Release Orchestrator
Overview
Independent opt-in canaries use --channel canary with a numbered
vYYYY.MM.N-canary.N version. The OIDC workflow publishes this version only
to canary, verifies registry convergence and soaks the installed package.
It never continues to latest. Stable promotion is a separate normal release;
use --hooks-v1-promotion on the stable promotion plan; ordinary releases and
hotfixes are exempt. The promotion gate runs before GitHub Release creation.
That plan also makes scripts/mark-hotfix-release.mjs stamp
cleo.releasedFeatures: ["hooks-v1"] into @cleocode/core, which opens the
hooks-v1 runtime gate on the stable build (T13557); stable candidates without it
prove the runtime inert. hooks-v1 was promoted in v2026.10.17 and is released
in source since T13776 (UNRELEASED_HOOK_FEATURES is empty), so later releases
need neither the flag nor the stamp.
cleo release plan refuses a stable plan whose source opens that gate since the
previous tag (hooks-v1 leaving the set, a changed hooksV1Released, a deleted
gate) with E_HOOKS_V1_PROMOTION_REQUIRED, unless it is the promotion or passes
--hooks-v1-waiver "<reason>", which the plan and .cleo/audit/hooks-v1-waiver.jsonl
record (T13555). A release right after the promotion (its committed plan sets
hooksV1Promotion) is exempt, so the post-promotion removal needs no waiver.
The unified-hooks pilot must first supply hosted VidaPeps CI, read-only database
verification and live harness evidence bound to the exact canary source digest.
Source changes require fresh pilot evidence. Do not move npm tags manually.
Owns the canonical 4-verb release pipeline established by SPEC-T9345 and finalised when T9540 deleted the legacy start / verify / publish verbs (and the 12-step releaseShip monolith) plus T10103 deleted the deprecated ship shim. The current verb surface is documented in docs/reference/verb-matrix.md — that file is the SSoT for verb-to-state mapping. This skill is the agent-facing entry point and references the matrix instead of redefining it.
Core Principle
Each verb owns exactly one state transition. No verb performs more than one mutation. Multi-step orchestration uses
ship-e2e-smoke(validator) — never compose the verbs into a custom script. The one sanctioned end-to-end runner isscripts/release-run.mjs(below).
Single release PR (T13825, owner choice 2026-10-16). node scripts/release-run.mjs <ver> --epic <id> --notes-review <file> [--execute] runs plan → independent notes review ({"reviewer","notesSha256","approved":true} by someone other than the operator, for the plan's exact meta.releaseNotes) → release/plan-<ver> (one commit, plan + CHANGELOG.md, on the default branch's HEAD, made through the GitHub API) → cleo release open <ver> --ref release/plan-<ver> → waits for release-prepare and the bump PR's dispatched CI on its exact head → version-only assert against the merge-base → gh pr merge --admin --merge --match-head-commit plus the .cleo/audit/force-bypass.jsonl line → explicit git tag -a on the merge commit and push. The bump PR carries the plan and the bump. Dry-run by default; every step resumes on re-run. --ref alone dispatches on any plan branch; preflight skips carry over only when it adds release-plan files alone.
One-command release (default, T14102)
Required checks may declare event: pull_request or event: push in release.prRequiredWorkflows (T14602). Release selection judges the push entries and unscoped entries only; PR-only aggregates do not gate a main push. For ci:<pr>, both explicit event lists must succeed; a cancelled merge needs a qualifying descendant under T12742 or the applicable current-HEAD rule. See the evidence section of CLEO-REFERENCE.md for configuration and preserved guards.
cleo release cut v2026.10.28 --lead lead.md # report: commit, notes, packages, migrations, task status, confirm command
cleo release cut v2026.10.28 --sha <sha> --lead lead.md --yes # the printed confirm command: tags that commit
Confirmation (D11212). Nothing is tagged without --yes; without it the cut reports and prints the exact confirm command, pinned to the previewed sha. With --yes, an active standing release authorization covering the version, or the release.agentCut setting, allows the tag (an agent); otherwise the cut asks on the controlling terminal (/dev/tty) and tags only when the version is typed exactly, refusing with E_RELEASE_NOT_AUTHORIZED (and naming the scope to grant) when there is no terminal. The typed confirmation stops casual misuse only: a caller that drives a pseudo-terminal can still type the version. The audit row records allowedBy (tty-confirm, authorization:<id> or setting:release.agentCut=<level>@<scope>).
Previous tag (T14173). The notes, the CHANGELOG section (write-changelog) and release reconcile start from the newest reachable lower tag whose GitHub Release published; a tag whose release.yml run failed before creating its release (a failed canary) is skipped, so its changesets and tasks land in the next release. A stable cut also skips every prerelease tag. When gh cannot read a release (auth, network), cut and write-changelog refuse rather than guess; reconcile keeps the tag.
Release in flight (T14184). The cut lists release.yml runs not yet completed for a lower release tag (inFlight, plus a warning in the dry run). Until such a run creates its GitHub Release, the previous-tag pick skips that tag, so a real cut refuses with E_RELEASE_IN_FLIGHT naming each run; wait for them, or pass --allow-in-flight to cut now and repeat their entries in these notes.
Agent cut setting (T14170, D11221). release.agentCut is off (default), canary, prerelease or stable; an agent sets it with cleo config set release.agentCut canary --scope global, with no terminal or owner password. Each level covers its own scope and every narrower one: canary covers -canary.N, prerelease any prerelease, stable everything. A project value (even off) shadows the global one. A cut it allows reports allowedBy, a warning naming the setting, and an audit row with scope and settingSource; when it does not cover the version and there is no terminal, the refusal names the exact cleo config set command.
Standing authorization (T14141, D11215). The owner grants it at a terminal with the owner-auth password: cleo release authorize --scope canary|prerelease|stable|<version> --expires 7d --reason "<why>" [--uses <n>] (at most 30d; no use limit unless --uses). It is signed with the enrolled owner key (cleo config owner-enroll), stored in .cleo/release-authorizations.json and the global store, recorded as an owner decision, and audited in .cleo/audit/release-authorizations.jsonl. cleo release authorize --list shows each grant's state; --revoke <id> (owner password too) ends one now with a signed revocation, and the revocation count is sealed in .cleo/owner-settings.json (commit it). An edited, unsigned or one-sided grant is ignored; an edited, unsigned or shortened revocation list makes every grant tampered (fail closed). cleo doctor reports both. A cut it allows carries Authorized-by: <id> in the tag message.
- Commit: the newest first-parent commit of
origin/mainwhoseCIcheck run concludedsuccess;--shapins one, which must itself be green. Nothing reruns the test suites: CI already passed that tree. - Notes: the changesets added since the previous release tag, led by
--lead(stored as the tag annotation). A changeset no merged PR brought in is refused (E_RELEASE_UNMERGED_CHANGESET); no green commit isE_RELEASE_NO_GREEN_COMMIT. - Docs rot (T14111): the dry run shows
cleo docs rotfindings; a real stable cut refuses withE_DOCS_ROTbefore tagging while any stale, duplicate or orphaned doc remains; on a prerelease (canary) it is a warning only. - Real-store smoke (T14250): before a stable cut, check out the commit to cut and run
node scripts/release-mac-smoke.mjs --record <releaseEpicId>(add--project <dir>once per extra project; each durability phase smokes this project and one other). It builds that commit and runs the built CLI on read-only copies of each real store in a sandboxed HOME: reads, a cancel cascade,done --planon an epic with settled children, a docs fetch, an admission report and a session end, with the copy's test commands replaced so nothing starts a suite.results.json(commands, stores, CLI version, result) goes to.cleo/release-smoke/<sha12>/and is attached to the epic. A real stable cut reads that receipt and refuses withE_RELEASE_SMOKE_MISSINGwhen it is missing, failed, or names another commit (the dry run shows it assmoke; a prerelease only warns). The fallbackcleo release openapplies the same gate to a stable version, against the dispatch branch head: fix forward and smoke the new commit. - Provenance: the merge sweep reconciles the newest stable tag automatically once its GitHub release exists (ADR-099); there is no manual reconcile step.
- Cleanup (T14142): the report shows the plan for the release tasks' worktrees and
task/*branches, plus nested repository copies proven redundant (clean, every ref on origin) only inside the worktrees of the release's done or cancelled tasks; a confirmed cut applies it after the tag. A cleanup failure never fails the cut, and changesets naming no task skip it. - Which checkout (T14160):
cutruns every git and gh call, the docs-rot scan andcheckoutAtMainin the checkout it is started from (a CLEO worktree, or the project root); it never runs git in another checkout. From a worktree the merge sweep and the cleanup, which work on the project checkout, are skipped and named in the report. - Task status is reported, never gated. Green CI on the sha is the gate; a pending task does not block the cut.
- Tag: an annotated
v<ver>made through the GitHub API with yourghtoken, which startsrelease.yml. It runscleo release write-changelog, publishes, and on a stable release opensrelease/v<ver>, a CHANGELOG + version PR that auto-merges on green and never blocks the release.
Gates (all re-checked): the version is CalVer for this month, above every release tag and main's package.json; the commit is first-parent on origin/main with every release.prRequiredWorkflows check (app-pinned, push run) green; the local checkout is at origin/main; CI is judged again right before the tag; every real cut writes a row to .cleo/audit/release-cut.jsonl. release.yml runs cleo release verify-tag before publishing, so a hand-pushed or dispatched tag on an untested tree never ships.
Rollback. A bad tag before release.yml publishes: cancel the run (gh run cancel <id>) and delete the tag (git push origin :refs/tags/v<ver>), then cut again. After publish, fix forward with the next version. If changelog-pr fails after a publish, re-run that job, or open the PR by hand from main: cleo release write-changelog <ver> --ref v<ver> plus node scripts/version-all.mjs --set <ver>.
The plan/open pipeline below stays for one release as a fallback; T14114 deletes it.
Canonical Pipeline
| Step | Verb / Workflow | Owns transition | Notes |
|-----:|------------------|------------------|-------|
| 1 | cleo release plan <ver> --epic <id> | _(none)_ → planned | Builds the Release Plan envelope; auto-writes CHANGELOG.md (T10105 closes the silent-skip gap). stdout is the one envelope, and the readiness report goes to stderr (T13322). A --tasks plan records epicId: null, and each task keeps its own epicAncestor (T13323) |
| 2 | cleo release open <ver> | planned → pr-opened | Dispatches release-prepare.yml with the plan's sha256 once the plan is verified on the default branch, plus the verified preflight skips; the workflow cuts the branch + opens the PR |
| 3 | _(GHA)_ release-prepare.yml → PR merge | pr-opened → pr-merged | Owned by CI; verify via cleo release pr-status <ver> |
| 4 | git tag -a v<ver> -m "Release v<ver>" && git push origin v<ver> | pr-merged → tag-pushed | Explicit tag after the release PR merges — auto-tag-on-release-merge.yml is retired (T10434, ADR-087); the tag push triggers release.yml |
| 5 | cleo release reconcile <ver> | tag-pushed → published | Backfills 11 provenance tables; idempotent |
| 6 | _(GHA)_ release.yml Publish: release candidate gate | <ver>-rc.ci.<n> on canary → <ver> on latest | Automatic, OIDC only, no token (T13181). The candidate must install from npm and pass the sandbox soak (scripts/release-canary-soak.mjs) before the release publishes to latest; a failed gate leaves users on the previous release, and a re-run of the failed job continues. No dist-tag is ever moved by hand: a bad release is fixed forward with the next patch. Runbook: docs/guide/merge-runbook.md, "Release candidate gate" |
Optional validators (read-only / dry-run):
| Verb | Use |
|------|-----|
| cleo release ship-e2e-smoke <ver> --epic <id> | One-shot end-to-end smoke. Dry-run by default; --execute performs real mutations. T10103. |
| cleo release pr-status <ver> | Poll release PR CI checks while waiting |
| cleo release list / show <ver> | Read-only inspection |
Immutable Constraints
| ID | Rule | Enforcement |
|----|------|-------------|
| RLSE-001 | Version MUST be CalVer (YYYY.MM.patch) per ADR-065 — never SemVer. | cleo release plan rejects non-CalVer; exit 53. |
| RLSE-002 | CHANGELOG.md MUST be updated before the tag — always-write is the default behaviour of cleo release plan (T9784 deleted the manual changelog verb). | Plan envelope refuses to advance to pr-opened if the changeset directory is unparseable (T10105). |
| RLSE-003 | All per-task evidence gates MUST be recorded via cleo verify <task> --gate <g> --evidence … BEFORE cleo complete. The legacy cleo release verify batch verb was deleted in T9540. | ADR-051 per-task evidence ritual. | <!-- cleo-cmd: negative-example: release verify -->
| RLSE-004 | The release MUST be tagged explicitly: by cleo release cut (API tag on the green sha), or on the fallback path with git tag -a v<ver> + git push origin v<ver> after the release PR merges. | Auto-tag was retired in T10434 / ADR-087: GITHUB_TOKEN tag pushes did not reliably trigger release.yml. |
| RLSE-005 | Direct pushes to main are prohibited. A cut release reaches main's CHANGELOG and versions through release.yml's auto-merging release/v<ver> PR; the fallback path through the PR release-prepare.yml cuts. | ADR-065 + branch protection (see docs/guide/branch-protection-setup.md). |
| RLSE-006 | Version MUST be consistent across all workspace targets resolved by resolveVersionBumpTargets (root package.json + every workspace package + Cargo workspace). | Version-bump preflight in release-prepare.yml. |
| RLSE-007 | Provenance reconcile runs automatically: the merge sweep calls reconcileLatestRelease once the GitHub release exists (ADR-099). Run cleo release reconcile <ver> only to recover. | T14101 merge sweep. |
Integration
Use the explicit verbs. Do not invoke cleo release ship — it was deleted in T10103. <!-- cleo-cmd: negative-example: release ship -->
# 1. Plan — build the canonical Release Plan envelope.
cleo release plan v2026.6.0 --epic T10099
# 2. Open — dispatch release-prepare workflow. When the plan reached main
# through a release-plan PR (branch protection), open it with
# --no-commit-plan: the plan on main is verified (read from there if this
# checkout lacks it) and dispatched by its sha256 (T13050).
cleo release open v2026.6.0 --no-commit-plan
# 3. (Optional) Poll PR + CI status while the workflow runs.
cleo release pr-status v2026.6.0
# 4. Before the tag, prove macOS on the owner's Mac (T14104): release-prepare
# runs no macOS shards. Check out the exact commit to tag, then:
node scripts/release-mac-smoke.mjs
# Builds it, snapshots the real stores into a sandbox (outside the backup
# rotation), runs the built CLI in a sandboxed HOME and writes evidence +
# SHA256SUMS to .cleo/release-smoke/<sha>/. Exit 0 = every step passed;
# non-zero blocks the tag. A stable `open` (step 2) also refuses without a
# passing receipt for the dispatch branch head, so for a stable version
# smoke that head before step 2 as well (T14250).
# 5. After the release PR merges, tag explicitly (auto-tag is retired).
git tag -a v2026.6.0 -m "Release v2026.6.0"
git push origin v2026.6.0
# 6. Reconcile. Every full merge sweep reconciles the newest stable tag on
# origin/main once its GitHub Release exists. Run it by hand for a
# prerelease, an older stable tag, a failed sweep attempt, or right away.
cleo release reconcile v2026.6.0
To validate the whole pipeline end-to-end without shipping a real release:
# Dry-run preview — no side effects.
cleo release ship-e2e-smoke v2026.6.0 --epic T10099
# Execute mode — runs plan + open, then polls for PR merge, tag push,
# and npm publish (default 30-min wall-clock budget).
cleo release ship-e2e-smoke v2026.6.0 --epic T10099 --execute
Exit codes (canonical):
0— success.53— version validation failed (e.g. not CalVer).54— release-prepare workflow gate failed.56— tag creation failed.82—E_PLAN_NOT_FOUND(plan envelope missing for the requested version).88— artifact publish failed.
Anti-Patterns
| Pattern | Problem | Solution |
|---------|---------|----------|
| Running cleo release ship | The verb was deleted in T10103 — the command will exit with Unknown command. | Use cleo release plan + cleo release open. | <!-- cleo-cmd: negative-example: release ship -->
| Manually invoking gh workflow run release-prepare.yml | Bypasses the plan envelope; releases.status stays at planned; a hand dispatch also drops the verified skip-tests / verified-sha inputs, so the whole Linux and macOS suites run again (v2026.10.3 lost ~45 min). | Always go through cleo release open <ver> (--no-commit-plan after a plan PR) — it tracks state in the releases table and forwards the preflight skips. |
| Tagging before the release PR merges, or git push --tags | Tags an unmerged commit, or pushes every local tag. | Tag the merged release commit and push that one tag: git push origin v<ver>. |
| Hand-editing CHANGELOG.md for the new version | Drift between the changeset directory and the changelog. | cleo release plan always auto-writes the section (T10105). Use cleo changeset add to author entries. |
| Pasting one verb into another's workflow file | Multi-step orchestration belongs in ship-e2e-smoke. | Use cleo release ship-e2e-smoke … --execute for end-to-end validation. |
| Running the pipeline on a dirty worktree | Release commit scoops up unrelated changes. | The clean-tree gate refuses to advance. |
| Skipping cleo release reconcile after a successful tag push | 11 provenance tables stay empty; canon drift. | The merge sweep reconciles only the newest stable tag (after its GitHub Release exists); reconcile prereleases, older tags and failed attempts by hand. Verify with cleo release show <ver>. |
Critical Rules Summary
- The 4-verb pipeline —
plan,open,reconcile,rollback— is the ONLY way to ship. - The deprecated
cleo release shipshim was DELETED in T10103. Do not invoke it. <!-- cleo-cmd: negative-example: release ship --> - CalVer (
YYYY.MM.patch) is the only valid version scheme. cleo release planalways writes the CHANGELOG section unless--no-changelog.- The tag is created explicitly after the release PR merges;
auto-tag-on-release-merge.ymlis retired (T10434, ADR-087). - Provenance reconcile: every full merge sweep reconciles the newest stable tag merged into
origin/mainonce its GitHub Release exists (reconcileLatestRelease). Runcleo release reconcile <ver>by hand for a prerelease, an older stable tag, after a failed sweep attempt, or to record it now. The shippedrelease-publish.ymlconsumer template also runs it. - Per-task evidence gates use
cleo verify --gate --evidenceper ADR-051 — not the deleted batch verb. - Use
cleo release ship-e2e-smoketo validate the full pipeline before a real ship. - A stable release reaches
latestonly through release.yml's release candidate gate (T13181). If the gate fails, the release is not shipped to users: re-run the failed Publish job or fix forward; never movelatestby hand (there is no npm token).
CI Job Inventory
There is no maintained job inventory doc: the hand-kept job-inventory.md went stale and was retired in the T14108 docs census. Read the jobs and their triggers from .github/workflows/ci.yml and the release workflows themselves, and branch protection from gh api repos/:owner/:repo/branches/main/protection (see docs/guide/branch-protection-setup.md). The workflow classes and trigger policy are in docs/spec/consumer-workflow-hook-contract.md.
See also / References
This skill binds to the release LOOM lifecycle stage. Governing ADRs:
- ADR-053 — project-agnostic release pipeline — language-agnostic version bump → changelog → tag flow.
- ADR-063 — release pipeline — original 12-step pipeline (historical; superseded by SPEC-T9345 §4).
- ADR-065 — PR-required release flow — direct pushes to
mainare prohibited.
Live verb matrix: docs/reference/verb-matrix.md — the single source of truth for verb-to-state mapping.
LOOM coverage matrix: docs/reference/loom-coverage-matrix.md.