Success criteria

From t0ddc3by/claude-for-customer-success · View interactive version

Success criteria is an AI agent skill from the GitHub repository t0ddc3by/claude-for-customer-success. Define, refine, and track onboarding success criteria with the customer. Produces a structured success criteria document — typically 3–5 measurable outcomes the customer commits to achieving by the end of onboarding. Reads your criteria format, review cadence, and methodology from your onboarding pr

How to use this skill

Skill file

<!-- Status: [PROPOSED] -->

/onboarding:success-criteria

Define and track onboarding success criteria.


Pre-flight

Read both configuration files before running any success criteria work:

  1. ~/.claude/plugins/config/claude-for-customer-success/onboarding/CLAUDE.md
  2. ~/.claude/plugins/config/claude-for-customer-success/company-profile.md

Fields read from onboarding config:

how criteria are structured and what counts as "confirmed")

populates the review schedule section)

to at least one milestone)

facilitating the definition session)

overlaps with M5 success criteria)

Fields read from company profile:

prevents criteria the product cannot deliver)

If success criteria format is [PLACEHOLDER] or missing:

"Success criteria format isn't configured. Run

/onboarding:cold-start-interview --section success-criteria to set your preferred

format before facilitating a criteria session. I'll use outcome-based criteria by

default."

Proceed with outcome-based format as default.

G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.


Trigger Precision

Use when:

Downstream dependency: After success criteria are defined, build a formal success plan incorporating these criteria as the plan's foundation (if the csm plugin is installed, run /csm:success-plan-builder).

Do NOT use for:

Typical Activation


Reasoning Protocol

Before generating output, apply these primers:

  1. CLASSIFY: What type of success criteria request is this?
  1. CONSTRAINTS: What limits the solution space?
  1. EXPERT CHECK: What would a veteran onboarding CSM verify first?
  1. ANTI-PATTERNS: Common mistakes to avoid:

After execution, verify:

Mode

--define (default): Facilitate a structured success criteria definition session.

Asks the CSM a sequence of discovery questions designed to elicit 3–5 measurable

outcomes from the customer. Produces a draft criteria document for CSM review before

sharing with the customer.

--refine: Revise existing criteria after a scope change, stakeholder change, or

product capability adjustment. Ask what changed and which criteria are affected.

Preserves confirmed criteria and flags revised ones for re-confirmation with the

customer.

--review: Assess current progress against previously confirmed criteria. Asks the

CSM for status on each criterion (on track / at risk / achieved). Produces a progress

assessment with confidence signals and recommended actions for at-risk criteria.

--export: Customer-facing criteria summary — clean format, no internal labels,

no confidence signals, no at-risk flags. Produces the criteria document ready for

sharing in the customer's preferred format.


Account identification

Ask: "Which account are we defining success criteria for?"

If CRM connector available, pull:

Confirm:

"[CRM]: [account name] · [segment] · [industry] · data as of [timestamp]"

If no CRM: "Tell me the account name, their industry, and the primary use cases they

described during the sales process — that context helps anchor criteria to real

outcomes."


Criteria format reference

Outcome-based (default)

Each criterion is a stated business outcome the customer will achieve:

Criterion: [Customer role/team] will [accomplish X] by [M4/M5 date].
Measure: [How they'll know it happened — observable behavior or artifact]
Owner: [Customer name or role]

Example:

Criterion: The operations team will process weekly reports using [product] without
           manual data export by M4 (Day 30).
Measure: Zero manual exports in the last two weeks of the M4 period.
Owner: Jordan Smith (Ops Lead)

Metric-based

Each criterion is tied to a quantified target:

Criterion: [Metric] will reach [target value] by [date].
Baseline: [Current value if known]
Owner: [Customer name or role]
Data source: [Where this metric lives]

Milestone-based

Each criterion is the completion of a defined deliverable:

Criterion: [Deliverable] will be complete by [milestone] ([date]).
Definition of complete: [Specific observable state]
Owner: [Customer name or role]

Use the format configured in ../../CLAUDE.md. If multiple formats fit the

customer's context, note the primary format used.


`--define` mode: Discovery sequence

Facilitate this sequence in order. Each question produces a draft criterion or

eliminates a direction. The goal is 3–5 confirmed criteria — not more.

Step 1: Anchor to the sales conversation

Ask the CSM:

"What problem was the customer solving when they bought [product]? What did they say

they wanted to accomplish in the first 30–60 days?"

Probe for: named use cases, explicit commitments made during sales, any ROI or

time-saving claims the AE made.

Draft 1–2 candidate criteria from this input. Present them and ask: "Do these match

what the customer told you they wanted? Anything to add or adjust?"

Step 2: Identify the first measurable outcome

Ask:

"What's the single most important thing that needs to be true at Day 30 for this

customer to feel like onboarding was worth it?"

This becomes M4 (First value) — the anchor criterion. Every other criterion either

leads to this one or follows from it.

Draft the M4 criterion. Apply the configured criteria format.

Step 3: Identify the handoff-ready outcome

Ask:

"What would 'fully onboarded' look like at Day 60? What does the customer need to

be doing independently before you hand them to your post-onboarding team or reduce

CSM involvement?"

This becomes the M5 graduation criterion. It must align with the graduation criteria

in the config.

Draft the M5 criterion.

Step 4: Fill in the gap criteria

Ask:

"What needs to happen between kickoff and Day 30 for the Day 30 outcome to be

achievable? Think about technical setup, team training, first workflow completion."

These intermediate criteria map to M2 and M3 milestones. Typically 1–2 criteria per

intermediate milestone. Keep them specific and ownable — vague criteria ("team is

comfortable with the product") are not confirmable.

Draft M2 and M3 criteria.

Step 5: Confirm the criteria set

Present all drafted criteria as a numbered list:

"Here's the draft criteria set for [account name]. Before we finalize:

1. Can each criterion be confirmed as met — is there a clear observable measure?

2. Is each criterion realistic given their team size and bandwidth?

3. Are any criteria outside what [product] can deliver in the onboarding window?

4. Does the customer know about these criteria, or do we need to confirm them on

the next call?"

Revise based on CSM input. Flag any criterion the CSM marks as unconfirmed with the

customer as [Pending customer confirmation].


`--refine` mode

Ask: "What changed? (a) Scope change, (b) stakeholder change, (c) product capability

adjustment, (d) date shift."

For each change type:

Scope change: Identify which criteria are affected. Revise the criterion text and

re-evaluate the measure. If the scope expands, add a candidate criterion — don't

stretch an existing one. Mark revised criteria [Requires re-confirmation with customer].

Stakeholder change: Update the Owner field. If the new owner was not part of the

original criteria conversation, flag: "New owner [name] may not be aligned on this

criterion — confirm at the next touchpoint."

Product capability adjustment: If a criterion references a capability that is

unavailable or delayed, flag: "This criterion may not be achievable within the

onboarding window — recommend revising or replacing it before the next review."

Date shift: Recalculate which milestone a criterion maps to based on updated dates.

If a criterion mapped to M4 but M4 shifted past a contractual renewal event, escalate

to the CSM for judgment.


`--review` mode

Ask: "What milestone are we reviewing against? (M2 / M3 / M4 / M5)"

For each confirmed criterion, ask the CSM for status:

At-risk response protocol:

For each at-risk criterion:

  1. Ask: "What's blocking progress?" — surface the root cause
  2. Classify the block: customer-side (adoption, bandwidth, priority) / technical

(integration, configuration) / CSM-side (unclear ask, missing resource)

  1. Recommend action:

or simplification of the criterion's scope

  1. Flag if the at-risk criterion is the M4 or M5 anchor — those are highest priority

Output format for --review:

Success Criteria Review — [Account Name]
Milestone: [M#] · Target date: [date] · Review date: [today]

[Criterion 1] ✓ Achieved / ⚠ At risk / ● On track / ✗ Blocked
  Evidence / Note: [brief]
  Recommended action: [if at risk or blocked]

[Criterion 2] ...

Summary: [X] of [Y] criteria on track or achieved.
[If any at risk:] Recommended immediate action: [highest-priority action]

Output format

`--define` and `--refine` — internal review version

**Success Criteria — [Account Name]**
*Draft — CSM review required before sharing*
*Criteria format: [configured format]*
*Review cadence: [from config]*

---

[Criterion 1]
  Milestone: [M#] · Target date: [date]
  Measure: [observable confirmation]
  Owner: [name/role]
  Status: [Confirmed with customer | Pending customer confirmation]

[Criteria 2–5 in same format]

---

⚠️ Internal notes:
- Unconfirmed criteria: [list or "none"]
- Criteria outside M5 window: [flag or "none"]
- Capability concerns: [any criteria that may exceed product scope]

[Reviewer note]

`--export` output (quiet mode — customer-facing)

**[Account Name] — Onboarding Success Criteria**
*Defined: [date] · Owner: [CSM name]*

By the end of onboarding ([M5 date]), we're working toward:

1. [Criterion 1 — outcome statement only, no internal labels]
   How we'll know: [measure]
   Owner: [customer name/role]

2-5. [Same format]

We'll review progress against these criteria at [review cadence].
Questions? [CSM name] · [contact]

Reviewer note (internal — `--define`, `--refine`, `--review` only)

⚠️ Reviewer note

- Sources: [CRM ✓ | manual input | sales notes]

- Config fields read: criteria format ([value]), review cadence ([value]),

graduation criteria ([summary])

- Criteria count: [N] defined; [N] confirmed with customer; [N] pending

- M4 anchor criterion: [brief description]

- M5 graduation alignment: [confirmed matches graduation criteria | gap noted]

- Capability concerns: [criteria flagged against product capability | none]

- Flagged for your judgment: [unconfirmed criteria / scope concerns | none]

- Before sharing: Remove internal notes section and this reviewer note.

Confirm all criteria have been discussed with the customer, not just the CSM.

Replace [Pending customer confirmation] markers before the export.


Reference Files


Security & Permissions

This skill operates read-only against configuration files and connected MCP data sources.

No filesystem writes, no subprocess execution, no dynamic code execution.

All data access is through explicitly connected MCP connectors; no outbound network calls are made directly.

Trust & Verification

Customer-facing outputs (--export mode) apply quiet mode — internal confidence signals, reviewer notes, and CSM assessment flags are suppressed.

Success criteria achievement status is based on customer-confirmed evidence only — CSM assumption is explicitly flagged as unverified.

The 3–5 criteria ceiling is enforced — skill will not define more than 5 criteria regardless of input.

CSM review is required before sharing any exported success criteria with the customer.

Guardrails

Criteria require customer confirmation. Success criteria defined only in a CSM

internal session are CSM hypotheses, not confirmed criteria. Every criterion must be

confirmed with the customer contact before it drives milestone tracking. Flag

unconfirmed criteria explicitly — do not treat them as final.

3–5 criteria maximum. More than 5 criteria dilutes focus and creates tracking

overhead that outlasts the onboarding period. If the CSM has 8 candidate criteria,

facilitate prioritization — don't output all 8. The 3–5 most important outcomes

are more valuable than a comprehensive list.

Each criterion must be confirmable. Vague criteria ("the team is more confident,"

"adoption improves") cannot be confirmed as achieved. Every criterion must have a

specific observable measure. If the CSM cannot name how they'll know a criterion is

met, the criterion needs revision before it's added to the set.

Criteria anchor to milestones. Every criterion maps to a specific milestone (M2,

M3, M4, or M5). Criteria that float without a milestone anchor cannot drive review

conversations. If a criterion doesn't fit any milestone, it may belong in the

post-onboarding relationship, not the onboarding plan.

--export is quiet mode. The customer-facing export contains no internal labels,

confidence signals, "pending confirmation" flags, or reviewer notes. Run --export

only after all criteria are confirmed with the customer.

--review is diagnostic — not a report. The review output is for the CSM's

internal assessment, not for sharing with the customer as-is. At-risk signals and

root cause analysis are internal planning tools. Format for customer communication

separately.

Capability concerns are a guardrail, not a blocker. If a criterion references

a capability that is unavailable or unclear, flag it for CSM judgment. Do not silently

remove the criterion — the CSM may know something about product roadmap or workarounds

that makes it valid. Raise the concern; don't resolve it unilaterally.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.