Create work breakdown structure

From pjt222/agent-almanac · View interactive version

Create work breakdown structure is an AI agent skill from the GitHub repository pjt222/agent-almanac. Create a Work Breakdown Structure (WBS) and WBS Dictionary from project charter deliverables. Covers hierarchical decomposition, WBS coding, effort estimation, dependency identification, and critical path candidates. Use after a project charter is approved, when planning a classic or waterfall proje

How to use this skill

Skill file

Create a Work Breakdown Structure

Decompose scope → hierarchical work packages → estimate + assign + track. Foundation for effort + resource + schedule.

Use When

In

Do

Step 1: Extract Deliverables

Read charter. List deliverables + acceptance. Group → 3-7 top-level cats → WBS Level 1.

Got: L1 elements match charter deliverables.

If err: Charter vague → draft-project-charter to refine.

Step 2: Decompose → Work Packages

Each L1 → sub-elements (L2, L3). 100% rule: children = 100% parent scope. Stop when pkgs:

WBS outline:

# Work Breakdown Structure: [Project Name]
## Document ID: WBS-[PROJECT]-[YYYY]-[NNN]

### WBS Hierarchy

1. [Level 1: Deliverable Category A]
   1.1 [Level 2: Sub-deliverable]
      1.1.1 [Level 3: Work Package]
      1.1.2 [Level 3: Work Package]
   1.2 [Level 2: Sub-deliverable]
2. [Level 1: Deliverable Category B]
   2.1 [Level 2: Sub-deliverable]
3. [Level 1: Project Management]
   3.1 Planning
   3.2 Monitoring & Control
   3.3 Closure

Codes (1.1.1 fmt). Max 3-5 levels. Always include "Project Management" branch.

Got: Complete WBS, 15-50 pkgs, unique codes.

If err: >5 levels → scope too large → split sub-projects.

Step 3: WBS Dictionary

Each leaf → entry:

# WBS Dictionary: [Project Name]
## Document ID: WBS-DICT-[PROJECT]-[YYYY]-[NNN]

### WBS 1.1.1: [Work Package Name]
- **Description**: What this work package produces
- **Acceptance Criteria**: How to verify it's done
- **Responsible**: Person or role
- **Estimated Effort**: [T-shirt size or person-days]
- **Dependencies**: WBS codes this depends on
- **Assumptions**: Key assumptions for this work package

### WBS 1.1.2: [Work Package Name]
...

Got: Entry per leaf pkg.

If err: Missing entries → incomplete decomp → Step 2.

Step 4: Estimate

Per pkg, 1 method:

Summary:

## Effort Summary
| WBS Code | Work Package | Estimate | Method | Confidence |
|----------|-------------|----------|--------|------------|
| 1.1.1 | [Name] | 5 pd | person-days | High |
| 1.1.2 | [Name] | M | t-shirt | Medium |

Total = sum of all pkgs.

Got: Every pkg estimated + confidence.

If err: Low confidence >30% pkgs → SME refinement session.

Step 5: Deps + Critical Path

Map deps:

## Dependencies
| WBS Code | Depends On | Type | Notes |
|----------|-----------|------|-------|
| 1.2.1 | 1.1.1 | Finish-to-Start | Output of 1.1.1 is input to 1.2.1 |
| 2.1.1 | 1.1.2 | Finish-to-Start | |

Longest chain = critical path candidate.

Got: Dep table w/ FS relationships.

If err: Cycles → decomp errs → Step 2.

Step 6: Review + Baseline

Combine WBS + dict → final docs. Verify 100% rule every level. Stakeholder sign-off.

Got: WBS.md + WBS-DICTIONARY.md created + reviewed.

If err: Missing scope found → add pkgs + re-estimate.

Check

Traps

→

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.