Plan verification checklist

From oborchers/fractional-cto · View interactive version

Plan verification checklist is an AI agent skill from the GitHub repository oborchers/fractional-cto. This skill should be used by the plan-verifier agent and the /plan-verify command to audit a drafted master plan against a fixed checklist. Covers universal-core completeness, the v0.3.0+ no-tables-for-phases-or-questions rule, trigger-based section-coverage gaps, phase actionability (heading + per-

How to use this skill

Skill file

Plan Verification Checklist

This skill codifies the audit performed by /planning-tools:plan-verify and the plan-verifier agent. It is the single owner of the checklist; the command and agent both reference it rather than duplicating rules.

The checklist applies to any master plan written under the master-plan-methodology skill. Findings are graded Critical, Important, or Suggestion.

Severity guide

Audit dimensions

1. Universal-core completeness

Verify every required section is present and in the prescribed order:

Missing universal-core sections = Critical.

2. Section-coverage gaps (trigger-based)

For each trigger observed in the plan, check the corresponding optional section is present:

| If the plan mentions | Then it must include |

|---|---|

| SQL, schema changes, migrations, new tables/columns | Data Model / Schema AND Rollback Procedure |

| React components, UI changes, new screens/dialogs | Component Architecture, UI States or Skeleton Screens, Manual QA Checklist |

| Novel UI surfaces | Visual Design — ASCII Mockups |

| Multiple locales | i18n table |

| New analytics events or tracking | Analytics section |

| Cost-bearing infrastructure (e.g., cloud spend) | Cost Summary |

| Failure modes, dependencies, external risks | Risks + Mitigations |

| Manual deploy steps or post-merge ops | Deployment Steps |

| Production validation requirements | Verification (post-merge / post-deploy) |

| Production incident remediation | Recovery for Affected Records |

| File-level impact across phases | Code Changes (file × phase) |

| ≥5 design decisions referenced | Design Decisions table |

| Tests required for any phase | Tests breakdown |

| External prerequisites (other tickets) | Prerequisites |

Missing trigger-driven section = Important.

3. Phase actionability (v0.3.0 list shape, v0.3.1 TL;DR, v0.3.2 plain bullets)

Every phase must be one ### Phase <N>: <verb-led name> <emoji> H3 heading followed by a **TL;DR:** callout and a plain unordered bulleted list of scope items. Each phase block must contain:

Phases with vague scope ("update the UI", "improve performance") = Critical. Phases missing exit criteria = Critical. Phases missing any - scope item at all = Critical. Phases missing TL;DR = Important (not Critical).

4. Integer phase numbering (non-negotiable)

Scan every "Phase" reference in the document:

Any violation = Critical.

5. Dependency traceability

The context block's Depends on: line, plus any inline Depends on references, must specify the artifact that creates the dependency, not just the ticket:

Vague dependencies = Important.

6. Citation resolution

Every evidence claim must be traceable:

Unresolvable or vague citations = Important. Fabricated citations (linked source does not exist) = Critical.

7. Callout / evidence convention compliance

Bold-prefix callouts must use the prescribed labels:

Blockquotes (>) are used only for invariants/constraints. The top-of-file context block is not a blockquote (v0.3.3+: plan-level **TL;DR:** + bullets); legacy blockquote context blocks are accepted silently. GitHub-style > [!NOTE] admonitions are not used.

Misused callout labels = Suggestion.

8. Open Questions placement

If Open Questions is at the bottom = Important.

9. No sizing estimates

Sizing present = Important (will be deleted on next revision).

10. One PR per master plan

Scan every phase scope and every section other than Release:

Per-phase git commit and git push to the working branch are allowed — do not flag them.

Per-phase PR creation, merging, or review-request = Critical. The fix is to remove the per-phase PR prose and move it (if needed) into a single Release section at the bottom of the plan.

11. Status conventions

Mixed conventions = Suggestion. Missing heading emoji = Important.

Per-bullet checkbox well-formedness is not audited (v0.3.2+). Plain - bullets are canonical; legacy - [ ]/- [x] shapes pass through silently.

12. No tables for phases / questions (v0.3.0+)

Implementation Phases, Open Questions, and Resolved Questions must use the v0.3.0 list shape — not markdown tables.

Any of these three sections rendered as a markdown table (i.e., a header row with | delimiters) = Critical, pointing the user at planning-tools:master-plan-methodology for the v0.3.0 shape.

Narrow-cell tables elsewhere in the plan (Architecture matrices, Code Changes file × phase, Dependency tables, Cost summaries, etc.) are explicitly allowed and do not trigger this finding. The ban is scoped to wide-cell sections only.

13. Reference naming (v0.3.4+)

Every external reference must carry its human name alongside its ID, so a reader never has to leave the plan to find out what CI-21 is. The rule is owned by planning-tools:plain-language.

The rule applies to the first mention in each block, not once per document — a reader who jumps straight to Phase 5 must still see the name there. Repeating the name across sections is correct, not redundant.

A bare ID = Suggestion. Never Important, never Critical, and it never affects the PASS/FAIL verdict. This is a readability nudge; flagging it harder would create the noise the plugin deliberately avoids.

Not audited: the plain-language writing rules in planning-tools:plain-language. Those govern what commands print into the conversation, not the plan document. Plans stay detailed — do not flag a plan for being thorough.

Report format

The verifier emits findings in this exact shape:

# Verification Report: <plan filename>

> Verified: <date>
> Plan path: <path>

## Critical findings

### <#>: <Short title>
- **Location:** <file>:<line>
- **Rule violated:** <which audit dimension>
- **Quote:** <verbatim excerpt>
- **Fix:** <concrete fix>

## Important findings

### <#>: <Short title>
- **Location:** <file>:<line>
- **Rule:** <dimension>
- **Why:** <impact>
- **Fix:** <concrete fix>

## Suggestions

### <#>: <Short title>
- **Location:** <file>:<line>
- **Note:** <polish improvement>

## Summary

| Severity | Count |
|---|---|
| Critical | <n> |
| Important | <n> |
| Suggestion | <n> |

**Verdict:**
- `PASS` — zero Critical, ≤ 2 Important. Safe to append the Verified marker to the context block — a `- **Verified:** <date>` bullet (v0.3.3+), or a `> **Verified:** <date>` line on a legacy blockquote plan.
- `FAIL` — any Critical or > 2 Important. Plan must be revised.

**Top 3 highest-impact fixes:**
1. …
2. …
3. …

Mandatory Use of AskUserQuestion

The verifier agent does not call AskUserQuestion — it emits the report only. The main conversation (in /planning-tools:plan-verify) presents the report and calls AskUserQuestion to ask the user whether to append the Verified marker to the context block when the verdict is PASS — a - **Verified:** YYYY-MM-DD bullet (v0.3.3+), or a > **Verified:** YYYY-MM-DD line on a legacy blockquote plan.