Success plan builder

From t0ddc3by/claude-for-customer-success · View interactive version

Success plan builder is an AI agent skill from the GitHub repository t0ddc3by/claude-for-customer-success. Build or update a customer success plan — account-specific success criteria, measurable milestones, engagement cadence, and mutual commitments. Use at kickoff for new accounts, when success criteria have drifted, or when an account needs a plan reset. Produces a co-authored document, not a CSM inter

How to use this skill

Skill file

/success-plan-builder

[PROPOSED]

Use When

Upstream dependency: Before building a success plan for a new engagement, define the 3–5 success criteria that form the plan's foundation using the Onboarding plugin's success-criteria skill (if the onboarding plugin is installed, run /onboarding:success-criteria).

Do NOT Use For

Typical Activation

"/csm:success-plan-builder Acme Corp"

"/csm:success-plan-builder Acme Corp --update"

"/csm:success-plan-builder Acme Corp --review"

"Build a success plan for [account]" (free-form narrative, no OCV canvas required)

"Update the success plan for [customer]"


Build a success plan that the customer will actually sign off on — account-specific

success criteria, measurable milestones, joint ownership, and a cadence that

reflects your configured CS motion.


Pre-flight

Read ~/.claude/plugins/config/claude-for-customer-success/csm/CLAUDE.md and

~/.claude/plugins/config/claude-for-customer-success/company-profile.md.

If either is missing or contains [PLACEHOLDER] markers, stop and prompt for

/csm:cold-start-interview.

Note from config:

G-code dependency: All G-code guardrails referenced in this skill (G1–G9) are defined in the CLAUDE.md config loaded above. If Pre-flight halts or config is missing, G-codes are undefined — do not proceed with partial config.


Reasoning Protocol

Before generating output, apply these primers:

  1. CLASSIFY: What type of success plan request is this?
  1. CONSTRAINTS: What limits the solution space?
  1. EXPERT CHECK: What would a veteran CSM verify first?
  1. ANTI-PATTERNS: Common mistakes to avoid:

After execution, verify:

For complex scenarios, load additional reasoning:

Mode

--new: Build a success plan from scratch for a new or recently kicked-off account.

--reset: Rebuild success criteria for an existing account where the original

plan has drifted, criteria were never properly established, or account context

has materially changed (new sponsor, new use case, new segment).

--review: User provides an existing success plan; skill reviews it for

completeness, specificity, and whether criteria are actually measurable. Returns

specific edits.

Default: prompt once — "Is this a new plan or an update to an existing one?"


Data gathering

Connector error categorization: When a connector call fails, distinguish the error type before proceeding:

Do not conflate these — a rate-limited connector will return data shortly; an unavailable connector will not.

What's needed before building:

  1. Account goals — what the customer said they wanted to accomplish

(from kickoff notes, sales handoff notes, or user-provided context)

  1. Product context — which features / modules are in scope for this account
  1. Stakeholder context — who owns success on the customer side; who measures it
  1. Timelines — contract duration, key milestones already committed, renewal date
  1. Existing success criteria — if a plan exists, pull it before rebuilding

Pull from connected sources where available:

Minimum viable prompt if nothing is connected:

"To build a success plan that the customer will actually own, I need the customer's

stated goals. What did they tell you — during the sales process or kickoff — that

they want to accomplish with [product]? Paste notes, a handoff doc, or a

quote if you have one."

Do not build a generic success plan from product features alone. Success criteria

must come from the customer's stated business outcomes, not assumed use cases.


Success plan structure


[Account Name] — Customer Success Plan

[Quarter / date range]

Prepared jointly by: [CSM name], [Company] · [Customer sponsor name], [Account]


1. About this plan

One paragraph. Plain language. Why this document exists and how it will be used.

"This success plan captures what [Account] is trying to accomplish with [product],

the milestones we'll use to measure progress, and the commitments both teams are

making to get there. We'll review it at each [cadence per CS motion: monthly /

quarterly] check-in and update it as priorities shift."


2. Your goals

The customer's goals in their language — not product feature descriptions.

Business goal [1]: [What the customer said they want to achieve]

Why it matters: [Business context — e.g., "the team is scaling from 50 to 200

users and needs faster onboarding" — not assumed]

Business goal [2]: [...]

Do not translate customer goals into product language here. Keep the customer's

framing. Translation to product features happens in Section 3.

If goals are unclear or unstated: flag in the reviewer note and add a [review]

marker — "Customer's stated goals not confirmed. Review with sponsor before plan

is finalized."


3. Success criteria

For each business goal, define one or more observable, measurable criteria.

Apply configured success criteria model:

Success criterion format:

[Criterion name]

- Measure: [Specific metric — e.g., "% of licensed users who complete first workflow within 30 days of license activation"]

- Baseline: [Where the account is today, if known]

- Target: [The agreed number or milestone — e.g., ">70% within 90 days"]

- Evidence source: [Where this will be measured — CS Platform / product analytics / customer-reported]

- Review cadence: [When this will be checked — e.g., "monthly at check-in"]

Criteria that cannot be measured get a [review] flag: "This criterion as stated

is not measurable — agree on a specific metric with the customer before finalizing."

Primary value metric: [Configured primary value metric from company profile]

— this should appear as one of the success criteria or as an explicit success

criterion overlay.


4. Milestones

Time-bound markers that show the account is on track. Not a task list — milestones

mark when something meaningful has been accomplished.

| Milestone | Description | Target date | Owner | Health signal if missed |

|-----------|-------------|------------|-------|------------------------|

| M1 | [First meaningful event — e.g., "All users activated and first workflow completed"] | [Date] | [Customer / CSM / Joint] | [Flag if missed by [date+buffer]] |

| M2 | [Second milestone] | | | |

| M3 | [First value milestone — primary value metric achieved] | [Date — ideally within configured TtV target] | | |

| M4 | [Adoption milestone — criteria threshold reached] | | | |

| M5 | [Renewal-ready milestone — all success criteria at target] | [Date before renewal] | | |

Milestones are co-owned — mark the owner. A milestone owned entirely by the CSM

is an internal commitment, not a joint one.


5. Engagement cadence

What the customer can expect — and what's expected of them.

| Touchpoint | Frequency | Format | Attendees | Purpose |

|-----------|-----------|--------|-----------|---------|

| Check-in call | [Monthly / quarterly — per CS motion] | [Video call / async update] | [CSM + customer sponsor] | [Progress review, issue triage] |

| QBR | Quarterly | [60-min video] | [CSM + AE + exec sponsor] | [Value review, next-quarter alignment] |

| Health review | [As needed / triggered by health signal] | [Email or call] | [CSM] | [Risk identification] |

| Executive sponsor call | [Semi-annually or as needed] | [30-min video] | [CS lead + exec sponsor] | [Strategic alignment] |

Calibrate frequency to configured CS motion:


6. Mutual commitments

What each party commits to. Both sides have responsibilities — a plan that only

lists CSM commitments is not a mutual plan.

[Company] commits to:

[Account name] commits to:

If mutual commitments section is left to generic placeholders, flag [review] —

a plan without customer commitments isn't co-owned.


7. How to reach us

| Need | Contact | Channel | Response time |

|------|---------|---------|--------------|

| Day-to-day | [CSM name] | [email / Slack] | [1 business day] |

| Urgent | [Support] | [channel] | [per SLA] |

| Escalation | [CS lead or VP] | [email] | [per escalation matrix] |


8. Plan history

| Date | Change | Updated by |

|------|--------|-----------|

| [Date] | Initial plan created | [CSM name] |


Review mode (`--review`)

When reviewing a submitted success plan, check:

Return specific edits with section references.


Reviewer note (internal)

⚠️ Reviewer note

- Sources: [Customer goals: [source] | CRM ✓ live | CRM [configured but unverified] | Document: [doc name, date] | user-provided | not connected — conversation context only]

- Success criteria source: [Account-specific from [source] | configured standard template — customize before finalizing]

- Data as of: [timestamp]

- Flagged for your judgment: [N items marked [review] inline | none]

- Before sending: Verify customer has reviewed and agreed to the success criteria in Section 3 before treating this as a mutual plan. Success criteria agreed verbally but not in writing are flagged [review].


Output

Success plan document — format driven by --draft (default) or --review flag.

Draft mode produces a full structured plan with goals, milestones, metrics, and

owner assignments. Review mode produces a gap analysis against an existing plan.

See Success plan structure section for field-level detail.

Guardrails

No invented goals. Do not infer success criteria from product features or

industry benchmarks. Criteria come from stated customer goals. If goals are

unknown, the reviewer note says so explicitly and the plan is marked [DRAFT].

Co-authorship is the goal. A plan the customer never saw is an internal CSM

document. The plan is not finalized until the customer sponsor has reviewed and

agreed to the success criteria.

Quiet mode. The customer-facing plan contains no internal health scores,

no expansion signal tags, no escalation routing. Those stay in the reviewer note.

Renewal language. If the plan covers a period that includes the renewal window,

do not include language that implies renewal likelihood — flag for reviewer

validation before sharing with leadership or finance.

Primary value metric. The configured primary value metric from the company

profile must be traceable in the success criteria. If it's absent, flag it.


After the plan

I can prepare talking points. /csm:call-prep [account] kickoff"

when you reach M5."


Reference Files

The following reference files govern this skill's detailed behavior. They are loaded on-demand when the relevant behavior is being applied — they are not front-loaded into every response.

| File | Purpose |

|------|---------|

| references/reasoning-blueprint.md | Problem classification taxonomy, domain heuristics, common failure modes, and expert judgment patterns for this skill |


Security & Permissions

Trust & Verification

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.