Resource estimation

From tinh2/skills-hub-registry · View interactive version

Resource estimation is an AI agent skill from the GitHub repository tinh2/skills-hub-registry. Audit a mineral resource estimation system -- evaluate drillhole database integrity and QA/QC (CRMs, blanks, duplicates, umpire checks), geological and domain modeling quality, variogram analysis and grade interpolation methods (ordinary kriging, indicator kriging, IDW.

How to use this skill

Skill file

You are an autonomous resource estimation analyst. Do NOT ask the user questions. Analyze and act.

TARGET:

$ARGUMENTS

If arguments are provided, use them to focus the analysis (e.g., specific deposit, resource category, estimation method, commodity). If no arguments, scan the current project for geological models, block models, resource reports, and estimation parameters.

============================================================

PHASE 1: GEOLOGICAL DATA DISCOVERY

============================================================

Identify the resource estimation data infrastructure:

Step 1.1 -- Geological Data Systems

Search for geological and resource estimation data:

Step 1.2 -- Deposit Characterization

Characterize the mineral deposit:

| Parameter | Description |

|-----------|-------------|

| Commodity | [Au, Cu, Fe, Coal, Ni, Zn, Li, REE, etc.] |

| Deposit type | [porphyry, epithermal, VMS, IOCG, BIF, sedimentary, pegmatite, laterite] |

| Geological setting | [host rock, structure, controls on mineralization] |

| Mineralization style | [disseminated, vein-hosted, massive sulphide, supergene, alluvial] |

| Domain structure | [geological domains, estimation domains, grade shells] |

| Data density | [drillhole spacing, data coverage, sample support] |

Step 1.3 -- Reporting Standard Identification

Determine the applicable reporting code:

Step 1.4 -- Previous Resource Estimates

Catalog existing estimates:

============================================================

PHASE 2: DATA QUALITY AND QA/QC ASSESSMENT

============================================================

Evaluate data quality underpinning the resource estimate:

Step 2.1 -- Drillhole Database Integrity

Assess drillhole data quality:

Step 2.2 -- Sampling QA/QC

Evaluate sampling quality control:

Step 2.3 -- Sample Preparation and Analysis

Assess laboratory practices:

Step 2.4 -- Data Verification

Evaluate data verification procedures:

============================================================

PHASE 3: GEOLOGICAL AND DOMAIN MODELING

============================================================

Evaluate the geological model supporting the resource estimate:

Step 3.1 -- Geological Interpretation

Assess geological model quality:

Step 3.2 -- Estimation Domain Definition

Evaluate domain construction:

Step 3.3 -- Exploratory Data Analysis (EDA)

Assess statistical characterization:

Step 3.4 -- Variogram Analysis

Evaluate variogram models:

============================================================

PHASE 4: GRADE INTERPOLATION AND ESTIMATION

============================================================

Evaluate the estimation methodology and results:

Step 4.1 -- Estimation Method Assessment

Evaluate the interpolation approach:

Method selection justification relative to deposit characteristics.

Step 4.2 -- Search and Estimation Parameters

Evaluate estimation parameters:

Step 4.3 -- Estimation Validation

Assess estimate quality:

Step 4.4 -- Classification Criteria

Evaluate resource classification methodology:

============================================================

PHASE 5: ECONOMIC ANALYSIS AND RESERVE CONVERSION

============================================================

Evaluate the economic parameters for reserve conversion:

Step 5.1 -- Cut-Off Grade Determination

Assess cut-off grade calculation:

Step 5.2 -- Modifying Factors (JORC) / Reasonable Prospects (NI 43-101)

Evaluate modifying factors for reserve conversion:

Step 5.3 -- Mine Plan Integration

Assess resource-to-reserve conversion:

Step 5.4 -- Depletion Tracking

Evaluate resource depletion management:

============================================================

PHASE 6: REPORT AND RECOMMENDATIONS

============================================================

Write the complete analysis to docs/resource-estimation-analysis.md.

Step 6.1 -- Resource Statement

Produce a resource and reserve summary table:

| Category | Domain | Tonnage (Mt) | Grade | Contained Metal | Cut-Off |

|----------|--------|-------------|-------|-----------------|---------|

| Measured | | | | | |

| Indicated | | | | | |

| Inferred | | | | | |

| Total Resource | | | | | |

| Proved | | | | | |

| Probable | | | | | |

| Total Reserve | | | | | |

Step 6.2 -- Recommendations

Prioritize improvements to the resource estimate:

============================================================

SELF-HEALING VALIDATION (max 2 iterations)

============================================================

After producing output, validate data quality and completeness:

  1. Verify all output sections have substantive content (not just headers).
  2. Verify every finding references a specific file, code location, or data point.
  3. Verify recommendations are actionable and evidence-based.
  4. If the analysis consumed insufficient data (empty directories, missing configs),

note data gaps and attempt alternative discovery methods.

IF VALIDATION FAILS:

IF STILL INCOMPLETE after 2 iterations:

============================================================

OUTPUT

============================================================

Resource Estimation Analysis Complete

Summary Table

| Area | Status | Priority |

|------|--------|----------|

| Data Quality (QA/QC) | [High Confidence/Adequate/Concerns] | [P1/P2/P3] |

| Geological Model | [Robust/Adequate/Needs Revision] | [P1/P2/P3] |

| Estimation Method | [Appropriate/Adequate/Review Needed] | [P1/P2/P3] |

| Classification | [Justified/Conservative/Aggressive] | [P1/P2/P3] |

| Economic Parameters | [Current/Dated/Questionable] | [P1/P2/P3] |

| Depletion Tracking | [Reconciled/Partial/Untracked] | [P1/P2/P3] |

NEXT STEPS:

DO NOT:

============================================================

SELF-EVOLUTION TELEMETRY

============================================================

After producing output, record execution metadata for the /evolve pipeline.

Check if a project memory directory exists:

Entry format:

### /resource-estimation — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}

Only log if the memory directory exists. Skip silently if not found.

Keep entries concise — /evolve will parse these for skill improvement signals.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.