteria, ownership |

| Dependency and handoff record | templates/dependency-record.md | Dependency map, critical path, handoff contracts between teams |

| Risk, decision, verification record | templates/risk-decision-verification.md | Risks, unresolved decisions, assumptions, verification checklist |

Cross-team and cross-repository planning

This skill does not assume a single repository or team. When the approved

requirement spans multiple repositories, teams, or organizations:

the contract (API, schema, event, or handoff artifact) and its owner.

not only at the end.

Slack channel, or status dashboard.

switch, phased migration) and the backfill/reconciliation plan.

Staged rollout and migration planning

When the change carries material risk, the plan must include a staged rollout

strategy. See references/discovery-brief.md for

how this skill's rollout planning relates to release-engineering's

pipeline design and site-reliability-engineering's

SLO-based gradual rollout.

At minimum, a staged rollout plan defines:

For data migrations, additionally include:

Handoff to specialist skills

This skill produces a plan. Specialist skills execute the plan. The handoff

from planning to execution is a deliberate boundary — do not let planning bleed

into implementation.

| When the plan covers... | Hand off to |

|---|---|

| Specification authoring or formal phase gates | spec-driven-development |

| Discovery of unvalidated requirements | product-discovery |

| QA strategy, test planning, or verification design | qa-methodology |

| Release pipeline, promotion gates, or canary mechanics | release-engineering |

| Internal developer platform or CI/CD infrastructure | platform-engineering |

| Security requirements, threat modeling, or secure design | secure-software-engineering |

| Reliability targets, SLOs, incident response, or operational readiness | site-reliability-engineering |

| Architecture decisions that need formal ADRs | adr-authoring |

| API contract design or evolution | api-design-and-evolution |

| Data pipeline, schema, or storage design | data-engineering |

When a specialist skill listed above already owns a section of the plan (e.g.,

rollout mechanics are owned by release-engineering), this skill cites the

specialist's output rather than re-deriving it. The plan names the specialist

artifact and its owner; it does not duplicate the specialist's method.

File map

| Path | Load when |

|---|---|

| references/discovery-brief.md | Understanding what this skill owns vs. hands off to adjacent skills |

| templates/implementation-plan-template.md | Producing a full implementation plan |

| templates/dependency-record.md | Mapping dependencies, critical path, and handoff contracts |