Kickoff prep

From t0ddc3by/claude-for-customer-success · View interactive version

Kickoff prep is an AI agent skill from the GitHub repository t0ddc3by/claude-for-customer-success. Prepare for an onboarding kickoff — generates a customized customer-facing agenda and an internal pre-kickoff checklist. Reads your kickoff format, required attendees, onboarding model, and milestone targets from your onboarding profile. Pulls account-specific context (segment, contract start date,

How to use this skill

Skill file

<!-- Status: [PROPOSED] -->

/onboarding:kickoff-prep

Kickoff agenda and preparation checklist for a specific account.


Pre-flight

Read both configuration files before building any kickoff materials:

  1. ~/.claude/plugins/config/claude-for-customer-success/onboarding/CLAUDE.md
  2. ~/.claude/plugins/config/claude-for-customer-success/company-profile.md

Fields read from config:

If either config file is missing or kickoff-related fields contain [PLACEHOLDER] markers:

"Kickoff format and required attendees aren't configured. Run

/onboarding:cold-start-interview --section kickoff to set these before

generating kickoff materials — the output will be generic without your

actual format and attendee requirements."

Proceed with a general structure if the user confirms they want to continue

despite missing config.

G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.


Trigger Precision

Use when:

Do NOT use for:

Typical Activation


Reasoning Protocol

Before generating output, apply these primers:

  1. CLASSIFY: What type of kickoff preparation request is this?
  1. CONSTRAINTS: What limits the solution space?
  1. EXPERT CHECK: What would a veteran onboarding CSM verify first?
  1. ANTI-PATTERNS: Common mistakes to avoid:

After execution, verify:

Mode

--prep (default): Generate both the customer-facing agenda draft and the

internal preparation checklist. Use when preparing for an upcoming kickoff

and need both the shareable artifact and the internal readiness view.

--agenda: Customer-facing agenda only — formatted for sharing with the

customer contact or including in the kickoff invite. Suppresses all internal

context, checklist items, and reviewer notes from the output.

--checklist: Internal pre-kickoff checklist only — covers logistics,

attendee confirmation, materials readiness, and first milestone setup.

Use when the agenda is already drafted and you need the internal prep view.


Account identification and data pull

Ask: "Which account is this kickoff for? Provide the account name and the

scheduled kickoff date."

If a CRM connector is available, pull:

Confirm the pull:

"[CRM]: [account name] · [segment] · kickoff [date] · contract start [date]

· CSM: [name] · AE: [name] · data as of [timestamp]"

If no connector is available:

"No CRM connector configured. Tell me the account name, segment, scheduled

kickoff date, and any stakeholders you know of — I'll build the materials

from what you provide."


Agenda builder

Construct the agenda based on:

Standard agenda structure — 60-minute call format

Adapt section timing based on total call length if different from 60 minutes.

| Time | Section | Purpose |

|------|---------|---------|

| 0–5 min | Introductions | Names, roles, relationship map — CSM, AE (if attending), customer team |

| 5–15 min | Partnership vision | Why this partnership, what success looks like from both sides |

| 15–25 min | Onboarding plan overview | Timeline, milestones, what happens when |

| 25–40 min | First priorities | The 2–3 things that must happen before the next milestone |

| 40–50 min | Questions and alignment | Customer's open questions; confirm shared understanding |

| 50–60 min | Next steps and close | Named actions, owners, and dates; confirm communication cadence |

Populate the agenda draft with:

[Google Doc / Notion / shared tracker] after this call")

Model adaptations

white-glove: Expand "Partnership vision" section; include an executive

sponsor introduction segment if the exec is attending. Add a dedicated

slide/section for "Our team's commitment to you" framing.

guided-self-serve: Compress the "Partnership vision" section; expand

"First priorities" to emphasize what the customer's team will own. Add a

"Resources available to you" section (documentation, training portal,

support channels).

implementation-plus-handoff: Add an "Implementation phase overview"

section between milestones and first priorities. Name the implementation

engineer (if applicable) and distinguish their role from the CSM's role.

Include the handoff milestone explicitly in the timeline overview.

partner-led: Add a "How we'll work together with [partner name]" section.

Clarify the three-way relationship (customer / partner / company). Describe

the escalation path if the customer needs to reach the company directly.

Async / Loom format

If kickoff format is async (Loom + written agenda):

Structure the written document as:

  1. Welcome and context (1 paragraph)
  2. Your onboarding timeline (milestone table with dates)
  3. What we need from you in the next [M1 days] (named list)
  4. How we'll communicate (cadence and format)
  5. Your next step (single action with date)

The Loom companion covers introductions and vision; the written document

handles the structured reference content.


Pre-kickoff checklist

The internal checklist covers five categories.

1. Attendee confirmation

For each required attendee from config:

Flag if any required attendee is unconfirmed within 48 hours of kickoff:

"⚠️ [Role] not yet confirmed. Reach out via [email / Slack] before the call

— an unattended kickoff without [executive sponsor / technical lead] often

delays M1."

2. Materials readiness

3. Account context review

4. First milestone setup

5. Post-kickoff actions (prepare before the call)


Output format

`--prep` output

[Customer-facing agenda — formatted for sharing, no internal content]

---

[Internal header: ⚠️ Internal use only — do not share with customer]

[Pre-kickoff checklist — 5 categories]

[Reviewer note]

`--agenda` output (quiet mode — customer-facing only)


[Company Brand Name] × [Account Name] — Onboarding Kickoff

[Date] · [Time and timezone] · [Format: video call / in-person / async]

Attendees from [Company]: [CSM name], [AE name if attending], [IE name if applicable]

We'll need from your team: [Required attendees from config]


Agenda

[Time sections from agenda builder, formatted as a clean list]

First milestone target: [M1 target date] — [M1 completion description]

Your onboarding plan will be shared in [format] following this call.

Questions before we meet? Reach [CSM name] at [contact].


`--checklist` output


Pre-Kickoff Checklist — [Account Name]

Kickoff: [date] · Prepared: [today]

[5 checklist categories with current completion status]


Reviewer note (internal — `--prep` and `--checklist` modes only)

⚠️ Reviewer note

- Sources: [CRM ✓ verified | manual input]

- Data as of: [timestamp]

- Config fields read: kickoff format ([value]), required attendees ([value]),

model ([value])

- Flagged for your judgment: [unconfirmed attendees / missing handoff notes /

M1 date not yet calculated — contract start date not found | none]

- Before sending agenda: Remove this reviewer note block. Confirm [Company Brand

Name] appears correctly in the header. Confirm the M1 target date is accurate

before the customer sees it.


Reference Files


Security & Permissions

This skill operates read-only against configuration files and connected MCP data sources.

No filesystem writes, no subprocess execution, no dynamic code execution.

All data access is through explicitly connected MCP connectors; no outbound network calls are made directly.

Trust & Verification

Customer-facing outputs (--agenda mode) apply quiet mode — internal labels, risk flags, and CSM preparation notes are suppressed.

All CRM data is timestamped and staleness-flagged per G7 (CRM >7 days).

Kickoff agendas shared with customers contain no internal TtV targets, health scores, or escalation context.

CSM review is required before sharing any customer-facing agenda output.


Guardrails

Agenda is a draft. The generated agenda requires CSM review before sharing.

Account-specific context (stakeholder names, integration details, known priorities)

must be verified and added. Do not send the agenda without reviewing it.

Required attendees drive the checklist. If a required attendee from config is

unconfirmed, flag it explicitly — do not suppress the warning. A kickoff without

the required attendees often restarts the milestone clock.

M1 date calculation requires contract start date. If the contract start date

is unavailable from CRM or user input, leave M1 target date as [confirm date]

rather than estimating. A wrong M1 date in a customer-facing document erodes

trust at the start of the relationship.

Model adaptation is not optional. The agenda structure changes materially

between onboarding models. If the model is configured as [PLACEHOLDER], default

to the white-glove structure and flag it — do not silently produce a generic agenda.

Quiet mode for customer-facing output. The --agenda output contains no

internal labels, confidence signals, reviewer notes, or checklist items. All

internal content is suppressed. The customer receives a clean, professional document.

Partner-led requires partner visibility. If the model is partner-led, the

agenda must name the partner and clarify the three-way relationship. Do not produce

a two-party agenda for a three-party engagement — it creates confusion at the call.

Post-kickoff preparation is the last checklist category. Preparing the

follow-up email and next-steps document before the call — not after — ensures

the CSM can send a same-day follow-up without delay. This is a discipline point,

not an optional step.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.