SEI Analytics
Configure sprint analytics, investment allocation, capacity forecasting, and release readiness assessments in Harness Software Engineering Insights.
Instructions
Step 1: Establish Scope
Confirm the user's org, team, and tracking period.
Call MCP tool: harness_list
Parameters:
resource_type: "project"
org_id: "<organization>"
Step 2: Identify the SEI Task
Determine which analytics the user needs:
- Sprint Analytics -- Velocity, estimation accuracy, scope change tracking
- Investment Allocation -- Engineering time breakdown by category
- Sprint Planning and Capacity Forecast -- Data-driven sprint planning
- Release Readiness Assessment -- Checklist for release go/no-go
Step 3: Configure Sprint Analytics
Gather from the user:
- Team name and sprint length (weeks)
- Tracking period (last N sprints)
- Issue tracker integration (Jira, Azure DevOps, Linear)
Analyze sprint metrics:
Velocity:
- Story points committed vs. completed per sprint
- Velocity trend over the tracking period
- Carryover rate (% of stories that spill into next sprint)
Estimation Accuracy:
- Actual vs. estimated story points across sprints
- Which issue types are consistently underestimated
- Estimation accuracy trend (improving or degrading)
Scope Change:
- Stories added mid-sprint (scope creep %)
- Stories removed mid-sprint
- Net scope change and its impact on completion rate
Delivery Composition:
- Breakdown by issue type: features, bugs, tech debt, maintenance
- Breakdown by priority: P0/P1 vs. lower priority
- Team-level vs. individual-level trends
Step 4: Analyze Investment Allocation
Gather from the user:
- Teams to analyze
- Time period for analysis
- Investment categories (features, bugs, tech debt, maintenance, ops)
Calculate allocation:
- % of engineering time per category
- Compare against target allocation (e.g., 70% features, 15% tech debt, 10% bugs, 5% ops)
- Trend over time: is tech debt growing or shrinking?
- Per-team breakdowns to identify teams disproportionately spending on bugs or ops
Present with:
- Current allocation vs. target allocation
- Recommendations for rebalancing
- Impact of current allocation on velocity and quality trends
Step 5: Sprint Planning and Capacity Forecast
Gather from the user:
- Sprint number, duration, and team size
- Planned PTO, meetings, and other commitments
Calculate capacity:
- Available engineering days = team size * sprint days - PTO - meeting overhead
- Historical velocity per engineer per sprint
- Recommended story points for the sprint (based on rolling average)
Risk factors to flag:
- Large stories (>8 points) that could block the sprint
- Dependencies on other teams
- Carryover from previous sprint
- Tech debt items that may slow feature work
Step 6: Release Readiness Assessment
Gather from the user:
- Service name, version, target environment
- Change summary and target release date
Assess readiness:
Code Quality:
- Code coverage delta (current vs. threshold)
- Static analysis findings (new warnings or errors)
- Code review completion (all PRs reviewed and approved)
Pipeline Health:
Call MCP tool: harness_list
Parameters:
resource_type: "execution"
org_id: "<organization>"
project_id: "<project>"
- CI pipeline pass rate for the release branch
- All required stages green (build, test, security, integration)
Testing:
- Unit test pass rate and coverage
- Integration test results
- Performance test results vs. baseline
Security:
- No unresolved critical or high CVEs
- Security scan completed and approved
- Compliance attestations present
Operational Readiness:
- Monitoring and alerting configured for the release
- Runbooks updated for new features
- Rollback plan documented and tested
Present as a structured readiness report with GO/NO-GO recommendation.
Examples
- "Show sprint velocity trends for the platform team" -- Analyze committed vs. completed points over the last N sprints
- "How is our engineering investment split between features and bugs?" -- Calculate investment allocation with recommendations
- "Help plan Sprint 24 based on our capacity" -- Calculate available capacity and recommend story point commitment
- "Is the checkout-service v2.1 ready to release?" -- Run full readiness assessment with go/no-go recommendation
- "Why are our sprints always over-committed?" -- Analyze estimation accuracy and scope change patterns
Performance Notes
- Sprint analytics require consistent use of story points across the team -- mixed estimation methods reduce accuracy.
- Investment allocation analysis needs accurate issue labeling -- unlabeled issues default to "unclassified" and skew results.
- Capacity forecasts should account for context-switching overhead (typically 10-20% of engineering time).
- Release readiness assessments should run at least 24 hours before the planned release date.
Troubleshooting
Velocity Data Inconsistent
- Verify story points are assigned before sprint start (not mid-sprint)
- Check that completed stories are marked done within the sprint, not after
- Ensure the issue tracker integration is syncing correctly
Investment Allocation Missing Categories
- Check issue labeling conventions -- all issues should have a type (feature, bug, tech debt)
- Review the mapping between issue tracker labels and SEI categories
- Add default categorization rules for unlabeled issues
Release Readiness Check Incomplete
- Verify all pipeline stages have run for the release branch
- Check that security scan results are available for the release artifacts
- Ensure monitoring configuration has been validated in staging