Dx packaging push upgrade configure is an AI agent skill from the GitHub repository forcedotcom/sf-skills. Use this skill to plan, schedule, and monitor Salesforce package push upgrades from a Dev Hub. Finds subscriber orgs via the PackageSubscriber object, resolves and validates the target package version, builds a best-practice batched schedule (pilot sandboxes, then staggered off-peak production batch

How to use this skill

Skill file

Plan and drive a Salesforce package push upgrade end-to-end: find subscriber orgs, resolve the

target version, batch a schedule per best practices, generate the org CSV, run the sf CLI

push-upgrade commands after explicit confirmation, and monitor the results.

Push upgrades change a package in the customer's org without their action. This is outward-facing

and hard to reverse. The default posture of this skill is generate → preview → confirm → run:

never call push-upgrade schedule or push-upgrade abort until the user has seen the batch plan and

the org list and said go. See references/best-practices.md before scheduling anything to production.

Inputs

Gather these from the user's request; parse identifiers loosely wherever they appear:

If the Dev Hub is not given, assume the default Dev Hub owns the package and verify by querying

rather than prompting up front:

  1. Read the default from sf config get target-dev-hub --json. If none is set, skip to step 3.
  2. Probe that hub for the package — reuse Phase 1's resolution query against the given 033/04t

(or SELECT Id, Name FROM MetadataPackage if only a name is known). If it returns the package,

you've confirmed ownership and done Phase 1 in one step — proceed, naming the resolved Dev Hub.

  1. Only if the probe fails (no matching rows, or an auth/permission error), fall back to asking:

run sf org list --json and ask the user which Dev Hub owns the package, then re-probe.

This keeps the happy path unattended while still catching a wrong/empty hub before any subscriber

query or plan. Push upgrade objects and commands run against the Dev Hub / package-owning org, not

a subscriber org.


Phase 0 — Confirm scope and prerequisites

Establish these before doing anything else; ask only for what you can't infer:

  1. Package type — 2GP managed, unlocked, or a 1GP→2GP migration (--migrate-to-2gp).

and the feature must be enabled via a Salesforce Partner Support case. Unlocked packages

have push upgrades enabled by default.

  1. Dev Hub is authenticated — sf org display --target-org <devhub> --json. If it fails, tell the

user to run sf org login web --alias <devhub> and wait.

  1. Permission — scheduling needs the Create and Update Second-Generation Packages user permission

on the Dev Hub. If a later command fails with an auth/permission error, surface that as the likely cause.

Do not assume security-review/enablement status — if the user hasn't confirmed it, note it as a

prerequisite they must verify, and continue building the plan (it's still valid).


Phase 1 — Resolve the package and target version

Goal: end with a confirmed 033 package ID and a 04t target version ID that is a valid push target.

If the Dev Hub was resolved via the default-hub probe in Inputs above, that probe already ran

this resolution query — you may already have the package/version in hand. Don't re-query; pick up at

validation (step 2).

  1. If only the 04t is known, resolve its package and version number:

```bash

sf data query --target-org <devhub> \

--query "SELECT Id, MetadataPackageId, Name, MajorVersion, MinorVersion, PatchVersion, BuildNumber, ReleaseState, IsDeprecated FROM MetadataPackageVersion WHERE Id = '<04t>'"

```

  1. Validate the target version is a legal push target:

active, non-beta version.

push a change a normal upgrade couldn't make (e.g. deleting components, deprecated-then-removed).

  1. If the user only gave a 033, list candidate versions so they can pick the target:

```bash

sf data query --target-org <devhub> \

--query "SELECT Id, Name, MajorVersion, MinorVersion, PatchVersion, BuildNumber, ReleaseState FROM MetadataPackageVersion WHERE MetadataPackageId = '<033>' AND ReleaseState = 'Released' ORDER BY MajorVersion DESC, MinorVersion DESC, PatchVersion DESC, BuildNumber DESC"

```

See references/objects.md for full field lists.


Phase 2 — Find subscriber orgs (PackageSubscriber)

Query PackageSubscriber on the Dev Hub / License Management Org to discover who has the package

installed and at what version. OrgKey is the org ID that goes in the CSV.

Baseline query (installed subscribers on production orgs, below the target version):

sf data query --target-org <devhub> \
  --query "SELECT OrgKey, OrgName, OrgStatus, OrgType, InstanceName, MetadataPackageVersionId, InstalledStatus, HasRestrictionEnabled FROM PackageSubscriber WHERE MetadataPackageId = '<033>' AND InstalledStatus = 'i'"

Then apply the eligibility filters — this is where the skill adds judgment. Walk the user through:

and resolve each subscriber's version numbers so you push only to orgs strictly below the target.

Push upgrades can't downgrade; an org already at the target is a silent no-op (request/job

report Succeeded, no error), not a detectable failure — so filter these out up front.

production. Offer to split the list by OrgType.

OrgType** (a Production org can be Trial/Demo/Free). Typically exclude only Inactive

(OrgStatus != 'Inactive'); do not whitelist = 'Active' or you'll silently drop live

non-Active production subscribers.

where HasRestrictionEnabled = true or CustomUpgradeType = 'BlockedBySubscriber'. Pushing to a

restricted org will error; filter them out up front and report the count.

Report a summary table (counts by OrgType, by current version, restricted/excluded) so the user can

sanity-check the population before batching. See references/soql-recipes.md for ready-to-run variants.


Phase 3 — Build the batched schedule (best practices)

Do not write any .csv file in this phase. The plan is the only deliverable here — CSVs are a

Phase 4 action, created only after the user approves and you are about to run schedule. Before you

end this turn, confirm you have written at most one file (the plan itself); if you find yourself

about to call a file-write tool with a .csv path, stop — that belongs in Phase 4, not here.

Do not dump every org into one request. Propose a batch plan grounded in

references/best-practices.md:

(a week+ for sandboxes) before production.

by InstanceName/time zone where possible. --start-time is UTC — state the local-time intent

and the UTC value you computed.

release** before major pushes; avoid Salesforce maintenance windows.

Produce a concrete plan the user approves, e.g.:

Batch  Population              Count  Local target       --start-time (UTC)
0      Sandboxes (pilot)       12     immediate          (omit -t)
1      Prod, AMER off-peak     80     Tue 02:00 PT       2026-08-11T09:00:00
2      Prod, EMEA off-peak    140     Wed 02:00 CEST     2026-08-12T00:00:00
3      Prod, APAC off-peak     60     Thu 02:00 AEST     2026-08-12T16:00:00
...

Convert each batch with the UTC offset in force on the push date, not the region's standard offset

(e.g. PDT is UTC−7 and CEST is UTC+2 in summer; AEST is UTC+10 until Sydney moves to AEDT, UTC+11, in

October). Regions east of UTC cross the date line: 02:00 local on Thursday is Wednesday in UTC, so

the UTC date in --start-time is the day before the local date. Show both in the plan.

For each batch, show the org-ID CSV inline as a fenced code block — one OrgKey per line, no

header, one org ID per row — labeled with the filename it will be saved under (e.g.

push-batch-1-amer.csv). Confirm the contents with the user. Don't create the .csv files while

planning; write them in Phase 4, only once the user approves and you are about to run schedule.


Phase 4 — Schedule (confirm, then run)

Show the exact commands and the org counts, then wait for explicit confirmation before running any

schedule. Once approved, write each batch's CSV file (contents exactly as confirmed in Phase 3), then

run one command per batch:

sf package push-upgrade schedule \
  --target-dev-hub <devhub> \
  --package <04t-target-version> \
  --org-file push-batch-1-amer.csv \
  --start-time "2026-08-11T09:00:00"

Notes and variants:

version installed).

monitor and to abort.

After scheduling, record the batch → 0DV mapping for the user (a small table).


Phase 5 — Monitor, triage, and abort

Prefer the CLI for status; it takes the 15-char 0DV from schedule directly (no need to expand

the ID). Only drop to SOQL for per-org detail, errors, or a durable status rollup.

Not every failure yields a queryable row. A request rejected at schedule time (e.g. an

ineligible/non-subscriber org id → INVALID_OPERATION) is stranded at Created with **zero

PackagePushJob rows**, so the SOQL below returns nothing. Its only trace is schedule's own

output/exit code and a local <cwd>/job_errors/push_request_<id>_errors.log file — pair SOQL polling

with checking schedule's result; don't read "no job rows" as "nothing went wrong."

Report one request — the primary status check:

sf package push-upgrade report --target-dev-hub <devhub> --push-request-id <0DV>

List all requests for the package (033):

sf package push-upgrade list --target-dev-hub <devhub> --package <033> --scheduled-last-days 30

Filter with --status — the CLI enum is `Created | Cancelled | Pending | In Progress | Failed |

Succeeded (note the CLI uses Cancelled/In Progress`; the object picklist uses

Canceled/InProgress — see references/objects.md). Add --show-push-migrations-only for migrations.

When reading either command programmatically, add --json and parse the stable keys — do not scrape

the human table (its columns, including the Num Orgs * counts, are display-only and vary by CLI

version). See references/cli-reference.md → "Surviving CLI drift".

Dropping to SOQL — resolve the full 18-char Id first

The 0DV returned by schedule is 15 characters. The CLI accepts it as-is, but for direct object

queries there are two gotchas the live run exposed:

Resolve the canonical 18-char Id once (a 15-char value is valid in an Id = filter), then reuse it:

sf data query --target-org <devhub> --json \
  --query "SELECT Id, Status FROM PackagePushRequest WHERE Id = '<0DV>'"

Status rollup (durable source) — for "how many orgs succeeded/failed," query the jobs directly

rather than relying on CLI table decorations:

sf data query --target-org <devhub> \
  --query "SELECT Status, COUNT(Id) total FROM PackagePushJob WHERE PackagePushRequestId = '<0DV-18char>' GROUP BY Status"

From that rollup, report progress explicitly — don't just echo the raw counts:

attempting. State how many remain Pending/InProgress.

not total, or still-queued orgs will drag the number down and read like failures.

(e.g. 40 of 80 = 50%), keeping per-batch % success separate. Don't headline a single blended

"% now on the target version" — attempted-vs-planned and succeeded-vs-attempted are different signals,

and collapsing them misstates where the rollout stands.

The job Status picklist is Created | Pending | InProgress | Succeeded | Failed | Canceled (the object

uses InProgress/Canceled — one word — unlike the CLI's In Progress/Cancelled).

Per-org detail and errors — go to the objects when a request shows failures. One PackagePushJob

is created per org; failures attach PackagePushError rows:

sf data query --target-org <devhub> \
  --query "SELECT Id, SubscriberOrganizationKey, Status, StartTime, EndTime FROM PackagePushJob WHERE PackagePushRequestId = '<0DV-18char>'"

sf data query --target-org <devhub> \
  --query "SELECT PackagePushJobId, ErrorSeverity, ErrorType, ErrorTitle, ErrorMessage, ErrorDetails FROM PackagePushError WHERE PackagePushJobId IN (SELECT Id FROM PackagePushJob WHERE PackagePushRequestId = '<0DV-18char>')"

ErrorType values include DeployError, ApexTestFailure, LockingFailure, IneligibleUpgrade.

Summarize failures by ErrorType so the user can decide whether to re-push a subset.

Decide: continue, hold, or re-push (when the failure rate is high)

Staggering only pays off if you act on a bad batch before the next one runs. After each batch:

  1. Gate the next batch on this batch's result. Compute the batch's failure rate from the rollup

above. If it exceeds your tolerance for the blast radius — a reasonable default is ≥10–20%,

tighter for large batches — hold the rollout: do not schedule the next batch, and abort

any next batch already sitting in Pending. You cannot abort a request that's already

InProgress or completed (see Abort below), so the real lever is the unstarted batch, never the

running one — never promise to stop a batch that's already executing.

  1. Triage by ErrorType before you decide — not every failure means stop.

busy, or an org slipped to/above the target). Usually safe to re-push the affected subset

after retrying or excluding them, without halting the plan.

rollout, fix the package, cut and validate a new version, and restart — don't re-push the

same build and expect a different result.

  1. Re-push a subset, not everyone. Build a fresh CSV of only the failed OrgKeys

(PackagePushJob WHERE Status = 'Failed') once the cause is understood or a fix is shipped, then

re-run Phase 4 for just that list.

Confirm the upgrade actually landed

A Succeeded request/job is the request's own view. For real proof, verify the installed version:

target 04t. This snapshot can briefly race the push (a check moments after Succeeded may still

show the old version) — re-query rather than concluding it failed.

```bash

sf data query --target-org <devhub> --json \

--query "SELECT OrgKey, MetadataPackageVersionId, SystemModstamp FROM PackageSubscriber WHERE MetadataPackageId = '<033>' AND OrgKey = '<orgId>'"

```

InstalledSubscriberPackage. Note SubscriberPackage.NamespacePrefix can't be filtered in the

WHERE clause; select it and filter client-side:

```bash

sf data query --target-org <subscriber-org> --use-tooling-api --json \

--query "SELECT SubscriberPackage.Name, SubscriberPackage.NamespacePrefix, SubscriberPackageVersionId, SubscriberPackageVersion.MajorVersion, SubscriberPackageVersion.MinorVersion, SubscriberPackageVersion.PatchVersion, SubscriberPackageVersion.BuildNumber FROM InstalledSubscriberPackage"

```

Abort — only requests in Created or Pending can be aborted (an in-progress/completed one can't).

Takes the 15-char 0DV directly:

sf package push-upgrade abort --target-dev-hub <devhub> --push-request-id <0DV>

Confirm with the user before aborting.


Output discipline

Write a single, focused plan the user can act on — not an exhaustive report:

requests do not need a batch schedule — don't invent one.

hasn't reached unless they asked for the forward plan.

planning — the plan stays the single deliverable. The files are only created at schedule time (Phase 4).

Guardrails

downgrade, so the target must be ≥ each org's installed version. An org already at** the

target is a silent no-op — the request and its job report Succeeded (no PackagePushError), it

does not fail — so exclude same-version orgs up front instead of relying on a failure to catch them.

fail on them.

the next batch (and abort any next batch still Pending) until the errors are triaged — an

InProgress or completed batch can't be stopped, so the only lever is the unstarted one.

integration-breaking changes (validation rules, formula fields, removed components), call it out and

push to sandboxes first.

need, remind the user to ship a post-install script + permission set (see best-practices).

References

PackagePushError, MetadataPackageVersion.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.