Time entries

From wyre-technology/msp-claude-plugins · View interactive version

Time entries is an AI agent skill from the GitHub repository wyre-technology/msp-claude-plugins. Autotask time entry structure: approval status codes and workflow, the time entry field schema, the billing rate hierarchy, budget and contract-limit validation, utilization analytics, and the MSP business rules for rounding and minimum billing increments.

How to use this skill

Skill file

Autotask Time Entry Management

Overview

Time entries are the foundation of MSP billing and resource utilization tracking. Every hour logged against tickets, projects, and contracts flows through the time entry system. This skill covers comprehensive time management including billing calculations, approval workflows, budget validation, and utilization analytics.

Anti-triggers

autotask-ticket-notes-attachments for ticket charges.

autotask-billing.

autotask-contracts.

Approval Status Codes

Based on the Autotask API, these are the time entry approval statuses:

| Status ID | Name | Description | Business Logic |

|-----------|------|-------------|----------------|

| 0 | DRAFT | Entry created but not submitted | Editable by resource |

| 1 | SUBMITTED | Submitted for approval | Locked, awaiting manager review |

| 2 | APPROVED | Manager approved entry | Included in billing cycle |

| 3 | REJECTED | Manager rejected entry | Returned for correction |

Approval Workflow

DRAFT (0) ────────────────> SUBMITTED (1)
                                │
                    ┌───────────┴───────────┐
                    ▼                       ▼
              APPROVED (2)            REJECTED (3)
                    │                       │
                    ▼                       ▼
          Billing Cycle              Back to DRAFT

Workflow Rules:

Time Entry Field Reference

The fields you touch on nearly every call:

| Group | Key fields |

|-------|-----------|

| Core | id, resourceID, ticketID, projectID, taskID, contractID |

| Time | dateWorked (YYYY-MM-DD), hoursWorked, startDateTime, endDateTime |

| Billing | isBillable, billingCodeID, contractID |

| Rate | hourlyRate, roleID, internalBillingCodeID |

| Approval | approveAndPostDate, approvalStatus |

| Description | summaryNotes (client-visible), internalNotes |

A time entry requires either a ticketID or a projectID — never neither, and

never both.

See references/fields.md for the complete field reference.

Billing Calculations

Rate Hierarchy

Billing rates are determined in this order:

  1. Contract Rate - Specific rate defined in contract
  2. Resource Rate - Rate assigned to technician
  3. Role Rate - Rate based on assigned role
  4. Default Rate - System default rate

The first match wins; a contract rate silently overrides a resource's own rate,

which is a common source of "wrong invoice amount" reports.

See references/examples.md for the rate-resolution,

billing-amount, and billability-determination implementations.

Approval Requirements

Automatic Approval Triggers

Certain conditions automatically require manager approval:

| Condition | Requires Approval | Reason |

|-----------|-------------------|--------|

| Billable time | Yes | Financial impact |

| Hours > 8 | Yes | Overtime review |

| Weekend work | Yes | Policy compliance |

| Holiday work | Yes | Policy compliance |

| Exceeds budget | Yes | Cost control |

See references/examples.md for the requiresApproval

implementation.

Budget Validation

Before posting time, check both the project's hour budget and the contract's

block-hour or retainer limit — they are tracked separately and either can be

exceeded independently. Crossing 90% of a project budget flips the entry into

requiring manager approval.

See references/examples.md for the project-budget and

contract-limit check implementations.

Time Analytics & KPIs

Industry Benchmarks

| Metric | Target | Good | Excellent |

|--------|--------|------|-----------|

| Utilization Rate | 65% | 70-75% | 80%+ |

| Average Daily Hours | 6.5h | 7h | 7.5h |

| Approval Turnaround | 24h | 8h | 4h |

| Entry Accuracy | 95% | 98% | 99%+ |

See references/examples.md for the utilization-rate

calculation.

API Patterns

| Purpose | Call |

|---------|------|

| Create entry | POST /TimeEntries |

| Query entries | POST /TimeEntries/query with a filter array |

| Submit for approval | PATCH /TimeEntries/{id} setting the approval field |

| Approve / reject | PATCH /TimeEntries/{id} (approver credentials required) |

See references/api.md for the full create/query request

bodies and the submit, approve, and reject patterns.

Resource Roles

Every ticket or task time entry needs a billing role the resource actually holds, and so does a ticket assigned to a resource. Look the valid role IDs up with autotask_search_resource_roles (resourceId, or resourceName such as "Jane Tech"; includeInactive to see retired assignments) instead of guessing; a role the resource does not hold is the usual cause of a rejected autotask_create_time_entry (a write-tier tool).

Business Rules

Quarter-Hour Rounding

Standard MSP practice is to round time to the nearest quarter hour:

function roundToQuarterHour(hours) {
  return Math.round(hours * 4) / 4;
}

// Examples:
// 1.12 → 1.0
// 1.13 → 1.25
// 1.38 → 1.5
// 1.63 → 1.75
// 1.88 → 2.0

Minimum Billing Increments

| Work Type | Minimum | Rationale |

|-----------|---------|-----------|

| Remote Support | 0.25h (15 min) | Quick remote fixes |

| Phone Call | 0.25h (15 min) | Brief calls |

| On-Site Visit | 1.0h (60 min) | Travel overhead |

| Emergency/After Hours | 1.0h (60 min) | Premium rate |

Default Date Handling

If no date is provided, default to the current date:

function setDefaultDate(timeEntry) {
  if (!timeEntry.dateWorked) {
    timeEntry.dateWorked = new Date().toISOString().split('T')[0];
  }
  return timeEntry;
}

Common Workflows

Daily Time Entry Flow

  1. Log time - Create entry with work details
  2. Review - Check accuracy and completeness
  3. Submit - Change status to SUBMITTED (1)
  4. Await approval - Manager reviews entry
  5. Resolve - Entry approved or rejected

End of Week Timesheet

// Get all draft entries for the week
const weekEntries = await queryTimeEntries({
  filter: [
    {field: 'resourceID', op: 'eq', value: currentResourceId},
    {field: 'dateWorked', op: 'between', value: [weekStart, weekEnd]},
    {field: 'approvalStatus', op: 'eq', value: 0}
  ]
});

// Submit all for approval
for (const entry of weekEntries) {
  await updateTimeEntry(entry.id, { approvalStatus: 1 });
}

Manager Approval Queue

// Get pending approvals for my team
const pendingApprovals = await queryTimeEntries({
  filter: [
    {field: 'approvalStatus', op: 'eq', value: 1},
    {field: 'dateWorked', op: 'gte', value: lastWeekStart}
  ],
  includeFields: ['Resource.firstName', 'Resource.lastName', 'Ticket.title']
});

Error Handling

Common API Errors

| Code | Message | Resolution |

|------|---------|------------|

| 400 | TicketID or ProjectID required | Provide either ticket or project |

| 400 | Invalid hours value | Hours must be positive decimal |

| 400 | Future date not allowed | Date cannot be in future |

| 401 | Unauthorized | Verify API credentials |

| 403 | Cannot modify approved entry | Entry is locked after approval |

| 409 | Entry already submitted | Cannot edit while pending |

Validation Errors

| Error | Cause | Fix |

|-------|-------|-----|

| ResourceID required | Missing technician | Add resourceID field |

| Invalid dateWorked | Date format wrong | Use YYYY-MM-DD format |

| Hours exceed 24 | Too many hours | Check hour calculation |

| Missing summary | No description | Add summaryNotes |

Best Practices

  1. Log time immediately - Don't batch at end of day; details get lost
  2. Use descriptive summaries - Clients see these on invoices
  3. Round appropriately - Follow minimum billing rules
  4. Link to tickets/projects - Always associate with work items
  5. Monitor utilization - Track billable vs non-billable ratio
  6. Review budget warnings - Address before exceeding limits
  7. Use billing codes - Categorize time for reporting
  8. Keep internal notes separate - Don't bill clients for non-value work
  9. Approve promptly - Long approval queues delay billing

Related Skills

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.