tech-debt-tracker
Turn vague "this is messy" complaints into a ranked debt ledger
with carrying-cost estimates and a repayment plan the team can
execute. Frames debt as principal (the gap) plus interest
(what we keep paying because the gap exists). Output is copy-paste
ready; ticket / backlog write-back is user-gated.
When to use
- The user lists code smells, dead code, or "we should refactor X"
and wants them turned into trackable items.
- A retro surfaced multiple debt complaints; the team needs them
ranked, not all addressed at once.
- A new initiative is about to add features on top of debt; the
team wants the carrying cost surfaced before committing.
- German triggers: "Tech-Debt-Liste", "wo bremst es uns?",
"Aufräumen-Plan".
Do NOT use when:
- The user wants a single bug fixed — route to
/bug-fix. - The complaint is about process, not code (slow CI, noisy alerts) —
surface as ops debt, not code debt; consider escalating to PO.
- The "debt" is actually a missing feature — route to
po-discovery.
Procedure
1. Inspect inputs and collect candidate debt items
Read the input (retro notes, code-review threads, pasted complaints,
agent observations). Analyze each source for one candidate per
bullet, no editing yet.
2. Classify each item
| Class | Examples |
|---|---|
| Code debt | Smells, duplication, dead code, weak tests, missing types |
| Architecture debt | Coupling, layer violations, missing seams |
| Operations debt | Manual deploys, alert fatigue, runbook gaps |
| Knowledge debt | Stale docs, single-owner systems, missing onboarding |
Items spanning two classes split into two entries — never merge.
3. Estimate principal and interest
For each item:
- Principal — rough effort to repay (S / M / L; days, not hours).
- Interest — what we keep paying every week / sprint / month
because the debt exists. Quantify or mark unknown (unknown
interest is itself a finding — surface it).
Carrying cost = interest × time-until-repaid. High principal +
zero interest → leave it. Low principal + recurring interest →
top of the queue.
4. Rank by `interest ÷ principal`
Sort descending. The top ten are the candidates. Items below the
top ten get a single line each (so they are not lost) but no
deeper analysis — debt-list bloat is itself a debt.
5. Shape a repayment plan
For the top 3-5 items:
- Repayment shape — single PR · multi-PR series · campaign ·
re-architecture.
- Owner role — engineering · ops · PO · platform team.
- Trigger — what makes us pay this next (e.g. "before adding
feature X", "when test runtime > 10 min", "next quarterly").
Items without a trigger sit forever. A trigger that is "someday"
is no trigger — push back.
6. Issue a verdict
| Verdict | When to issue |
|---|---|
| track | Items added to the ledger; no immediate action |
| pay-now | One or more items have a trigger that already fired |
| block | New feature work blocked until top item is repaid (rare) |
7. Validate the ledger
Verify before emitting: every top item has a class, principal,
interest (or unknown), trigger, and owner; the ranking matches
interest ÷ principal; tail items have one line each. Ensure no
"someday" triggers and no agent-owned repayment owners slipped in.
Output format
The ledger is a single block with these ordered fields:
Inventory:— count and classes touchedTop items:— numbered list ranked byinterest ÷ principal,
each with class, principal, interest, trigger, owner, shape
Tail:— one-line bullets for tracked-but-deferred itemsVerdict:— exactly one oftrack/pay-now/blockNext:— handoff target (/adr-createor backlog write-back)
Tech-Debt Ledger
Inventory: <count> items, <classes touched>
Top items (interest ÷ principal):
1. [arch] <item> Principal: M Interest: high (3 hrs/sprint)
Trigger: <condition> Owner: <role> Shape: <PR / series / campaign>
2. [code] <item> Principal: S Interest: med ...
...
Tail (tracked, no immediate action):
- <item>
- <item>
Verdict: track | pay-now | block
Next: /adr-create (if a tradeoff lock is needed) | backlog write-back
Gotcha
- "Refactor X" is not a debt item — it is a wish. The item must
name the gap and what it costs.
- Interest the team cannot measure is real but invisible. Mark
unknown and ask a probe ("how often do you hit this?") rather
than inventing a number.
- A debt list with no trigger is paperwork. Reject items the team
has no plan to ever repay.
Do NOT
- Do NOT enumerate every smell in the codebase — the top ten plus
a tail is the contract.
- Do NOT propose repayment owners the agent itself owns; debt
repayment belongs to a human role.
- Do NOT push items into Jira / Linear without explicit ask;
output is copy-paste ready, write-back is gated.
- Do NOT silently inflate principal estimates to discourage repayment
the team should do.