Writing plans

From hashgraph-online/awesome-codex-plugins · View interactive version

Writing plans is an AI agent skill from the GitHub repository hashgraph-online/awesome-codex-plugins. Use when you have an approved spec or written requirements for a multi-step task that needs a durable plan document before touching code. Small, single-owner, or fast-path tasks do not need this skill.

How to use this skill

Skill file

<EXPLICIT-MODE-GATE>

If activation mode is explicit (~/.config/aegis/config.toml has

activation_mode = "explicit", or AEGIS_ACTIVATION_MODE=explicit is visible

in the environment) and the current user request did not explicitly invoke

Aegis or this skill by name, exit back to the fast path: answer concisely

without this workflow's checklist, ceremony, or document requirements. If the

user explicitly named Aegis or this skill, proceed normally.

</EXPLICIT-MODE-GATE>

Execute

→ Existing parent plan/spec and a tiny execution slice? → Use Planless Slice Lane.

→ Mechanical or bounded change with no durable boundary (no new owner,

contract, schema, public API, migration, or compat surface)? → **Use

Planless Slice Lane without a parent document.**

→ Approved spec/requirements for a new workstream or an escalation trigger? →

Write an implementation plan for an engineer with no prior task context.

For a durable plan: confirm scope and acceptance, map current owners/files,

record the TDD route, decompose into executable tasks, define verification and

retirement, self-review, save, then select the execution route. Proceed unless

a real authorization or safety boundary requires the user.

Bind tasks to the requested user outcomes: object, actions, conditions, and

deliverables. Include the final delivery step and evidence at the user-visible

seam, not only implementation/tests. Keep unmet needs and dependencies explicit;

project-wide goals do not authorize work outside this request. Reuse the

existing scope/acceptance slots; no extra goal artifact is required.

This plan is method-pack guidance, not authoritative completion.

TDD Route Guard

Before task decomposition, record TDD Route with mode (off | auto), decision

(strict | light | skipped), authority, test posture, reason, and verification.

Strict RED / GREEN steps belong only to an explicit user/project TDD request or

TDD Route: strict. In off, use skipped unless explicit strict authority

overrides it. An approved plan or a risk label alone is not strict authority.

In auto, select strict for behavior, bugfix, shared/core, contract,

persistence, permission, migration, producer/consumer, or meaningful

regression signals. Select light only when the work is tiny, low-risk,

single-owner, has no behavior change or strict signal, and has an obvious

focused check. Absence of an explicit user TDD request is never evidence for

light; the auto decision itself must be recorded.

If risk remains unknown, return to requirements, debugging, or plan review

before task decomposition; do not infer a TDD route from uncertainty.

Only a strict decision with stated authority may prescribe failing-test,

RED, GREEN, and REFACTOR steps. Otherwise plan the minimum change plus

diagnostic reproduction or post-change regression. A missing auto decision

returns to route selection before implementation tasks.

Entry And Artifact Choice

Announce at start: on the plan-writing route, say that this skill is

creating the implementation plan. On Planless Slice Lane, announce the lane instead and do not claim a plan is being created.

Execution context: Reuse the current branch/workspace by default. A branch

needs independent history; a worktree needs concurrent checkout, blocking

unrelated dirty state, or explicit user/repository authority.

Input: approved requirements, a Spec Brief, or a Design Spec.

Default plan path: docs/aegis/plans/YYYY-MM-DD-<feature-name>.md. Plans do

not go in work/; user and repository authority override the default.

Planless Slice Lane

Use Planless Slice Lane before writing or saving a plan when one of these

entry conditions holds:

request is executing or refining one bounded task from that parent

no-parent branch under # Execute)

and both of these are true:

persistence, security/permission, distribution/release surface, or unclear

verification boundary appears

The lane preserves long-task continuity without turning execution bookkeeping

into durable planning artifacts. A parent scope or acceptance mismatch returns

to the parent plan/spec instead of spawning a micro-plan.

Do not save a new plan. Emit a compact Slice Card:

Slice Card:
- Goal:
- Parent plan/spec:
- Files:
- Boundary:
- Verification:
- Stop:

On the no-parent branch, Parent plan/spec: is none — direct bounded request.

Aegis Project Workspace

Workspace creation is lazy and follows project authority. The Aegis Method

Pack repository must not create or ship a live docs/aegis/ workspace. When a

durable plan must initialize or update another project's workspace, read the

## Workspace Save Detail section of expanded-planning-guidance.md. It owns the

<aegis-workspace-helper> and INDEX.md command detail, not the decision to

create a plan.

Default Plan Surface

Compact output contract: express these as natural plan content, not a stack of

cards: Aegis Visibility, approved scope and plan basis, required baseline

refs, files/owners, compatibility boundary, Change Necessity, TDD route,

tasks, verification, risks, and retirement. Keep conditional structures silent unless their trigger below fires.

Aegis Visibility is normally one sentence explaining which owner, contract,

retirement, compatibility, or verification pressure makes a durable plan

useful. Structured trace belongs only to audit, debug, release, long-task

review, or explicit request.

Before tasks, perform a Requirement Ready Check: identify the approved source,

scope, scenarios, and acceptance evidence. If any decision-changing item is

missing, do not create implementation tasks; return the smallest gap to the

requirement/spec owner.

Perform Change Necessity before any non-trivial source edit or any new source-code path. This is behavior-triggered, not prompt-triggered. State

naturally why no-change/docs/config is insufficient and name the minimum code

boundary. A tiny helper, guard, branch, fallback, adapter, or owner is not

exempt. A no-change, docs/config-only, or needs-clarification result

narrows or stops the code plan.

Run Ripple Signal Triage before tasks when the change touches shared/core or

cross-module behavior; a public API, schema, contract, compatibility,

persistence, cache, export/readback, fallback, adapter, duplicate/legacy owner,

retirement path, or both producer and consumer. If no signal fires, add no

output. If one fires, identify the canonical owner and affected downstream consumers,

state source-of-truth/contract/fallback/retirement risk, and carry expanded verification

into the relevant task. A required owner/public-contract/source-of-truth change,

retaining two owners, or adding a fallback, adapter, or compatibility branch

returns to design or requires explicit prior alignment before implementation.

Run a compact Plan Pressure Test before task decomposition: test owner / contract / retirement fit, higher-level architecture path, verification scope,

and task executability. It may proceed, revise the plan, or return to design;

it is not an approval authority.

Conditional Detailed Guidance

For interface/interaction work, compose ui-ux-governance and carry the accepted

experience criteria and corresponding checks into affected tasks. Include API

changes that alter visible states or recovery; keep backend-only work scoped.

For maintained source, screen file shape, owner fit, add-in-place risk, and a

better boundary. With no pressure signal, a compact edit-in-place decision is

enough. For an ordinary medium/high handoff, state Intent Lock, Scope Fence, Baseline Lock, tests, and drift stop naturally. Load the expanded Execution Readiness View only for the auditable handoff triggers below. Neither form is a

GateDecision, PolicySnapshot, approval gate, or completion authority.

Read only the trigger-matched section of expanded-planning-guidance.md, never

the whole file. This map owns conditional activation, not another planning pass.

Do not load references merely to announce a route or describe a Planless slice.

| Evidence trigger | Exact section and required action |

| --- | --- |

| Specific baseline acknowledgement needs structure, or requirement readiness is incomplete/disputed | ## Baseline And Requirement Detail; retain the task-blocking Requirement Ready Check above |

| A new surface or new owner is proposed | ## New-Surface And Architecture Detail; run Existence Check and docs/current/AEGIS_MINIMALITY_REFERENCE.md before tasks, reusing an existing owner when sufficient |

| Owner/contract, responsibility overlap, higher-level simplification, fallback or retirement remains risky | ## New-Surface And Architecture Detail; use Architecture Integrity Lens and first-principles-review before decomposition |

| Material file-size, mixed-owner, add-in-place, adapter, fallback or shared-core complexity pressure appears | ## Complexity Detail; use Plan-Time Complexity Check and Complexity Budget. An over-budget result must change the boundary, add governance work, or stop for follow-up |

| Long-running, handoff-prone, subagent-driven, high-risk architecture/contract/compatibility/retirement handoff | ## Execution Readiness Detail; expand the existing plan inputs into the auditable readiness view |

| Saving requires workspace initialization or INDEX.md updates | ## Workspace Save Detail |

| Execution-route evidence needs a structured handoff | ## Execution Route Detail |

| An independent high-risk or handoff-heavy review is needed | ## Expanded Plan Review |

The reference supplies detail only. This main file owns routing, plan versus

Planless selection, task blocking, and execution handoff.

If the plan must choose among deleting an old internal path, retaining a proven

external compatibility boundary, or stopping for persistent-state

confirmation, compose anti-entropy-governance. It does not authorize

destructive execution.

Preserve approved ADR signal preservation, source refs, alternatives,

compatibility, and baseline-sync questions for completion; do not create

accepted architecture memory from an unexecuted plan.

Plan And Task Quality

Map files before tasks. Follow existing ownership and naming. For non-trivial

plans, passively use relevant current terms from CONTEXT-MAP.md or CONTEXT.md;

route a real semantic conflict to establishing-project-context.

Every durable plan starts with Goal, Architecture, Tech Stack,

Baseline/Authority Refs, Compatibility Boundary, TDD Route, and Verification.

Then define small, ordered tasks with exact files, purpose, minimum necessary

change, compatibility impact, and commands/outcomes that prove the task.

Include code excerpts only when a signature, contract, or transformation would

otherwise remain ambiguous; do not duplicate the implementation inside the

plan.

For bug fixes, refactors, contract changes, or governance cleanup, keep Repair

Track and Retirement Track explicit in the affected task. A retained old owner

or fallback needs a reason and retirement trigger.

Self-review once for approved-scope coverage, placeholders, owner/type

consistency, minimum change boundary, compatibility, exact verification,

conditional trigger handling, and retirement. Fix defects inline. Tasks are

execution units, not Git history units: the coordinator captures

TaskStartSnapshot and creates one scoped commit only after the whole Task is

reviewed and freshly verified.

Execution Handoff

The agent owns the execution-route decision. Select subagent-driven only for

genuinely independent tasks with bounded ownership when coordination pays for

it; otherwise select inline. Unavailable subagents falls back to inline execution. A dirty workspace alone does not select either route.

Ask the user only for unresolved authorization, privacy, paid-resource,

external-action, irreversible-action, scope, acceptance, or workspace-ownership

boundaries. Otherwise proceed immediately. State the decision, evidence,

fallback, and User confirmation required: no | yes — <boundary> compactly;

load the reference only when the full Execution Route schema is useful.

For subagent-driven, use aegis:subagent-driven-development. For inline,

use aegis:executing-plans.