Handoff doc

From t0ddc3by/claude-for-customer-success · View interactive version

Handoff doc is an AI agent skill from the GitHub repository t0ddc3by/claude-for-customer-success. Generate the onboarding graduation handoff document — the structured transfer of account context from the onboarding CSM to the post-onboarding team (CSM, AE, support, or partner). Reads graduation criteria, escalation contacts, and handoff format from your onboarding profile. Pulls account history

How to use this skill

Skill file

<!-- Status: [PROPOSED] -->

/onboarding:handoff-doc

Onboarding graduation handoff document.


Pre-flight

Read both configuration files before generating any handoff materials:

  1. ~/.claude/plugins/config/claude-for-customer-success/onboarding/CLAUDE.md
  2. ~/.claude/plugins/config/claude-for-customer-success/company-profile.md

Fields read from onboarding config:

is valid — these drive the readiness check)

has an executive relationship section; implementation-plus-handoff has a technical

configuration section; partner-led has a partner context section)

so the receiving team knows what to do in the first 30 days)

If graduation criteria are [PLACEHOLDER]:

"Graduation criteria aren't configured. Run

/onboarding:cold-start-interview --section handoff to define graduation criteria

before generating a handoff document. Without configured criteria, the readiness

check cannot be run and the document will use generic conditions."

Proceed with generic graduation criteria if confirmed.

G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.


Trigger Precision

Use when:

Do NOT use for:

Typical Activation


Reasoning Protocol

Before generating output, apply these primers:

  1. CLASSIFY: What type of handoff request is this?
  1. CONSTRAINTS: What limits the solution space?
  1. EXPERT CHECK: What would a veteran onboarding CSM verify first?
  1. ANTI-PATTERNS: Common mistakes to avoid:

After execution, verify:

Mode

--readiness (run before --draft): Pre-handoff graduation check. Assesses whether

the account has met all graduation criteria before the document is generated. Produces

a pass/fail assessment per criterion, flags any unmet items, and recommends whether

to proceed with handoff or address remaining gaps first. Use this to avoid handing

off an account that isn't actually ready.

--draft (default): Full handoff document. Generates the complete account context

transfer — milestone history, success criteria achievement status, stakeholder map,

technical configuration, relationship notes, open items, and recommended next plays

for the receiving team. Requires the graduation readiness check to pass (or CSM

override with documented justification).

--summary: Abbreviated handoff brief — 1–2 page overview for verbal or async

handoffs. Covers only the most critical context: who the account is, what they

achieved in onboarding, who owns what now, and what the receiving team needs to do

in their first 30 days. Use when the full document exists but the receiving CSM needs

a quick-read version.


Account identification and data pull

Ask: "Which account is graduating? Provide the account name and the handoff date

(when the receiving team takes ownership)."

If CRM connector available, pull:

If PM connector available, pull:

Confirm:

"[CRM]: [account name] · [segment] · ARR: [value] · renewal: [date] · data as of

[timestamp]"

"[PM]: M1–M5 completion dates retrieved · [N] open items at handoff · data as of

[timestamp]"

If neither connector: "Provide the account name, key stakeholders, milestone completion

dates, and any open items — I'll build the handoff document from your input."


`--readiness` mode: Graduation check

Run before generating the handoff document. Check each graduation criterion from config:

Present as a checklist:

Graduation Readiness — [Account Name]
M5 target date: [date] · Readiness check date: [today]

Graduation Criteria:

[ ] M5 milestone complete — all completion criteria met
[ ] Success criteria confirmed — customer has acknowledged achievement in writing
    or on a call (not assumed by CSM)
[ ] All provisioned users have logged in at least once
[ ] Integration(s) active and validated
[ ] Customer has named their post-onboarding point of contact
[ ] Open items from onboarding are documented and ownership transferred
[ ] Receiving team has been introduced to the customer or has a scheduled intro call
[ ] Executive sponsor has been updated (if white-glove model)
[ ] Implementation handoff complete (if implementation-plus-handoff model)
[ ] Partner alignment confirmed (if partner-led model)

Overall: [PASS — ready to generate handoff doc | CONDITIONAL PASS — [N] items
pending, see recommendations | HOLD — graduation criteria not met]

If HOLD or CONDITIONAL PASS:

"The account is not yet ready for handoff. Unmet criteria:

- [criterion 1] — recommended action: [action]

- [criterion 2] — recommended action: [action]

If you need to proceed despite unmet criteria, document the justification and I'll

include it in the handoff document as an open item for the receiving team."


Handoff document structure

Section 1 — Account summary

Account: [name]
Segment: [segment] · ARR: [value] · Product tier: [tier]
Contract start: [date] · Renewal: [date]
Onboarding model: [model]
Onboarding CSM: [name] · Receiving team: [name(s)]
Handoff date: [date]

Section 2 — Onboarding performance summary

Milestone history:

| Milestone | Target date | Actual date | Variance | Notes |

|-----------|-------------|-------------|----------|-------|

| M1: Kickoff | [date] | [date] | [±N days] | [any notable context] |

| M2: Tech setup | [date] | [date] | [±N days] | |

| M3: First use | [date] | [date] | [±N days] | |

| M4: First value | [date] | [date] | [±N days] | |

| M5: Handoff ready | [date] | [date] | [±N days] | |

Blockers encountered during onboarding (from blocker log or CSM input):

Section 3 — Success criteria achievement

For each confirmed success criterion:

Criterion: [criterion statement]
Status: ✓ Achieved / ◐ Partially achieved / ○ Not achieved
Evidence: [what the CSM observed or the customer confirmed]
Owner during onboarding: [customer name/role]
Post-onboarding owner: [who maintains this outcome going forward]

If any criterion was not achieved:

"⚠ Criterion [X] was not fully achieved. Recommended action for the receiving team:

[specific next step — do not leave unachieved criteria without a recommended path]."

Section 4 — Stakeholder map

| Role | Name | Contact | Engagement level | Notes |

|------|------|---------|-----------------|-------|

| Executive sponsor | [name] | [email/Slack] | [high/medium/low] | [engagement notes] |

| Champion | [name] | [contact] | [level] | [notes] |

| Technical lead | [name] | [contact] | [level] | [notes] |

| Day-to-day contact | [name] | [contact] | [level] | [notes] |

| Billing contact | [name] | [contact] | — | [notes] |

Relationship notes: [Any relationship dynamics the receiving team should know — exec

relationship quality, political sensitivities, communication preferences, preferred

meeting format]

Section 5 — Technical configuration

Integration and technical setup:

| Integration / configuration | Status | Owner | Notes |

|----------------------------|--------|-------|-------|

| [Integration 1] | Active | [technical lead] | [any quirks or custom config] |

| [Integration 2] | Active / Pending | | |

User provisioning:

Support history: [open tickets at handoff, if any · ticket # and status]

Section 6 — Open items at handoff

Items not fully resolved at graduation, transferred to the receiving team:

| Item | Type | Priority | Owner | Target resolution |

|------|------|----------|-------|------------------|

| [item] | [technical/adoption/relationship] | [P1-P4] | [receiving team member] | [date] |

If no open items: "No open items transferred. Account graduated clean."

Section 7 — Recommended plays for the receiving team

Based on the account's onboarding history and CS methodology from config, recommend

2–3 specific next plays or actions for the receiving team's first 30 days:

  1. [Play or action — specific, not generic]: [why this account needs this next]
  2. [Play or action]
  3. [If applicable]

Renewal context (if available from CRM):

mentioned, additional team requests, feature asks]

Section 8 — Model-specific sections

white-glove only:

"Executive relationship: The executive sponsor is [name]. Engagement during

onboarding was [high/medium/low]. Preferred communication format: [email/quarterly

call/Slack]. Last executive touchpoint: [date]. The [receiving role] should

schedule an executive introduction call within 30 days of handoff."

implementation-plus-handoff only:

"Implementation handoff complete: [date]. The implementation engineer ([name])

is available for technical questions for [N] days post-handoff per the

implementation agreement. Escalation path for technical issues post-handoff:

[support / implementation engineer / CSM]."

partner-led only:

"Partner: [partner name] · Partner contact: [name, contact]. The partner's

ongoing role post-onboarding: [scope]. Escalation path if customer contacts

company directly: [path]. Partner relationship quality: [strong/stable/needs

attention — brief note]."


`--summary` output (quiet mode — for verbal or async handoffs)

**[Account Name] — Handoff Brief**
*Handoff: [date] · From: [onboarding CSM] · To: [receiving team]*

**Who they are:**
[2–3 sentences: segment, industry, primary use case, why they bought]

**What they achieved:**
[Success criteria met — 2–3 key outcomes in plain language]

**Who to know:**
[Champion name, executive sponsor if applicable, technical lead — one line each]

**What to watch:**
[Top 1–2 risk flags or open items the receiving team should address first]

**First 30 days:**
[2–3 specific recommended actions — numbered list]

**Renewal context:**
[Renewal date] · [Expansion signals if any] · [Risk level: low/medium/high]

Questions about this account: [onboarding CSM name] · [contact]

Reviewer note (internal — `--draft` and `--readiness` only)

⚠️ Reviewer note

- Sources: [CRM ✓ | PM ✓ | manual input]

- Data as of: [timestamp]

- Config fields read: graduation criteria ([list]), onboarding model ([value]),

escalation matrix ([post-onboarding contacts])

- Graduation check: [PASS / CONDITIONAL PASS — [N] items / HOLD — override

documented]

- Success criteria status: [N] of [N] achieved; [N] partially achieved;

[N] not achieved

- Open items transferred: [N] — see Section 6

- Expansion signals noted: [yes — see Section 7 | none]

- Flagged for your judgment: [unmet criteria with no recommended path / missing

stakeholder contacts / technical open items without an owner | none]

- Before sharing with receiving team: Confirm receiving team contact names are

current. Verify renewal date from CRM — do not rely on onboarding plan date.

Ensure open items in Section 6 have owners assigned.


Output

Onboarding handoff output — format driven by flag (--draft, --readiness,

--summary). Draft mode: full structured handoff document. Readiness mode:

graduation checklist with go/no-go recommendation. Summary mode: concise async

handoff note. See mode-specific sections for field-level structure.

[review before sending]

Reference Files


Security & Permissions

This skill operates read-only against configuration files and connected MCP data sources.

No filesystem writes, no subprocess execution, no dynamic code execution.

All data access is through explicitly connected MCP connectors; no outbound network calls are made directly.

Trust & Verification

Handoff documents contain ARR, contract terms, and health context — confirm receiving team is authorized before sharing (per G5).

All CRM and PM data is timestamped and staleness-flagged per G7 (CRM >7 days, PM >3 days).

Expansion signals in handoff documents are observations only — never converted to pipeline commitment.

Graduation criteria are driven by configured values, not assumed by the skill — placeholder criteria produce a warning before proceeding.

Guardrails

Run --readiness before --draft. A handoff document generated before the

graduation check has passed may transfer an account that isn't ready. The readiness

check is the gate — not an optional step. If the CSM overrides a HOLD finding, the

justification must be documented in Section 6 as an open item.

Unachieved success criteria require a forward path. A success criterion marked

"Not achieved" cannot be silently dropped from the handoff document. It must appear

in Section 3 with a recommended action for the receiving team. Unachieved criteria

without a forward path leave the receiving team without context and the customer

without resolution.

Stakeholder contacts must be verified. Contact information pulled from CRM may

be outdated — people change roles. Ask the CSM: "Are all stakeholder contacts

current? Any role changes since kickoff?" Flag unverified contacts in the reviewer note.

Open items require owners before handoff. An open item without an owner is an

orphaned problem. Every item in Section 6 must have a named owner — either from

the receiving team or from the customer side. The onboarding CSM should not be

named as owner on items that transfer to the receiving team.

--summary is a supplement — not a replacement. The handoff brief is for

quick consumption, not the authoritative record. The full --draft document

should exist and be accessible to the receiving team even when the summary is used

for the verbal handoff call.

Expansion signals are observations — not pipeline. Noting an expansion signal

in the handoff document is appropriate context. Converting it to pipeline commitment

in the handoff document is not — that is the AE's and receiving CSM's job after

reviewing the context. Describe what was observed; do not qualify it.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.