Ctx task out

From ActiveMemory/ctx · View interactive version

Ctx task out is an AI agent skill from the GitHub repository ActiveMemory/ctx. Decompose a committed spec into a per-milestone implementation plan at specs/plans/<milestone>.md — data model, contracts, invariant-test matrix, and tasks with falsifiable acceptance criteria — that /ctx-implement consumes. Use after /ctx-spec when a spec is too large to implement in one session.

How to use this skill

Skill file

Canonical Chain

The project's design-to-implementation pipeline is:

/ctx-brainstorm → /ctx-plan → /ctx-spec → /ctx-task-out → /ctx-implement
    (vague)     (contested)  (committed)   (decomposed)     (execution)

/ctx-task-out is the fourth step. It consumes a committed spec

(--spec <path>) and produces the plan document that

/ctx-implement executes. It closes a gap the chain otherwise

leaves unowned: /ctx-plan explicitly disclaims implementation

planning, /ctx-spec commits the what/why at spec altitude, and

/ctx-implement opens with "use when you have a plan document" —

this skill is what produces that document.

Small specs skip this step. If the whole spec is implementable in

roughly one session, go straight to /ctx-implement with the spec

itself.

Role

You decompose; you do not redesign the bet. The spec is

committed; do not relitigate scope, behavior, or the bet here —

disagreements with the spec go back through /ctx-plan.

Implementation structure is different: choosing schema shapes,

signatures, and index strategies is exactly the job, because

resolving those decisions before execution is the point of

this skill. Make every task falsifiable and every design detail

the implementer needs explicit before execution starts, so no

large decision is made mid-flight.

Authority boundary: invariants, validation rules, and behavior

come from the spec. If decomposition surfaces an invariant the

spec never states, that is a spec gap — surface it and mark it

TBD; do not mint it here.

When to Use

exceeds ~one session of implementation

and carry no acceptance criteria

(redirect here first)

When NOT to Use

(see rolling-wave gate)

Usage

/ctx-task-out --spec specs/v1-substrate.md --milestone m0a
/ctx-task-out --spec specs/rss-feed.md        # single-milestone: whole spec

Without --milestone, the plan file takes the spec's basename:

specs/plans/rss-feed.md.

Preconditions (hard gates — refuse, do not degrade)

  1. Spec exists. If --spec is missing or the file is absent,

stop and report; no interactive fallback.

  1. Blocking-TBD gate. Enumerate the spec's Open Questions /

TBD entries and classify each as blocking or deferrable

for the target milestone. A TBD is blocking if any task in the

milestone would embed an assumption about its answer (language

choice, storage engine, schema format…). Refuse to decompose

past a blocking TBD: list the blockers, name who can resolve

them, and stop. Deferrable TBDs do not vanish: carry each into

the plan (Out of scope or Risks), annotated with the milestone

at which it becomes blocking. Resolving a blocking TBD is a

spec edit or a DECISIONS.md entry first; the plan only

points at that record. A resolution that exists nowhere but

the plan is minting.

  1. Rolling-wave gate. If a prior milestone's plan exists and

its DoD is not checked off, refuse to decompose the next

milestone. The user may override explicitly; log the

override in the plan's Amendments section. Tasking distant milestones

produces fiction — the current milestone's measurements are

allowed to reshape everything downstream.

Milestone boundaries belong to the spec. If decomposition shows

the cut is wrong — one "milestone" hiding several, or a boundary

in the wrong place — stop and route the resize through the spec;

do not mint sub-milestones here.

Process

  1. Detect mode. If the target plan file already exists, this

is an amendment run, not a fresh decomposition: read the

existing plan, classify the change as obsolete/append, re-run

only the blocking-TBD gate against the delta, and log the

change in the plan's Amendments section. The rolling-wave

gate does not fire when amending the current milestone.

Steps 1–8 below describe a fresh run.

  1. Read the spec in full. Read TASKS.md, DECISIONS.md, and

CONVENTIONS.md from the context directory.

  1. Run the blocking-TBD gate; surface the classification to the

user before proceeding.

  1. Draft the plan sections (structure below). Lift from the spec

verbatim where it speaks; where it is silent, prefer asking or

marking TBD over inventing — same authority discipline as

/ctx-spec --brief.

  1. Break down tasks: typically 15–40 per milestone. Each task

carries: id, a state cell (st, initialized [ ] — see the

ledger rule below), title, dependencies (by id), the files/paths it

is expected to touch, a [P] marker when

parallelizable with its siblings, a **falsifiable acceptance

criterion** (a command to run, a test that must pass, an

observable behavior), and a reference to the spec section it

implements. Size each task to roughly one commit — small

enough that a failed acceptance check localizes the fault to

that task. [P] is mechanical, not aspirational: no

dependency edge, no file touched by a sibling [P] task, no

shared sequence (e.g. migration numbers). File disjointness

is checkable from the files column — which is also how an

amendment run detects a new task colliding with one in

flight.

  1. Build the test matrix: every invariant, validation rule, and

edge case the milestone touches × the attempted violation × the

expected failure mode × the task id whose acceptance criterion

exercises it. A matrix row no task exercises is documentation,

not execution.

  1. Write specs/plans/<milestone>.md (create specs/plans/ if

absent).

  1. Sync anchors to TASKS.md: epic-level anchors only — one per

task cluster, each annotated Plan: specs/plans/<milestone>.md

with its task-id range. The clusters must partition the

plan's task ids: every id in exactly one epic, and the range

sizes must sum to the task count — state the arithmetic in the

plan; double-counted ids make the two surfaces irreconcilable.

State the completion rule where the anchors live: an epic is

checked [x] only when every task in its range is [x] or

[o] in the plan — the plan is the single source of truth for

milestone progress, TASKS.md epics are projections of it.

One-way sync, plan → TASKS.md. Never duplicate the full task

list into TASKS.md; never move or delete existing entries

(CONSTITUTION).

  1. Hand off: report blockers resolved/remaining and suggest

/ctx-implement against the plan.

Plan Document Structure

# <Milestone> Plan — <short name>

**Spec:** <path> · **Status:** Ready | Blocked
**Blocking TBDs resolved:** <list, with where each was decided>

## Scope & DoD          (lifted from the spec's milestone entry)
## Data model & storage (DDL, migrations, indexes)
## Contracts            (API signatures, schemas, CLI surface)
## Test matrix          (invariant × violation attempt × expected failure × task ref)
## Task breakdown       (table: id · st · task · deps · files · [P] · acceptance criterion · spec ref)
## Risks & measurement gates  (results that may reshape later tasks)
## Out of scope         (deferred to later milestones, with pointers)
## Amendments           (date · what · why — appended by amendment runs)

The plan is the execution ledger: the task table's st

column carries per-task state — [ ] pending, [x] done

(acceptance criterion demonstrably passed), [o] obsoleted by

amendment — Scope & DoD carries the DoD checkboxes, and

/ctx-implement updates both as it executes. A task table

without the st column is not a ledger: completion becomes

unrecordable and the milestone unauditable. DoD is

confirmed by measurement or by the user — never derived from

task completion — and the rolling-wave gate reads the DoD

checkboxes only. No other record of milestone progress exists.

Status: Blocked is reachable only by amendment: a fresh run

refuses instead of writing a Blocked plan; the status marks a

deferrable TBD that graduated to blocking mid-milestone.

Amendments (Mid-Milestone Changes)

Plans meet reality; the plan document owns that contact. When a

measurement gate fires or the implementer hits a wall:

reason; never deleted.

task has started — weakening the test until it passes is the

failure mode this rule exists to prevent. A criterion change

is a re-invocation of /ctx-task-out against the same

milestone: with the plan already present, the skill operates

in amendment mode — read the existing plan, apply the change

as obsolete-and-append, and log date · what · why in the

plan's Amendments section.

route through /ctx-plan; amendments cover implementation

reality, not the bet.

Quality Checklist

Before writing the file, verify:

"implement X" without a way to check it happened

matrix, and every matrix row is exercised by a task's

acceptance criterion (by id)

execution waves; [P] siblings share no files, edges, or

sequences

stateless table cannot be marked off or audited

epic; range sizes sum to the task count) and the completion

rule is stated alongside them

the plan and the spec can state the acceptance check for

any task without asking a question