ADU Corrections Interpreter
Overview
Interpret ADU permit corrections letters by reading the letter, identifying each correction item, researching the referenced building codes and city-specific requirements, and producing an actionable breakdown the contractor can hand to their design team.
Workflow
Phase 1: Read the Corrections Letter
Read the corrections letter using vision capabilities. The letter will typically be 1-3 pages of typed text, provided as PNG images or a PDF.
Extract from the letter:
- Project info: address, jurisdiction number, job description, date, reviewer name/contact
- Each numbered correction item, noting:
- The correction comment text
- Any code references (e.g., CRC R302.1, ASCE 7-16 §30.11, CBC Chapter 7A)
- Any plan sheet references (e.g., "Sheet S1", "Detail 2/A3", "Calc Sheet 3 of 37")
- Whether it is a 1st review (outstanding) or 2nd review (new) comment
- Whether it is bold/emphasized (indicates new or escalated concern)
Phase 2: Categorize the Corrections
Group each correction into one of these categories:
- Administrative / Plan Formatting — stamps, signatures, sheet index, governing codes on cover sheet, labeling (e.g., "For Reference Only"). These are drafter fixes, no engineering required.
- Utility Connections — sewer, water, gas, electrical. Typically requires showing connection details per city standard details and justifying pipe/meter sizing.
- Structural / Engineering — calculations, load paths, wind loads, seismic, bracing details. Requires a structural engineer to update calcs and provide details.
- Fire & Life Safety — fire separation distance, fire-rated assemblies, property line setbacks. Requires showing code-compliant details on plans.
- Site / Grading / Drainage — drainage slopes, grading plans, site conditions. Requires showing slopes and directions on site plan.
- Plan Consistency — elevation views not matching roof plan, details not matching conditions. Requires the drafter/architect to reconcile drawings.
Phase 3: Research the Codes
For each correction that references a building code or city requirement, research it using web browser tools and/or parallel subagents.
Strategy for parallel research:
- Launch one subagent per major code topic (not per correction item — group related items)
- Typical groupings: (1) city municipal code / local requirements, (2) CRC/CBC structural or fire codes, (3) ASCE or other engineering standards
- Three parallel subagents is the sweet spot — keeps research fast without overwhelming
For city-specific requirements:
- Search for
"City of [Name]" municipal codeon Google - Look for the city's code on ecode360.com, library.municode.com, qcode.us, or the city's own website
- Search the city website for standard details (e.g., ADU sewer connection details, which cities often publish as PDFs)
- Identify the specific municipal code chapters relevant to ADU construction — typically building code adoption (with local amendments), grading/excavation, and zoning/ADU regulations
For state/national codes (CRC, CBC, ASCE, etc.):
- Search for the specific section number (e.g., "CRC R302.1 fire separation distance")
- Use up.codes, ICC digital codes, or engineering forums (eng-tips.com) for interpretation
- Focus on what the code requires and what options satisfy the requirement
See references/common-adu-codes.md for a quick-reference of codes that frequently appear in California ADU corrections letters.
Phase 4: Compile the Actionable Breakdown
Produce a structured summary organized by correction item number. For each item include:
- What the reviewer is asking for (plain English)
- What the code requires (the actual standard, with options if applicable)
- What the contractor/design team needs to do (specific deliverable)
- Who needs to do it (drafter, structural engineer, or architect)
- Links to relevant resources (city standard details, code sections, municipal code URLs)
Format the output as a markdown document with:
- A header block with project info
- A table of key reference links
- Each correction item as its own section
- Clear delineation between 1st review (outstanding) and 2nd review (new) comments
Phase 5: Flag the High-Effort Items
At the end of the breakdown, call out:
- Which items require professional engineering work (structural calcs, fire-rated assembly details)
- Which items are drafter fixes (labeling, formatting, reconciling drawings)
- Which items may require city coordination (utility connections, grading clarifications)
This helps the contractor prioritize and assign work efficiently.
Important Notes
- This skill reads corrections letters visually — no PDF text extraction pipeline is needed. Vision capabilities handle 1-3 page typed letters directly.
- The skill does NOT cross-reference corrections against the actual construction plan set. It interprets what the reviewer is asking and researches the codes. Cross-referencing with plans is a separate workflow.
- Always note when a correction references a specific plan sheet/detail — the contractor needs this to locate what needs to change.
- City standard details (like sewer connection details) are often published as PDFs on the city's website. Search for them directly.
References
This skill includes a quick-reference for common California ADU building codes:
references/common-adu-codes.md— Frequently cited codes in ADU corrections letters with brief explanations of what each covers