Weekly review
Facilitate the user's GTD weekly review over the Org files and Google Calendar.
This skill is only the review flow — defer every Org mechanic (states, tags,
project health, completing/archiving, resolving @waitingfor, recording) to
gtd. Invoke Skill(gtd) first and follow its conventions; allowed-tools
lists every org-mcp operation and gcalcli command this flow calls directly
because gtd carries no allowed-tools of its own.
The user asserts two preconditions: the inbox is already processed and "empty
your head" is done. Where stray items surface at any point, run
Skill(process-inbox) on each.
Discover at runtime, never hardcode. At the start, read the file set
(org-get-allowed-files), contexts (org-get-tag-config), states
(org-get-todo-config), and the review's agenda views (org-get-agenda-config).
Resolve each review list below to a dispatch key by the command's description,
not a fixed letter — the keys are the user's and may change.
Interaction. Work one section at a time: enumerate, present findings, state
your reading and ask the user to confirm (prefer AskUserQuestion over open
questions), apply the agreed edits via gtd, then move on. Keep a running list
of every change for the close. A long list may be presented in batches for
pacing, but review every item — batching never means dropping or summarizing
items away.
<!-- Keep in sync with process-inbox's Always-confirm rule: the always-confirm
core (state and confirm every chosen context before recording, not only when
unsure) is shared. This copy deliberately broadens the trigger to "or changes"
(step-6 context edits) and names the resource/precedent gloss. -->
Always-confirm rule. Whenever this flow or a gtd procedure it invokes
chooses or changes an action's self-context — e.g. the **Project health
check's new next action, Promoting a someday/maybe item**'s tag fixup, or a
step-6 context fix — apply gtd's Choosing the context procedure (the
resource-required rule and the precedent check). Per process-inbox's rule of
the same name, state your reading and confirm the context with the user before
recording, not only when unsure — a context the user already specified is
recorded as given (per gtd).
Setup — anchor the look-back window. Find the weekly-review tracking habit
(org-grep "weekly review", or the tracking-habit entry the Agenda view
surfaces) and read its last-completion date from :LAST_REPEAT: or the
newest DONE logbook entry (via its uri). The calendar look-back start is
that date minus 14 days, so the window always overlaps the previous review.
$ARGUMENTS, if given, overrides the start date; with no last-completion found,
default to 14 days ago. However overdue the review, cover the entire window
in full — a long gap is never a reason to summarize or skip.
Then run the ten steps in order.
1. Inbox
The user asserts the inbox is already processed. Verify quickly with
org-read-outline, drilling in with org-read-headline or org-grep if a
heading needs a closer look; if anything remains, run Skill(process-inbox) on
each item.
2. Recent calendar
gcalcli agenda <look-back-start> <today>. Review every past event in the window
for a commitment that slipped — an unfinished follow-up, an implied action,
something to carry forward. For each, decide with the user: reschedule it
(gcalcli add, per process-inbox's Google Calendar invocation, including
--noprompt), turn it into a next action or project (via gtd), re-capture it
and run process-inbox, or dismiss it. Before proposing that an event become a
next action or project, run the Related-item cross-check so you neither
duplicate an existing item nor ask the user cold.
Related-item cross-check. Look for an existing item related to the event — a
next action, a delegation, or a project, in any open state (TODO/WAIT) —
before proposing a new one. Fetch the Agenda view and Projects view once per
step and reuse them across every event this step loops over — only org-grep,
re-run per event, needs same-pass freshness. The Agenda view is one composite
call whose single response already carries both its week block (open
SCHEDULED/DEADLINE items)
and its Waiting-for items and per-context blocks; those tag-based blocks list
only TODO, undated items (per gtd's States), so they — not org-grep — are
the primary source for a TODO, undated @waitingfor/context action: scan them
first. Neither a WAIT-parked delegation/context action nor a pre-existing
project ever appears on any of the Agenda view's tag-based blocks, though —
the former because those blocks are TODO-only, the latter because each block
is scoped to a context or @waitingfor tag while a project heading is not
expected to also carry a context or @waitingfor tag. A dated WAIT action
or a dated project surfaces on the week block instead (per gtd's States) —
scan it too, for a WAIT-state match or a matching project title. So, once the
tag-based blocks and week block have turned up no match, for the project gap
also consult the Projects view's headings by title (a project-only
duplicate check — not step 5's review); for either gap, org-grep a
distinctive term from the event (a person, vendor, or thing) — one
literal-substring search that, filtering on neither tag nor state, surfaces
whichever kind is actually there; the title check also misses a WAIT-parked
or incubated project outright (step 5's state-based reason or the
somedaymaybe exclusion, not wording), otherwise both
checks can still miss on wording, so a miss is inconclusive — lean on user
confirmation rather than assume absence (an org-grep miss especially proves
nothing, for either gap: it is a literal substring search, per gtd's **Work
triggers**). Before treating
any candidate as coverage, validate it as process-inbox does: consider only
open-state (TODO/WAIT) matches, apply its Somedaymaybe-membership check
(a match incubated under a someday/maybe container is not live coverage), and
route a WAIT match through its Parked-entry check (surfacing the match's
blocked status and offering to unblock it — coverage still holds, per
process-inbox's Confirmed active match treatment). State your reading
against what survives.
3. Upcoming month
gcalcli agenda <today> <today+1month>. For each upcoming commitment, first run
the Related-item cross-check, extending its week-block search across the
month: the Agenda view's week block always anchors on today and reaches only
~7 days out (a custom-command view ignores any date argument), so also run the
built-in week span (org-get-agenda) at +7d, +14d, +21d, +28d — day
offsets, since a whole-month offset can overflow a short month — to cover open
SCHEDULED/DEADLINE items through the full window, fetched once per step
like the base cross-check's own fetches; the undated-item and project checks
are not date-scoped and already cover the month unchanged. Then decide with
the user whether it needs preparation recorded now (a next action or project,
via gtd) or is already covered.
4. Empty your head
The user asserts this is done. Stop here and wait. The user may issue
/process-inbox for any incompletion triggers that came to mind, or tell you to
proceed. Do not advance to step 5 on your own.
5. Projects
Run the Projects view (org-get-agenda with the resolved key); it lists the
project headings. For each project:
- Read its subtree via the node's
uri(pergtd's reading guidance) to see
its actions and any nested sub-projects.
- Outcome defined? Confirm the project states a clear desired outcome /
done-state. If it is vague, work it out with the user and record it
(org-edit-body).
- Next action present? Apply
gtd's Project health check to ensure the
project has a good next action.
- Review nested sub-projects too — each is itself a
project-taggedTODO
that surfaces on its own in this view, independent of any ancestor's health
check — plus outer ancestors and deliberately-parked (all-WAIT)
projects, the two cases gtd's health check explicitly defers to the weekly
review.
- Sweep the subtree for a
somedaymaybe-tagged heading below the project (an
in-project incubation pocket) or an open child carrying a local somedaymaybe
tag — shapes no agenda view enumerates (per gtd's Incubation check).
Normalize each with the user per gtd's Tags and structure: refile its open
contents under the file's Someday/maybe container to keep them incubating,
promote them (per gtd's Promoting a someday/maybe item), or
KILL + archive.
Parked/dated cross-check (steps 5–7, each on its step's tag — one tag for
steps 5 and 7, each of the user's execution contexts for step 6): these
views match only open TODO items, so an item parked in WAIT, or carrying a
SCHEDULED/DEADLINE, is off the view (per gtd's States); cross-check with
org-grep on the step's tag in its colon-wrapped raw form (:project:,
:@waitingfor: — org-grep is a literal substring search, so the bare word
floods with prose matches), reviewing any WAIT or dated open item it
surfaces — and any open item whose own tags carry somedaymaybe with no
someday/maybe-container ancestor (a stray local tag parks it off every active
view; normalize with the user per gtd's Tags and structure: refile it under
the container to keep it incubating, or shed the tag / promote it if active) —
skipping undated incubated ones under a file's someday/maybe container (step
9's territory). For this step the tag is project — it is the project
heading's own state or date that takes it off the view.
6. Non-project next actions
Run the non-project next-actions view. For each standalone action, confirm with
the user: still relevant? right context? still the true next physical action?
Judge "right context?" per gtd's Choosing the context (by the resource the
action requires — an online step in otherwise-local work, such as a push,
review, or CI, makes it an online action — and its precedent check), then
confirm per the Always-confirm rule above. Reschedule, change state,
complete, or kill it via gtd, or edit its title or context tag with
org-edit-headline (to fix a wrong context, remove the old context tag and add
the new one in one call — they are a mutually-exclusive group).
Apply the Parked/dated cross-check on each of the user's execution
contexts (per gtd's _Tags and structure_ — the mutually-exclusive context
group from org-get-tag-config, minus @waitingfor and @checklist), so no
context's parked/dated items are skipped.
7. Waiting-for
Run the Agenda view and take its Waiting-for items block. For each delegated
item, check how long it has been outstanding (read its logbook via the uri) and
decide with the user whether it needs a ping. Handle a ping like any other action
— it may be a quick do-it-now or a recorded follow-up; leave the mechanics to
gtd / process-inbox. Resolve any item that has completed or died via gtd's
Resolving a delegated item (@waitingfor).
Apply the Parked/dated cross-check on the @waitingfor tag.
8. Checklist triggers
Enumerate the triggers per gtd's Work triggers (which resolves the
Checklists view and drops retired triggers). For each, ask the user whether its
condition currently applies (upcoming travel, a purchase, a release, …), and
whether they still want the rule at all. For each firing trigger, act on its
"then Y" — capture the resulting items and run process-inbox, or record them
via gtd — then apply gtd's Work triggers retirement rule (it retires a
spent fired one-time trigger and keeps a recurring one for future
firings). Also apply that rule to any trigger whose condition can no longer
occur, or that the user no longer wants (it retires, whether or not it ever
fired). Retire per that rule rather than leaving a spent, dead, or unwanted
trigger to resurface every review.
9. Someday/maybe
Run the Someday/maybe view. Review every item — the list is large, but
nothing is skipped or summarized away; present in batches only for pacing. For
each item, decide with the user: rehydrate it (promote it to an active next
action or project, in place, per gtd's Promoting a someday/maybe item —
the caller decides which shape), keep it incubating, close it as already
achieved (DONE + archive per gtd's superseded-outcome rule — surface its
body notes first and run any follow-up work through Skill(process-inbox) /
gtd), or delete it if interest is fully gone (KILL + archive via gtd).
The Someday/maybe view lists each incubated outcome in any open state —
TODO and WAIT alike, since per gtd's States this list is open-state
rather than TODO-only, unlike the active views — the someday/maybe
containers' direct children (per gtd's Tags and structure). An item nested
deeper (an incubated project's own actions) surfaces through its parent, not
separately, and a dated item is off this view like any tag-based list (per
gtd's States) — a dated _keyworded_ incubated item is an anomaly the
Parked/dated cross-check (steps 5–7) normalizes (per gtd's Tags and
structure); a dated _keyword-less_ one is neither open nor closed, so that
open-scoped check cannot see it — the container sweep below clears its date
instead. A keyword-less legacy item appears on no view at all: sweep each
file's Someday/maybe container (org-read-headline) for keyword-less children
the view cannot show, and normalize each with the user per gtd's **Promoting
a someday/maybe item** step 3 (assign TODO/WAIT, and clear any date to keep
it incubating) or close it.
10. Be creative and courageous
This step is GTD's canonical closing move, right after the someday/maybe review:
_"Any new, wonderful, hare-brained, creative, thought-provoking, risk-taking
ideas to add into your system???"_ It is synthesis, not re-review: do not
re-litigate items already handled in steps 1–9; step back to the whole and name
what the siloed passes structurally cannot.
Two voices:
- Invite the user's own ideas. Ask, in the spirit of the canonical prompt,
for any bold, half-formed, or long-deferred idea the review stirred up. Capture
each via Skill(process-inbox) or record it directly through gtd.
- Offer an outsider read. Having just seen the entire system this session,
give a candid, fresh-eyes synthesis as fuel for the same creative step. This
is advisory — you propose, the user disposes. Surface:
- Blind spots — commitments or areas conspicuously absent or untouched.
- Synergies — one next action that would unblock several projects; two
projects that overlap or should merge; a waiting-for that gates other work.
- Stale / zombie projects — nominally alive but drifting, candidates to
KILL rather than perpetually carry.
- Overcommitment & imbalance — too many active projects to be real; skew
across the user's areas of focus (e.g. all work, no personal).
- Low-hanging fruit — quick wins visible only now that all is in view.
- Bigger picture — are the active projects the _right_ things, and do they
ladder up to anything.
Present the outsider read as a concise list of observations (batch for pacing per
the one-section-at-a-time convention). For each, the user decides whether to act;
route any resulting capture or edit through gtd / Skill(process-inbox) exactly
as the other steps do, and add it to the running change list for the close. A
purely-advisory observation the user declines needs no Org change.
Close
- Summarize every change made this session (per
gtd's surfacing conventions;
report any returned org-id:// URIs).
- Offer to mark the tracking habit
DONE(org-update-todo-state), which
advances its weekly repeat. Confirm first, then report the new scheduled
date. If the repeater does not advance cleanly through the tool, tell the
user to complete it in Emacs instead.
- Per
gtd's Availability: iforg-mcpis unavailable, proceed where you
can; if it disappears mid-review, stop and ask.
- If
gcalcliis unavailable, proceed too, skipping the calendar steps (2-3)
(this is the skill's own policy, not gtd's).