Executive Producer Sendback
Use When
- A short is being made through several stages and quality keeps failing
at the handoffs.
- The run needs one stateful reviewer rather than blind stage chaining.
- A downstream discovery can invalidate upstream work:
duration, style drift, missing assets, bad sync, or budget pressure.
Core Rule
- Treat the pipeline as a gated review loop, not a conveyor belt.
- If later evidence proves an earlier decision wrong, send the work
back instead of patching around the mistake.
Inputs
- ordered stage list
- stage artifacts and review criteria
- cumulative state:
budget, duration target, revision counts, style anchors, prior issues
Outputs
- per-stage gate decision:
pass, revise, or send_back
- updated cumulative state
- issue log with explicit reason for every send-back or forced pass
Workflow
- Carry one cumulative state object through the whole run.
- After each stage, review both the new artifact and its fit with prior
stages.
- Pass clean work forward.
- Revise a stage when the fix is local to that stage.
- Send work back to an earlier stage when the new evidence breaks an
upstream assumption.
Good Send-Back Cases
- narration comes back materially longer than the planned scene
- asset generation reveals the scene plan is infeasible
- final sync check shows narration is riding over the wrong visuals
- style consistency fails because earlier scene planning was too loose
Guardrails
- cap revision attempts so the run cannot loop forever
- record what triggered the send-back
- invalidate downstream artifacts that depended on the bad upstream
decision
- do not "pass with vibes" just to keep the pipeline moving
Bad Pattern
- letting every stage succeed independently while the finished short is
obviously off
- fixing duration overruns only in the final edit
- hiding upstream planning mistakes inside last-minute compose tweaks
- losing the audit trail of why a stage was rerun