Capacity planning

From Dadmin88/hermes-profile-packs · View interactive version

Capacity planning is an AI agent skill from the GitHub repository Dadmin88/hermes-profile-packs. Plan infrastructure capacity from measured demand, resource bottlenecks, growth, failure headroom, burst behavior, scaling latency, quotas, and overload policy.

How to use this skill

Skill file

Capacity Planning

Use when deciding how much compute, memory, storage, network, concurrency, or other runtime capacity a workload needs now and under credible growth or failure scenarios.

Procedure

  1. Define the workload unit and service objective: requests, jobs, sessions, agents, data volume, throughput, latency, or another quantity that maps demand to resource use.
  2. Establish a measured baseline under representative load. Record resource consumption, utilization distribution, queueing, latency, errors, and the first resource that saturates.
  3. Separate steady demand, predictable peaks, burst traffic, batch work, and background load. Use percentiles or distributions when averages hide the real peak.
  4. Model growth using explicit assumptions and a time horizon. Keep business-growth assumptions separate from technical resource-per-unit measurements so either can be revised.
  5. Include failure headroom. Determine whether remaining capacity can serve the required load when an instance, node, zone, dependency, or other designed failure domain is unavailable.
  6. Include scaling latency and constraints: startup/provisioning time, image/model/data warmup, connection limits, quotas, storage expansion, scheduler or placement delay, and maximum practical parallelism.
  7. Define overload behavior before capacity is exhausted: admission control, queue limits, backpressure, degraded features, priority classes, rate limits, shedding, or delayed work as appropriate.
  8. Set capacity thresholds and forecasting signals that trigger review or scaling before emergency saturation.
  9. Revalidate after architecture, workload mix, software efficiency, pricing, or failure assumptions change materially.

Decision rules

Quality gate

The plan is ready when demand maps to measured resource use, credible peaks and failures fit within explicit headroom or degradation policy, scaling constraints are included, overload behavior is defined, and the assumptions can be updated from new measurements.