Dpia mitigation plan

From mukul975/Privacy-Data-Protection-Skills · View interactive version

Dpia mitigation plan is an AI agent skill from the GitHub repository mukul975/Privacy-Data-Protection-Skills. Structures risk mitigation planning and residual risk tracking for Data Protection Impact Assessments under GDPR Article 35(7)(d). Covers mitigation measure identification, implementation tracking, residual risk acceptance, and Art. 36 prior consultation triggers. Keywords: DPIA mitigation, risk tre

How to use this skill

Skill file

DPIA Mitigation Planning

Overview

Article 35(7)(d) GDPR requires a DPIA to include "the measures envisaged to address the risks, including safeguards, security measures and mechanisms to ensure the protection of personal data and to demonstrate compliance with this Regulation." This skill provides a structured mitigation planning framework.

Mitigation Strategy Categories

Technical Measures

| Category | Examples | GDPR Reference |

|----------|----------|----------------|

| Encryption | At-rest, in-transit, end-to-end | Art. 32(1)(a) |

| Pseudonymisation | Tokenisation, hashing, key-coded | Art. 25(1), Art. 32(1)(a) |

| Access controls | RBAC, MFA, privileged access management | Art. 32(1)(b) |

| Data minimisation | Field-level reduction, aggregation, sampling | Art. 5(1)(c), Art. 25(1) |

| Anonymisation | k-anonymity, differential privacy, generalisation | Recital 26 |

| Monitoring | SIEM, DLP, anomaly detection | Art. 32(1)(d) |

Organisational Measures

| Category | Examples | GDPR Reference |

|----------|----------|----------------|

| Policies | Data protection policy, acceptable use | Art. 24(2) |

| Training | Privacy awareness, role-specific training | Art. 39(1)(b) |

| Contracts | DPAs, joint controller arrangements, NDAs | Art. 28, Art. 26 |

| Audits | Internal audits, processor audits, certification | Art. 28(3)(h) |

| Governance | DPO oversight, privacy committee, RACI | Art. 37-39 |

| Incident response | Breach procedures, notification protocols | Art. 33-34 |

Mitigation Plan Structure

For each identified risk:

  1. Risk reference -- Link to DPIA risk register entry
  2. Inherent risk level -- Before mitigation
  3. Proposed measures -- Specific technical and organisational controls
  4. Implementation owner -- Accountable person
  5. Implementation deadline -- Target completion date
  6. Verification method -- How effectiveness will be confirmed
  7. Residual risk level -- After planned mitigation
  8. Acceptance decision -- Within appetite / escalation required / prior consultation

Residual Risk Decision Framework

Residual Risk LOW → Accept; document; routine monitoring
Residual Risk MEDIUM → Accept with enhanced monitoring; annual review
Residual Risk HIGH → Escalate to senior management; consider additional measures
Residual Risk VERY HIGH → Art. 36 prior consultation required before processing

Implementation Tracking

Each mitigation measure progresses through:

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.