Nw jtbd opportunity scoring

From nWave-ai/nWave · View interactive version

Nw jtbd opportunity scoring is an AI agent skill from the GitHub repository nWave-ai/nWave. JTBD opportunity scoring and prioritization - outcome statement format, opportunity algorithm, scoring interpretation, feature prioritization, and opportunity matrix template

How to use this skill

Skill file

JTBD Opportunity Scoring

Use when prioritizing features, stories, or backlog items based on customer-defined outcomes. Opportunity scoring (Ulwick's ODI) replaces gut-feel prioritization with evidence-based ranking.

Outcome Statements

Every customer need expressed as a desired outcome following strict format:

[Direction] + the [metric] + [object of control] + [contextual clarifier]

Examples

Quality Checks

Outcome statement must be: Solution-free (no specific technology) | Measurable (ratable on importance/satisfaction 1-5) | Controllable (customer can assess improvement) | Unambiguous (same interpretation by all stakeholders)

Deriving Outcome Statements

Walk the 8-step job map (Define, Locate, Prepare, Confirm, Execute, Monitor, Modify, Conclude) and generate 2-3 per step. Produces 16-24 outcome statements per job -- comprehensive view of customer needs.

| Job Map Step | Outcome Statement Pattern |

|-------------|--------------------------|

| Define | "Minimize the time to determine [what is needed]" |

| Locate | "Minimize the likelihood of missing [required input]" |

| Prepare | "Minimize the time to set up [environment/context]" |

| Confirm | "Minimize the likelihood of proceeding with [invalid state]" |

| Execute | "Minimize the time to complete [core action]" |

| Monitor | "Minimize the likelihood of [undetected failure]" |

| Modify | "Minimize the time to recover from [exception]" |

| Conclude | "Minimize the likelihood of [incomplete cleanup]" |

The Opportunity Algorithm

Opportunity Score = Importance + max(0, Importance - Satisfaction)

Where:

How It Works

Rewards outcomes both important and unsatisfied. If satisfaction >= importance, the second term is zero. If satisfaction < importance, the gap amplifies the score. Classify the resulting score using the bands below; a gap alone does not establish an underserved outcome.

Score Interpretation

| Score Range | Category | Action |

|-------------|----------|--------|

| 15 <= score <= 20 | Extremely underserved | High-priority; invest heavily |

| 12 < score < 15 | Underserved | Strong opportunity; plan for next iteration |

| 10 <= score <= 12 | Appropriately served | Maintain; incremental improvement |

| < 10 | Overserved | Simplification candidate; may be over-engineered |

Applying to Feature Prioritization

Step 1: Generate Outcome Statements

From job mapping and interview findings, compile 15-30 per major job.

Step 2: Rate Importance and Satisfaction

Gather ratings from users/stakeholders. For small teams:

Step 3: Calculate and Rank

Compute scores, sort descending. Top scores = highest-priority features.

Step 4: Map to Stories

Each high-scoring outcome maps to one or more stories. Score 15+ should produce at least one story in current iteration.

Step 5: Identify Overserved Areas

Scores below 10 are simplification candidates. Resources on overserved outcomes are better redirected to underserved ones.

Opportunity Scoring Matrix Template

## Opportunity Scoring: [Product/Feature Area]

| # | Outcome Statement | Imp. (%) | Sat. (%) | Score (0-20) | Priority |
|---|-------------------|----------|----------|-------|----------|
| 1 | Minimize the time to [outcome A] | | | | |
| 2 | Minimize the likelihood of [outcome B] | | | | |
| 3 | Maximize the [quality] when [context C] | | | | |

### Scoring Method
- Importance: percentage of respondents rating 4+ on a 5-point scale, divided by 10
- Satisfaction: percentage of respondents rating 4+ on a 5-point scale, divided by 10
- Score: Importance + max(0, Importance - Satisfaction); e.g., 90% and 60% become 9 and 6, giving 12
- Priority: Extremely Underserved (15-20), Underserved (>12 and <15),
  Appropriately Served (10-12 inclusive), Overserved (<10)

### Top Opportunities (Score > 12)
1. [Outcome] -- Score: [X] -- Story: [link or title]
2. [Outcome] -- Score: [X] -- Story: [link or title]

### Overserved Areas (Score < 10)
1. [Outcome] -- Score: [X] -- Simplification opportunity: [description]

### Data Quality Notes
- Source: [user interviews / team estimates / support ticket analysis]
- Sample size: [N respondents]
- Confidence: [High if N >= 10 with user data, Medium if team estimates]

Worked Example

Context: CLI tool for deploying applications. 8 users surveyed.

| # | Outcome Statement | Imp. | Sat. | Score | Priority |

|---|-------------------|------|------|-------|----------|

| 1 | Minimize time to identify root cause of failed deployment | 92% | 35% | 14.9 | Underserved |

| 2 | Minimize likelihood of deploying untested code | 88% | 72% | 10.4 | Appropriately Served |

| 3 | Minimize time to roll back a bad deployment | 85% | 30% | 14.0 | Underserved |

| 4 | Minimize time to onboard a new team member to deploy | 65% | 40% | 9.0 | Overserved |

| 5 | Minimize likelihood of misconfiguring environment variables | 80% | 45% | 11.5 | Appropriately Served |

Prioritization result:

  1. Root cause identification (14.9) -- build better deployment diagnostics
  2. Rollback speed (14.0) -- invest in one-command rollback
  3. Environment misconfiguration (11.5) -- incremental improvements to validation
  4. Untested code prevention (10.4) -- maintain current pre-deploy checks
  5. Onboarding time (9.0) -- consider simplifying; current docs may be over-engineered

Small-Team Adaptations

Ulwick's methodology assumes large-scale surveys (100+ respondents). For small agile teams:

Integration with Other Prioritization Methods

| Method | Best For | Combine With Opportunity Scoring |

|--------|----------|--------------------------------|

| MoSCoW | Sprint-level scope decisions | Use opportunity scores to inform Must/Should/Could |

| Value/Effort matrix | Quick relative ranking | Use opportunity scores as "value" axis |

| RICE | Feature-level prioritization | Use opportunity score as "Impact" component |

| Story mapping | Release planning | Use opportunity scores to prioritize rows (MVP vs later) |

Cross-References

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.