Onboarding plan

From t0ddc3by/claude-for-customer-success · View interactive version

Onboarding plan is an AI agent skill from the GitHub repository t0ddc3by/claude-for-customer-success. Generate, update, or summarize the customer-facing onboarding plan document. The plan is the primary shared artifact between the CSM and the customer team — it defines the milestone timeline, ownership at each stage, first priorities, communication cadence, and success criteria placeholder. Reads on

How to use this skill

Skill file

<!-- Status: [PROPOSED] -->

/onboarding:onboarding-plan

Onboarding plan document — generate, update, or summarize.


Pre-flight

Read both configuration files before building any plan:

  1. ~/.claude/plugins/config/claude-for-customer-success/onboarding/CLAUDE.md
  2. ~/.claude/plugins/config/claude-for-customer-success/company-profile.md

Fields read from onboarding config:

partner-led — shapes ownership columns and section structure)

header note for where the plan lives)

as customer commitments)

Fields read from company profile:

section)

If either config file is missing or milestone framework fields contain [PLACEHOLDER]:

"Milestone targets and onboarding model aren't configured. Run

/onboarding:cold-start-interview --section milestones to set these before

generating an onboarding plan — the output will use generic timelines without your

actual targets."

Proceed with a general structure if the user confirms they want to continue despite

missing config.

G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.


Trigger Precision

Use when:

Do NOT use for:

Typical Activation


Reasoning Protocol

Before generating output, apply these primers:

  1. CLASSIFY: What type of onboarding plan request is this?
  1. CONSTRAINTS: What limits the solution space?
  1. EXPERT CHECK: What would a veteran onboarding CSM verify first?
  1. ANTI-PATTERNS: Common mistakes to avoid:

After execution, verify:

Mode

--draft (default): Generate a complete onboarding plan from kickoff inputs. Use

immediately after the kickoff call when the CSM has the contract start date, stakeholder

names, and first priorities. Produces the full plan document ready to share with the

customer after CSM review.

--update: Revise an existing plan after a milestone is completed, a scope change

occurs, or a key date shifts. Ask the CSM which milestone was completed or what changed.

Regenerate affected sections (milestone table, next priorities, cadence) while preserving

confirmed historical entries. Append a change log entry at the bottom of the plan.

--summary: Abbreviated current-state view — current milestone status, what's done,

what's next, and the next milestone target date. Formatted for pasting into a Slack

message, email, or async stakeholder update. Suppresses the full milestone table and

historical context. Quiet mode (no internal labels, no reviewer note).


Account identification and data pull

Ask: "Which account is this plan for? I need the account name and contract start date

to calculate milestone dates."

If a CRM connector is available, pull:

Confirm the pull:

"[CRM]: [account name] · [segment] · contract start [date] · CSM: [name]

· AE: [name] · data as of [timestamp]"

If no CRM connector is available:

"No CRM connector configured. Provide the account name, segment, contract start date,

and stakeholder names — I'll build the plan from what you give me."


Milestone date calculation

All milestone dates are calculated from the contract start date using day targets from

the onboarding config.

Standard milestone framework (from config; these are defaults — config values override):

| Milestone | Label | Day Target | Completion Criteria |

|-----------|-------|------------|---------------------|

| M1 | Kickoff complete | Day 5 | Kickoff call held; plan shared; first priorities confirmed |

| M2 | Technical setup | Day 14 | Required integrations active; users provisioned |

| M3 | First use | Day 21 | Product used for at least one real workflow |

| M4 | First value | Day 30 | Measurable outcome against at least one success criterion |

| M5 | Handoff ready | Day 60 | All success criteria met or tracked; CSM graduation checklist complete |

Calculate each milestone date as: contract start date + milestone day target.

If a milestone date falls on a weekend, note it:

"M2 falls on [day] — suggest confirming with the customer whether [adjusted date]

works better."

TtV note: TtV targets from config are internal planning benchmarks. Every reference

to TtV in the output is labeled [review — internal planning target] and appears only

in the internal version of the plan. The customer-facing plan shows milestone dates

and completion criteria — not TtV labels.


Plan builder

Section 1 — Header (customer-facing)

[Company Brand Name] × [Account Name]
Onboarding Plan

Contract start:     [date]
Plan owner:         [CSM name]
Last updated:       [today's date]
Plan lives in:      [customer-facing plan format from config]

Section 2 — Your onboarding timeline

Milestone table — customer-facing format:

| Milestone | Target date | What it means | Status |

|-----------|-------------|---------------|--------|

| M1: Kickoff complete | [date] | Kickoff call held; onboarding plan shared | Scheduled |

| M2: Technical setup | [date] | [completion criteria from config] | Upcoming |

| M3: First use | [date] | [completion criteria from config] | Upcoming |

| M4: First value | [date] | [completion criteria from config] | Upcoming |

| M5: Handoff ready | [date] | [completion criteria from config] | Upcoming |

Status values: Upcoming / In progress / Complete / At risk — updated on --update calls.

Section 3 — What happens at each stage

Brief prose description of each milestone phase — what the CSM does, what the customer

team does, and what signals completion.

Keep this section brief (2–3 sentences per milestone). The goal is a shared mental model,

not a process document. For white-glove and implementation-plus-handoff models, this

section is slightly longer — see model adaptations below.

Section 4 — First priorities

"Here's what we need to accomplish before [M2 date]:"

Populate from kickoff notes or ask: "What are the 2–3 things that must happen before

the next milestone? Who owns each?"

Present as a named list with owner and due date:

Section 5 — How we'll work together

Communication cadence from config:

"We'll connect [weekly / biweekly / async] via [format]. You can always reach

[CSM name] at [contact] between sessions."

Add preferred communication channel (Slack / email / Teams) if known from CRM notes

or kickoff.

Section 6 — Success criteria

This section is a placeholder on the first --draft output:

Success criteria will be defined together during our first working session.

We'll document what "successful onboarding" looks like for [account name] —

typically 3–5 measurable outcomes you want to achieve by [M5 date].

If the /onboarding:success-criteria skill has already been run for this account, replace the

placeholder with the confirmed criteria list. Ask: "Have you already run the

/onboarding:success-criteria skill for this account? If so, paste or describe the agreed criteria

and I'll populate this section."

Section 7 — Internal section (suppressed in customer-facing output)

Visible only in --draft internal version:

TtV context [review — internal planning target]:

At-risk signals to watch (from config):

Escalation path: [escalation contact from config]


Model adaptations

white-glove:

and customer-owned actions as separate bullet lists

how often they receive updates, and in what format

customer champion for each milestone

guided-self-serve:

support" rather than leading

training portal, support channel

independently before the next CSM touchpoint

implementation-plus-handoff:

implementation engineer lead) and Adoption phase (M3–M5, CSM lead)

phase" milestones with separate prose blocks

items

partner-led:

reaches for which type of issue (partner for day-to-day; CSM for escalation;

company support for technical)

escalation trigger that routes to the CSM directly


`--update` mode

Ask: "What changed? Options: (a) milestone completed, (b) date shift, (c) scope change,

(d) stakeholder change."

For each change type:

Milestone completed:

completion date

[date] — [CSM name]: M[X] marked complete. Actual date: [date]. Next: M[X+1] target [date].

Date shift:

Scope change:

skill: "This change may affect your agreed success criteria — run

/onboarding:success-criteria --update to confirm."

Stakeholder change:


Output format

`--draft` output (CSM review version)

[Plan header — customer-facing content]

[Sections 1–6 — customer-facing content]

---

⚠️ Internal — do not share with customer

[Section 7 — TtV context, at-risk signals, escalation path]

[Reviewer note]

Customer-facing export (--draft with quiet flag or after CSM review)

[Plan header]

[Sections 1–6 only]

No internal labels, no reviewer notes, no TtV references, no at-risk signals.

`--update` output

[Updated plan — full document with revised sections]

[Change log — appended at bottom]

[Reviewer note — internal only]

`--summary` output (quiet mode)

**[Account Name] — Onboarding Status**
*As of [date]*

**Current milestone:** [M# — label] — [Complete / In progress / At risk]
**Completed:** [list of complete milestones with dates]
**Next milestone:** [M# — label] by [date]
**Current priorities:**
  - [priority 1]
  - [priority 2]

Questions? [CSM name] · [contact]

Reviewer note (internal — `--draft` and `--update` only)

⚠️ Reviewer note

- Sources: [CRM ✓ verified | manual input]

- Data as of: [timestamp]

- Config fields read: onboarding model ([value]), milestone framework ([M1–M5

day targets]), duration target ([segment: X days]), plan format ([value])

- Milestone dates calculated from: contract start [date] + config day targets

- TtV projection: [X days vs. target Y days — on track / [±Z days]]

- Success criteria section: [placeholder — run /onboarding:success-criteria |

populated from prior run]

- Flagged for your judgment: [weekend milestone dates / missing stakeholders /

scope not yet confirmed | none]

- Before sharing: Remove the internal section (Section 7) and this reviewer

note. Confirm all milestone dates are accurate. Replace the success criteria

placeholder if criteria have been established.


Reference Files


Security & Permissions

This skill operates read-only against configuration files and connected MCP data sources.

No filesystem writes, no subprocess execution, no dynamic code execution.

All data access is through explicitly connected MCP connectors; no outbound network calls are made directly.

Trust & Verification

Customer-facing outputs (--summary mode) apply quiet mode — TtV targets, internal health assessments, and reviewer notes are suppressed.

All CRM and PM data is timestamped and staleness-flagged per G7.

TtV figures in Section 7 (internal planning view) are always tagged [review — internal planning target] and never appear in --summary output.

CSM review is required before sharing any customer-facing plan summary.

Guardrails

Dates anchor to contract start — never estimate. If the contract start date is

unavailable, leave all milestone dates as [confirm date]. A milestone date that

drifts from the actual contract start creates scheduling confusion from day one.

TtV is internal. The labels [review — internal planning target] and TtV

references appear only in the internal section of the plan and the reviewer note.

The customer-facing plan contains milestone dates and completion criteria — not

time-to-value framing, which is a planning metric, not a customer deliverable.

The plan is a living document. The --draft output is the baseline. Every

milestone completion, date shift, or scope change must go through --update to

keep the plan current. Do not regenerate the plan from scratch when an update is

needed — use --update to preserve the change log and milestone history.

Success criteria is a placeholder until confirmed. Section 6 always displays

a placeholder on the first --draft run unless the /onboarding:success-criteria skill has

already been completed for this account. Do not populate success criteria from

assumptions or sales notes — they require explicit agreement with the customer.

Model adaptation changes the ownership structure materially. The plan for a

partner-led account with a three-party ownership model looks substantially different

from a white-glove plan. If the model is [PLACEHOLDER], default to white-glove

and flag it — do not silently produce a generic plan.

Quiet mode for customer-facing output. The customer-facing export contains no

internal labels, TtV references, at-risk signals, reviewer notes, or escalation

paths. The customer receives a clean, professional document that reflects shared

commitments — not internal planning assumptions.

--summary is for async communication — not plan management. The summary

output is formatted for Slack, email, or stakeholder updates. It does not replace

the full plan and should not be treated as a plan revision. Direct any plan changes

to --update.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.