gtm-launch
When to use
- A product, feature, or major capability is approaching ship-readiness and the team needs a wave plan (alpha → beta → GA) keyed to audience and proof, not a date on a calendar.
- A launch is being planned date-first; the team needs to invert and plan readiness-first so an unmet gate stops a wave instead of leaking past it.
- A previous launch landed soft and the retro names "no audience-by-wave logic" or "narrative beats unclear per wave" as the cause.
Do NOT use to write announcement copy (route to release-comms),
lock the message stack (route to messaging-architecture), or plan
post-launch retention loops (route to retention-loops).
Cognition cluster
- Mental model 10 — Reversible vs. irreversible decisions. A GA
wave is largely irreversible: rolling back narrative and audience
expectations after public launch costs more than re-shipping the
product. Alpha and beta are reversible; treat them as the
decision-quality buffer. See