<!--
Source: https://docs.vitally.io/reference/projects + https://help.catalyst.io/ + https://developers.notion.com/ + https://help.fathom.video/en/articles/8430832-fathom-api
-->
Success Plan — Goals / Milestones / Criteria — SKILL
Author and operationalize the customer success plan: a strict goal -> milestone -> success-criteria -> owner -> due-date structure tied to customer-measurable outcomes (not feature lists). Push to Vitally Projects (modern CSP), Catalyst Playbook Assignments (enterprise), Gainsight Success Plans (enterprise heavy), or Notion DB (no-CSP fallback). Refresh on QBR cadence; tag status Green/Yellow/Red.
When to use
- Net-new account onboarding — within Day 0-7, draft success plan v1.
- Stale plan refresh — plan hasn't been edited in 60+ days while customer is mid-onboarding.
- Pre-QBR prep — refresh plan ahead of T-7 to align deck data with plan status.
- Save-play customer — at-risk customer with no documented outcomes; CSM needs to capture them fast.
- Renewal positioning — T-90 review of plan outcomes hits to justify uplift.
This skill focuses on the artifact itself (the plan structure + outcomes). For scheduling kickoffs/check-ins around it, use customer-onboarding-day-0-90. For QBR delivery, use qbr-scheduling-facilitation.
Trigger phrases: "success plan", "success plan template", "outcomes for this customer", "goal milestone", "draft a success plan".
Setup
# Vitally (modern)
export VITALLY_SUBDOMAIN="acme"
export VITALLY_API_KEY="<key>"
# Catalyst / Gainsight (enterprise)
export CATALYST_API_KEY="<key>"
export GAINSIGHT_DOMAIN="acme.gainsightcloud.com"
export GAINSIGHT_TOKEN="<token>"
# Notion (fallback / always-on)
# notion-mcp already wired in agent.yaml
# Fathom (kickoff transcript -> plan inputs)
export FATHOM_API_KEY="<key>"
Workspace prerequisites:
- A Notion "Success Plans" database with schema: Customer (Title), CSM (People), Customer Owner (Text), Tier (Select), Last Reviewed (Date), Status (Status: Green/Yellow/Red), Outcomes (Relation -> Outcomes DB).
- A child "Outcomes" database with: Outcome Name, Owner (Customer / CSM), Metric, Target Value, Target Date, Status, Milestones (Relation -> Milestones DB), Risks (Text).
- In Vitally, "Project Templates" configured with default milestones for each tier.
Plan structure (golden rule: outcomes, not features)
Goal -> Outcome (customer-measurable) -> Milestones (CSM- or customer-owned) -> Success criteria (metric + target) -> Owner -> Due date -> Status (G/Y/R) -> Risks
BAD: "Customer will adopt feature X."
GOOD: "Customer will reduce support ticket volume from 50/week to 35/week by end of Q3 via X."
Common recipes
Recipe 1: Author plan v1 from kickoff transcript
# Pull transcript via Fathom
curl -sS "https://api.fathom.video/external/v1/meetings/$MEETING_ID/transcript" \
-H "X-Api-Key: $FATHOM_API_KEY" > kickoff.txt
# Feed to Claude with this prompt:
# "Extract 3 customer-measurable outcomes from this kickoff transcript.
# For each: outcome name, current state, target state, target date, owner,
# 3-5 milestones, 1-2 risks. Output JSON matching schema."
The output JSON powers Recipe 2 (push to CSP) or Recipe 6 (Notion).
Recipe 2: Push plan to Vitally as a Project
curl -sS -X POST "https://$VITALLY_SUBDOMAIN.rest.vitally.io/resources/accounts/external/$CUSTOMER_ID/projects" \
-H "Authorization: Basic $(echo -n $VITALLY_API_KEY: | base64)" \
-H "Content-Type: application/json" \
-d '{
"name": "Success Plan v1 - Reduce ticket volume by Q3",
"description": "Outcome: reduce support tickets from 50/wk to 35/wk by 2026-09-30",
"owner": "csm@acme.com",
"milestones": [
{"name": "Workflow automation v1 deployed", "dueDate": "2026-07-01"},
{"name": "Self-serve docs published to 50% top-ticket categories", "dueDate": "2026-08-01"},
{"name": "Macro library audited + 5 new macros shipped", "dueDate": "2026-08-15"},
{"name": "Ticket volume measured (target <= 35/wk for 4 consecutive weeks)", "dueDate": "2026-09-30"}
],
"metadata": {
"outcome_metric": "tickets_per_week",
"current_value": 50,
"target_value": 35,
"owner_customer": "Champion Jane",
"risks": "Macro adoption dependent on agent training; CSAT may dip during workflow rollout"
}
}'
Doc: https://docs.vitally.io/reference/projects
Recipe 3: Push to Catalyst as Playbook Assignment
curl -sS -X POST "https://api.catalyst.io/v1/playbooks/$SUCCESS_PLAN_PLAYBOOK_ID/assignments" \
-H "Authorization: Bearer $CATALYST_API_KEY" \
-H "Content-Type: application/json" \
-d '{
"company_id": "'$CUSTOMER_ID'",
"owner_email": "csm@acme.com",
"variables": {
"outcome_metric": "tickets_per_week",
"current_value": "50",
"target_value": "35",
"target_date": "2026-09-30"
}
}'
Doc: https://help.catalyst.io/
Recipe 4: Push to Gainsight Success Plan
curl -sS -X POST "https://$GAINSIGHT_DOMAIN/v1/api/cta" \
-H "accesskey: $GAINSIGHT_TOKEN" \
-H "Content-Type: application/json" \
-d '{
"company_id": "'$CUSTOMER_ID'",
"type": "Objective",
"name": "Reduce ticket volume to 35/wk by Q3",
"priority": "High",
"due_date": "2026-09-30",
"tasks": [
{"name": "Workflow automation v1 deployed", "due_date": "2026-07-01"},
{"name": "Self-serve docs published", "due_date": "2026-08-01"}
]
}'
Doc: https://support.gainsight.com/
Recipe 5: Push plan to ChurnZero as Plan + Tasks
# ChurnZero has Success Plans + Tasks
curl -sS -X POST "https://api.churnzero.net/i/v1/accounts/$CUSTOMER_ID/success_plans" \
-H "Authorization: Bearer $CHURNZERO_API_KEY" \
-H "Content-Type: application/json" \
-d '{"name": "Q3 Outcomes", "owner_email": "csm@acme.com", "due_date": "2026-09-30"}'
Doc: https://help.churnzero.com/
Recipe 6: Notion fallback - one page per plan
# notion-mcp create_page
notion.create_page(
parent={"database_id": SUCCESS_PLANS_DB_ID},
properties={
"Customer": {"title": [{"text": {"content": "Acme Corp"}}]},
"CSM": {"people": [{"id": csm_user_id}]},
"Tier": {"select": {"name": "Enterprise"}},
"Last Reviewed": {"date": {"start": "2026-06-11"}},
"Status": {"status": {"name": "Green"}},
},
children=[
{"object": "block", "type": "heading_2",
"heading_2": {"rich_text": [{"text": {"content": "Outcome 1: Reduce tickets to 35/wk"}}]}},
{"object": "block", "type": "bulleted_list_item",
"bulleted_list_item": {"rich_text": [{"text": {"content": "Why it matters: $80k annual support cost reduction"}}]}},
{"object": "block", "type": "to_do",
"to_do": {"rich_text": [{"text": {"content": "Workflow automation v1 deployed (due 2026-07-01)"}}], "checked": False}},
],
)
Recipe 7: Tag status from milestone completion
-- Derive plan status from milestone state
SELECT
plan_id,
customer_id,
count(*) AS total,
count(*) FILTER (WHERE completed_at IS NOT NULL) AS done,
count(*) FILTER (WHERE completed_at IS NULL AND due_date < CURRENT_DATE) AS overdue,
CASE
WHEN count(*) FILTER (WHERE completed_at IS NULL AND due_date < CURRENT_DATE) >= 2 THEN 'Red'
WHEN count(*) FILTER (WHERE completed_at IS NULL AND due_date < CURRENT_DATE) = 1 THEN 'Yellow'
ELSE 'Green'
END AS status
FROM success_plan_milestones
GROUP BY plan_id, customer_id;
Write status back to CSP via Recipe 2/3/4 pattern (PATCH instead of POST).
Recipe 8: Pre-QBR plan refresh checklist
For each outcome on the plan:
- Pull current metric value from
postgresql-mcp/posthog-mcp. - Compare to target_value + target_date.
- Compute % progress.
- Update milestone statuses.
- Set plan-level Status (Recipe 7).
- Write back to CSP and Notion mirror.
Output goes into QBR slide 6 ("Open items - 3 in-flight outcomes").
Recipe 9: Add a mid-cycle outcome
# Append to Vitally project
curl -sS -X POST "https://$VITALLY_SUBDOMAIN.rest.vitally.io/resources/projects/$PROJECT_ID/milestones" \
-H "Authorization: Basic $(echo -n $VITALLY_API_KEY: | base64)" \
-H "Content-Type: application/json" \
-d '{"name": "New outcome: SSO rolled out to 100% workforce", "dueDate": "2026-08-15"}'
When the customer's business changes (acquisition, leadership shift), add an outcome - don't rewrite the plan.
Recipe 10: Archive on renewal
# Vitally - close project, create new one for next year
curl -sS -X PATCH "https://$VITALLY_SUBDOMAIN.rest.vitally.io/resources/projects/$PROJECT_ID" \
-H "Authorization: Basic $(echo -n $VITALLY_API_KEY: | base64)" \
-d '{"status": "Closed", "closedAt": "2026-09-30T00:00:00Z", "outcome": "Achieved 38/wk (target 35/wk; 76% to goal)"}'
Then Recipe 2 again for year 2 plan, referencing year 1 outcomes in description.
Examples
Example 1: Convert feature-list plan to outcomes-led
Goal: Plan currently reads "Adopt features X, Y, Z." CSM needs to fix before QBR.
Steps:
- Pull customer ticket data + product analytics + last QBR notes.
- Identify the business problem each feature was supposed to solve.
- Rewrite outcomes: "Reduce time-to-publish from 4h to 1h by Q3 via X workflow" rather than "Adopt X."
- Recipe 2 -> push new outcomes to Vitally.
- Slack CSM + champion: "Updated success plan ahead of QBR; review by EOD."
Result: Plan tied to measurable customer business outcomes.
Example 2: Stalled plan rescue
Goal: Plan last edited 90 days ago; customer at-risk.
Steps:
- Recipe 7 - status is Red.
- Slack CSM lead + auto-create Linear "save plan" issue (handoff to
churn-save-motion-intervention). - Re-draft plan v2 from latest QBR transcript (Recipe 1).
- Push to CSP and Notion (Recipe 2 + Recipe 6).
- Book customer-side check-in via Calendly (single-use link).
Result: Plan refreshed; save play armed.
Edge cases / gotchas
- Outcomes must be customer-measurable — "Customer is happy" is not an outcome. "Customer NPS >= 8 sustained 90d" is.
- One owner per milestone — shared ownership = no ownership. Designate either CSM or customer per item.
- No more than 3 outcomes — past 3, focus is lost and plan becomes a checklist. Park extras for next QBR.
- Don't backdate plans — plan v1 in month 4 is suspicious; document why and what changed.
- Risks section is required — "no risks" means you haven't asked the customer. Force at least 1 risk per outcome.
- CSP terminology mismatch — Vitally "Projects", Catalyst "Playbook Assignments", Gainsight "Success Plans / CTAs", ChurnZero "Success Plans". Mental model = same; UI labels differ.
- Notion + CSP mirror drift — if you mirror, designate one as source-of-truth and reverse-ETL from there. Recommended: CSP = source, Notion = view.
- Plan rewrite on champion change — new champion has different KPIs. Plan needs a v2 not a continuation.
- Outcome metric not in warehouse — if you don't have the metric instrumented, plan is unmeasurable; flag instrumentation as Milestone 1.
- Customer pushback on metric targets — they want soft targets ("improve a lot"). Push back; document target as customer's own number.