LT Sprint Orchestrator
Run the sprint to a clock. Optimize for a complete, demonstrable bundle rather than depth in any one artifact.
Preflight
Finish these checks before starting the public clock:
- Confirm Xcode,
xcodegen,xcrun simctl,ffmpeg, and ImageMagick. - Confirm one booted iPhone Simulator and record its UDID.
- Confirm the fallback requirements, Design output, and buildable repository.
- Confirm
security-guidance@claude-plugins-officialis enabled. - Confirm all required permissions and first-run dialogs have already been handled.
- Confirm a deterministic demo reset or launch argument for stateful apps. Never consume a once-per-day or one-shot happy path during rehearsal without a reset.
- Define the Xcode project, scheme, Simulator device/OS, bundle ID, and the exact build/test command.
- Create
deliverables/status.loganddeliverables/run-log.md.
If any preflight check fails, fix it before the talk or explicitly mark the fallback.
Run the 50-minute clock
Follow references/timeline.md. Keep one visible lane status:
A APP requirements → Design → handoff → build → Simulator
B LAUNCH LP | ASO | promo video
C PROOF screenshots | privacy/security
Append each transition and completion to deliverables/status.log as:
[mm:ss] LANE STATUS artifact-or-blocker
Use terminal-notifier when available for lane completion. Never wait silently for a build.
Apply the scope lock
At minute 8, freeze:
- one persona and one job-to-be-done;
- no more than three screens;
- one local persistence record/primitive at most; the record may contain only the minimum fields required to implement the frozen rules;
- no login, network, payment, authentication, or external SDK;
- one visual direction;
- one primary success metric.
After the lock, accept only bug fixes or removals. Treat additions as post-demo backlog.
Apply fallback gates
- By minute 8: if requirements are not frozen, use the fallback requirements.
- By minute 20: if Design has no usable handoff, use the fallback Design bundle.
- By minute 28: if the project has not completed one build, switch to the fallback repository.
- From minute 20: start the pattern-based privacy/security scan in the background; finalize it after the build.
- Between minutes 38 and 43: capture real screenshot candidates while testing the Simulator path.
- By minute 43: if real screenshot candidates are unavailable, use Design exports and label them as prototype images.
- By minute 46: if promo rendering is not complete, show the storyboard and pre-rendered fallback.
Stop or isolate the superseded live job before switching to a fallback so a late result cannot overwrite the chosen artifact. Record every fallback decision in deliverables/run-log.md; do not conceal it.
Completion contract
Finish only when these paths exist and are readable:
- buildable iOS project;
deliverables/requirements.md;deliverables/design-handoff.md;deliverables/lp/;deliverables/aso.md;deliverables/screenshots/;deliverables/promo/<app-slug>-promo.mp4;deliverables/privacy-report.md;deliverables/run-log.md.
Summarize actual duration, fallbacks, and remaining risks at the end.