Premortem
Overview
Before committing to a plan, the team imagines that plan has already failed catastrophically, then works backward to enumerate causes. The retrospective frame ("it failed — what caused it?") surfaces risks the prospective frame ("what could go wrong?") systematically misses. Gary Klein operationalized this in HBR (2007), grounded in Mitchell-Russo-Pennington (1989) showing prospective hindsight increases correct failure-mode identification by 30%.