<!-- Status: [PROPOSED] -->
/onboarding:milestone-tracker
Milestone health tracking — single account or portfolio view.
Pre-flight
Read both configuration files before running any milestone tracking:
~/.claude/plugins/config/claude-for-customer-success/onboarding/CLAUDE.md~/.claude/plugins/config/claude-for-customer-success/company-profile.md
Fields read from onboarding config:
- Milestone framework (M1–M5 day targets, completion criteria, at-risk signals —
required for date calculations and risk assessment)
- Escalation matrix (thresholds for escalating at-risk milestones — who gets notified
and when)
- Onboarding model (affects which milestones are CSM-led vs. customer-led vs. partner-led)
- Duration targets by segment (anchors the expected M5 date for portfolio comparison)
If milestone framework is [PLACEHOLDER]:
"Milestone targets aren't configured. Run
/onboarding:cold-start-interview --section milestonesbefore running milestone
tracking — without configured targets, risk assessment will use generic defaults
that may not match your actual onboarding model."
Proceed with generic defaults if confirmed.
G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.
Trigger Precision
Use when:
- Checking the current milestone status and pace for one or more onboarding accounts (
--status) - Generating a portfolio heat map of milestone health across all active accounts (
--portfolio) - Triaging at-risk accounts and producing prioritized intervention actions (
--flag)
Do NOT use for:
- Diagnosing a specific active blocker (use
/onboarding:blocker-review --diagnose) - Time-to-value analysis with segment-normalized benchmarking (use
/onboarding:ttv-analysis) - Generating the onboarding plan or updating milestone targets (use
/onboarding:onboarding-plan)
Typical Activation
- "Where are we on milestones for [Account]?"
- "Show me the portfolio heat map for all active accounts"
- "Which accounts are at risk this week?"
- CSM runs
/onboarding:milestone-tracker [account] --statusto check a single account's milestone progress - CSM runs
/onboarding:milestone-tracker --portfolioto generate a portfolio-wide milestone heat map - CSM runs
/onboarding:milestone-tracker --flagto surface at-risk accounts for intervention
Reasoning Protocol
Before generating output, apply these primers:
- CLASSIFY: What type of milestone tracking request is this?
- Single-Account Status: One named account, CSM wants current milestone state before a touchpoint or review. Optimize for recency and actionable next-step.
- Portfolio Health Scan: Cross-account milestone view for book-of-business management or 1:1 prep. Requires segment normalization and consistent structure.
- At-Risk Triage: Surface accounts needing intervention — overdue or signal-triggered. Score by signal severity first, then date proximity.
- Escalation-Ready Brief: Specific account has breached escalation thresholds — output feeds an escalation workflow. Pair flag with root cause and escalation matrix routing.
- CONSTRAINTS: What limits the solution space?
- G7: All milestone data must carry a source timestamp and staleness indicator — PM connector data >24h old is flagged, manual input is labeled as such.
- G5: TtV projections and internal planning targets appear only in internal sections and reviewer notes — never in customer-facing output.
- G4: Escalation recommendations route through the configured escalation matrix with named owner, channel, and SLA — no generic "escalate to your manager."
- G2: Portfolio output is internal-only by default — apply confidentiality check before any distribution beyond the CSM.
- G1: Overdue is a flag, not a verdict — do not present an overdue milestone as a failure without CSM context on agreed deferrals or dependencies.
- Contract start date is the anchor for all date calculations — if missing, all milestone dates for that account are
[unverified]. Never silently estimate.
- EXPERT CHECK: What would a veteran onboarding manager verify first?
- Are behavioral at-risk signals (no login, missing attendees, credentials not received) assessed independently of date math? A milestone with 15 days remaining but a confirmed signal is more urgent than one 2 days overdue with no signal.
- Is milestone pace normalized to segment-specific duration targets from config? Enterprise M3 at Day 30 is on track; SMB M3 at Day 30 may be overdue.
- When PM connector data conflicts with CSM-reported status, is the discrepancy surfaced rather than silently resolved? The conflict itself is a signal.
- ANTI-PATTERNS: Common mistakes to avoid:
- Presenting stale PM data without a timestamp or staleness flag — the CSM acts on outdated milestone completion status.
- Sorting at-risk triage by days-overdue alone, missing accounts with behavioral signals that haven't breached date thresholds yet.
- Recommending generic actions ("follow up with the customer") instead of pulling specific escalation steps from the configured matrix.
- Comparing SMB and enterprise accounts on the same absolute day thresholds without normalizing to segment duration targets.
- Running date calculations when contract start date is missing or estimated — every downstream milestone target becomes unverified.
- Escalating from portfolio view alone without running single-account status first for full context.
After execution, verify:
- Does the output match the requested mode (--status / --portfolio / --flag) and the actual need?
- Are all data sources timestamped and staleness-flagged per G7?
- Are at-risk signals assessed independently of date math, not just as a date countdown?
- Confidence: [High] if PM connector + CRM data corroborate / [Medium] if single-source or partially stale / [Low] if manual input only — state which.
Mode
--status (default): Current milestone status for one named account. Shows milestone
table with dates, completion status, days-to-next-milestone, at-risk signals, and
recommended actions. Use before a customer touchpoint or QBR prep.
--portfolio: Milestone health summary across all active onboarding accounts. Requires
either a PM connector or a list of account names with contract start dates from the
CSM. Output is a portfolio heat map — not a per-account deep-dive.
--flag: At-risk and overdue milestone report. Surfaces only accounts with problems:
overdue milestones, approaching at-risk thresholds, blocked owners, or missing milestone
evidence. Ordered by severity (overdue first, then approaching deadline, then at-risk signal
count). Includes recommended action per flagged account.
Account identification and data pull
`--status` mode
Ask: "Which account?" If a CRM connector is available, pull contract start date and
CSM/AE assignment. If a PM connector is configured, pull current task status for
this account's milestone tasks.
PM connector pull (if available):
"[PM: Asana/Linear/Jira/Monday]: [account name] project · [N] tasks found ·
M[#] in progress · data as of [timestamp]"
If no PM connector:
"No PM connector configured. Tell me: which milestone is currently active, what's
complete, and the contract start date — I'll calculate dates and assess risk from
that."
`--portfolio` mode
If PM connector available:
"[PM]: pulling all projects tagged as onboarding accounts..."
If not: "Provide a list of active onboarding accounts with their contract start dates
and current milestone status — I'll build the portfolio view from that input."
`--flag` mode
Requires either PM connector (preferred) or CSM-provided account list with current
milestone status and contract start dates.
Milestone status calculation
For each milestone, calculate:
- Target date = contract start date + milestone day target from config
- Days remaining = target date − today
- Status — assign one of:
On track— target date is ≥ 5 days away and no at-risk signals presentDue soon— target date is 1–4 days away; escalate preparationAt risk— at-risk signals present (see below) OR days remaining < at-risk
threshold from config
Overdue— target date is in the past; milestone not marked completeComplete— milestone confirmed complete with evidence
At-risk signal assessment:
For each milestone, check the at-risk signals from config. Generic defaults (override
with config values):
| Milestone | At-risk signals |
|-----------|----------------|
| M1 | Required attendees not confirmed 48h before kickoff |
| M2 | Integration credentials not received by Day 7 |
| M3 | No product login activity in the first 14 days |
| M4 | No documented use case completion by Day 25 |
| M5 | Success criteria not confirmed by Day 45 |
Flag an account as At risk if any signal is present, regardless of days remaining.
Days-overdue escalation thresholds (from config; defaults below):
| Days overdue | Action |
|-------------|--------|
| 1–3 days | CSM self-resolve — reach out to customer champion |
| 4–7 days | Involve AE or escalation contact from config |
| 8+ days | Executive escalation (if white-glove) or formal risk flag |
`--status` output
Milestone Status — [Account Name]
Contract start: [date] · CSM: [name] · Model: [onboarding model]
Generated: [today]
| Milestone | Target | Status | Days remaining | Signal |
|-----------|--------|--------|---------------|--------|
| M1: Kickoff | [date] | Complete ✓ | — | — |
| M2: Tech setup | [date] | [status] | [N] | [signal or —] |
| M3: First use | [date] | [status] | [N] | [signal or —] |
| M4: First value | [date] | [status] | [N] | [signal or —] |
| M5: Handoff ready | [date] | [status] | [N] | [signal or —] |
Current milestone: M[#] — [label]
Next action: [specific recommended action based on current status]
[If any milestone is At risk or Overdue:]
⚠ Risk detail: [signal description and recommended escalation action]
Internal section (not for sharing):
TtV projection [review — internal planning target]:
Current pace: [N days from start to estimated M5]
Segment target: [X days]
Gap/surplus: [±Y days — on track | behind | ahead]
Escalation threshold: [current status vs. config thresholds]
`--portfolio` output
Onboarding Portfolio — Milestone Health
Generated: [today] · [N] active accounts
| Account | Model | M current | Status | Days remaining | Flag |
|---------|-------|-----------|--------|---------------|------|
| [name] | [model] | M[#] | On track | [N] | — |
| [name] | [model] | M[#] | At risk | [N] | ⚠ [signal] |
| [name] | [model] | M[#] | Overdue | -[N] | 🔴 [days overdue] |
Summary:
On track: [N] accounts
Due soon: [N] accounts
At risk: [N] accounts
Overdue: [N] accounts
[If at-risk or overdue accounts exist:]
Recommended first action: [highest-severity item]
`--flag` output
Ordered by severity — overdue first, then at-risk, then due soon.
At-Risk and Overdue Milestones — [today]
🔴 OVERDUE ([N] accounts)
[Account name] · M[#]: [milestone label] · [N] days overdue
Signal: [specific signal]
Recommended action: [escalation step from config escalation matrix]
Owner: [CSM name]
⚠ AT RISK ([N] accounts)
[Account name] · M[#]: [milestone label] · [N] days remaining
Signal: [specific at-risk signal]
Recommended action: [proactive step before milestone becomes overdue]
🟡 DUE SOON ([N] accounts)
[Account name] · M[#]: [milestone label] · [N] days remaining
Preparation needed: [next action]
---
Accounts reviewed: [N] · No issues: [N] · Flagged: [N]
Reviewer note (internal — `--status` and `--portfolio` only)
⚠️ Reviewer note
- Sources: [PM connector ✓ | CRM ✓ | manual input]
- Data as of: [timestamp]
- Config fields read: milestone framework (M1 [X]d, M2 [X]d, M3 [X]d,
M4 [X]d, M5 [X]d), escalation thresholds ([values])
- At-risk signals evaluated: [list of signals checked per milestone]
- TtV projection: [status vs. segment target — internal only]
- Flagged for your judgment: [accounts requiring immediate action | none]
- Data gaps: [accounts where contract start date was not available from CRM
— dates are estimates | none]
Output
Milestone tracking output — format driven by flag (--status, --portfolio,
--flag). Status mode: per-account milestone table with RAG status and next action.
Portfolio mode: cross-account summary table. Flag mode: at-risk milestone alert.
See mode-specific sections for field-level structure.
Reference Files
references/reasoning-blueprint.md— reasoning framework for this skill
Security & Permissions
This skill operates read-only against configuration files and connected MCP data sources.
No filesystem writes, no subprocess execution, no dynamic code execution.
All data access is through explicitly connected MCP connectors; no outbound network calls are made directly.
Trust & Verification
All milestone data is timestamped and staleness-flagged per G7 (PM connector >3 days, CRM >7 days).
At-risk flags are calculated from milestone math and configured at-risk signals — not from CSM narrative.
Portfolio outputs containing account-level health data require confidentiality check before sharing beyond the CSM.
CSM judgment is required for intervention actions — skill presents options, never directives.
Guardrails
At-risk signals override date-only assessment. A milestone with 10 days remaining
but a confirmed at-risk signal is flagged as At risk — not On track. Days remaining is
a countdown; at-risk signals are behavioral evidence. Both matter.
TtV projection is internal. The internal section with TtV labels appears only in
internal outputs and reviewer notes. Customer-facing milestone views show milestone
dates and completion status — not TtV framing.
--portfolio is a health map — not account management. The portfolio view surfaces
which accounts need attention. It does not replace per-account context. Before escalating
an at-risk flag, run --status on that account to understand the full picture.
Overdue ≠ failed. An overdue milestone may be legitimately deferred (customer
request, technical dependency, agreed scope change). The tracker flags it; the CSM
judges it. Do not present an overdue flag as a failure without CSM context.
PM connector data is authoritative over manual input. If a PM connector returns
task status that conflicts with CSM input, surface the discrepancy:
"PM connector shows M2 as incomplete, but you've indicated it's done. Confirm
the PM task has been updated, or I'll flag this as a data inconsistency."
--flag is for intervention — not reporting. The flag output is a working
document for the CSM's internal action planning. It is not formatted for sharing
with customers, leadership, or QBR decks. Extract and format specific items for
those audiences separately.
Missing contract start date breaks date calculation. If the contract start date
is unavailable for any account, all milestone dates for that account are [unverified].
Do not estimate contract start dates — request them from the CSM or CRM before
proceeding.