Git Commit Order
What belongs in each commit is settled first, by the git commit convention. This settles which
of them comes first.
The first commit is the one that turns the suite red
**Where a change and the tests that check it are separate commits, whichever of the two makes
the suite fail goes first — the red side must come first.** This is the basis of
test-driven development: the red commit states the claim on its own, and what comes after it
is what turns the suite green. A reader stands at the red commit and watches the test fail for
the reason it exists; taken the other way round, every step is green and nothing distinguishes a
test that checks the change from one that asserts nothing.
- Neither side is limited to one commit. Several tests may each be turned red, one commit
apiece, before any of them is answered; the fixes then follow, each turning its own test green,
in the order the tests went red. A test that fails until two classes are both fixed is answered
by one commit per class, and stays red until the last of them lands. The rule is about which
side comes first, not about either side fitting in one commit:
| Commit | Test A | Test B | Test C |
| :-- | :-- | :-- | :-- |
| Update test A | red | green | green |
| Update test B | red | red | green |
| Update test C | red | red | red |
| Fix A | green | red | red |
| Fix B | green | green | red |
| Fix C | green | green | green |
Adding puts the tests first
**A class, a member or a behavior that is being added has its tests committed before its
implementation.** The test commit states what the code is expected to do, and the implementation
commit is the one that makes the statement true. Committed the other way round, the tests only
confirm what already worked, and there is no commit at which the claim stands on its own to be
reviewed. This is test-driven development written into the history rather than into the editor.
- A test commit in which nothing fails asserts nothing. It may hold cases that pass —
covering behavior the change leaves alone — but not only those. Which cases fail against the
unchanged code, and which pass, is read as the Jest convention (/hoc-jest) describes.
Reducing puts the implementation first
**Where the work takes something away, the implementation changes first and the tests are
committed second.** Deleting a file, a class or a method, or lowering a limit the implementation
enforces, such as the length it allows a description: — taking the tests out, or bringing them
into line, first turns nothing red, because the code they check still satisfies them. So the
implementation goes first and fails the suite, and the commit that brings the tests into line is
the one that clears it.
- In this order the red persists until the correct tests come out. Remove
the wrong ones and the suite is still failing, because the tests for the
member just deleted are still sitting there. That is the check doing its
work.
- The reverse order is green at every step, because a suite with fewer
tests still passes. Removing tests first and the member second reports
nothing at either commit, whether or not the right tests were taken.
- It is silent exactly where it matters most. Take a member that never had
tests of its own. Remove tests first, take another member's by mistake, then
remove the member: both commits pass, the other member is now uncovered, and
nothing anywhere said so. There was no red to go missing, because there was
never a test to turn red.
A test that holds a ceiling
**A byte budget, a size limit, a threshold recorded per file: which side goes first follows from
the same rule.** Raising the ceiling first turns nothing red, because nothing is over it yet. So
the change it guards goes first and fails the suite, and the raised ceiling after it is what
passes. Shrinking runs the other way — the lowered ceiling first, failing, then the cut that fits
under it. Commit whichever side turns the suite red first; that is the rule above, read
against the kind of test rather than the word "test".
- Measured on a kit of skills held to per-file byte budgets: with each budget committed ahead of
the text it made room for, none of eight budget commits failed. Reordered, all eight text
commits failed and every budget after them passed.
The red has to be gone where the branch merges
**A commit inside a branch may stand red; the branch may not, at the point it is offered for
merge** — when its pull request is opened, or before it is merged locally into a trunk. Every
order above leaves a red commit behind it on purpose, and the commit that clears it lands on the
same branch, so by that point the whole suite is green again.
- "Every commit should be green" is not a reason to reverse the order. It is the one argument
that leads to removing the tests first, and it trades the check for a history in which nothing
ever fails. Whether a single commit passes is not the criterion; whether the branch passes
where it merges is.
- A red still standing at that point is unfinished work. It is not a red the order put there,
and it is cleared before the pull request is opened or the merge is made, never by reordering.
Which commands hold the suite to green belongs to the workflows convention.
The rest of the line: behavior, structure, addition
Splitting settles what each commit holds, not which one comes first. **The sequence is behavior
change, then structural change, then addition.**
- A change to how an existing rule behaves leads the branch, however small it is. One line
earns a commit of its own here. At the head it stands directly against the state it changed,
so a reviewer compares the two with nothing structural in between, and it reverts on its own
if the behavior turns out wrong.
- Structural change comes next — a section renamed, two of them folded into one, a module
moved. It carries the tree from one shape to another and claims no new ground.
- Addition comes last, into the shape that is settled by then.
What separates the three is nature, not size. A single line that changes what an existing
entry matches is a behavior change; a hundred lines of new entries are an addition. Ordering by
how much a commit touches buries the one risky line in the middle of the branch, which is the
one place it must not be.
An addition does not go inside a structural change. A new section is structure rather than
addition, so whatever belongs in it waits for a later commit. Filled as it is created, the
structural change comes apart around its contents, and a reader watches the same shape being
assembled twice.
Anchor dist to the repository root behavior
Move .env into a new Secrets section structure
Rename environment to Regenerable output and absorb Build output structure
Add coverage, tgz and eslintcache to Regenerable output addition
Add key and certificate patterns to Secrets addition
The first commit is one line of a .gitignore, and it leads because it is the only one that
changes what an existing entry matches. The two Add commits fill sections the two structural
commits put there, and they wait until both are in place.
A set of fields filled in one configuration file is ordered inside itself. The sequence
above ranks them all equally, because every one of them is an addition. Order them by what they
depend on instead: the identifier the rest follow from first, the fields derived from it next,
and the field nothing else decides last.
Fulfill name: in package.json the identifier
Fulfill repository:, bugs: and homepage: in package.json derived from it
Fulfill description: in package.json decided on its own
The derived fields travel together and the independent one does not. Three URLs naming one
repository are a single decision written as a list, which the one-line test lets through. A
description is a judgement that could be accepted while those URLs are rejected, so it takes a
commit of its own — and a subject reaching for an umbrella over all five, such as *fulfill the
placeholders*, is the "and" in disguise that the test turns away.
A test and the implementation it covers are not ordered by this sequence. The implementation
is the behavior change, so the sequence would lead with it, and the red-first rule above says
otherwise. That rule governs the pair; the sequence orders whatever else the line holds.
So work that also brings the existing tests up to convention lands in three commits, with the
behavior change last of the three:
Tidy up the existing test for <the class> structure
Update the test for <the class> addition
Update <the class> behavior
The middle commit is red where it sits, and that is what it is for — the claim stands there on
its own, and the commit after it is the one that makes the claim true.
Coherence bounds the sequence. Where this order would leave a commit referring to what is
not there yet, the seam is what is wrong, not the order — find the seam first, and sequence
what comes out of it.