Asplos topic selection

From brycewang-stanford/Awesome-Journal-Skills · View interactive version

Asplos topic selection is an AI agent skill from the GitHub repository brycewang-stanford/Awesome-Journal-Skills. Use when deciding whether a project belongs at ASPLOS or at a single-community venue — applying the cross-layer deletion test, matching against ASPLOS's architecture/PL/OS intersection identity, routing to ISCA/MICRO/HPCA, PLDI/POPL, SOSP/OSDI/EuroSys, SC, or MLSys instead, and choosing between the

How to use this skill

Skill file

ASPLOS Topic Selection

ASPLOS's self-description is unusually operational: it seeks work that improves the

core disciplines — operating systems, programming languages, computer architecture —

and their intersection, and its 2027 rapid-review round explicitly prioritizes

submissions at that intersection (CFP, checked 2026-07-08). Venue fit is therefore

not a prestige question here; it is a screening variable. A technically strong paper

that lives cleanly inside one community can be filtered in the first round not

because it is bad but because a single-community venue owns its reviewers.

The deletion test

Ask, for each layer the paper touches: *if this layer's content were deleted, would

a publishable paper remain?*

candidate wearing an ASPLOS template.

PLDI paper.

is a first-choice target.

The exemplars library shows what passing looks like in award-validated form: an

accelerator argued from data movement, a scheduler premised on hardware

heterogeneity, an interrupt-delivery boundary redrawn between hypervisor and silicon

(see ../../resources/exemplars/library.md).

Routing table

| If the core claim is... | Stronger first target | ASPLOS becomes right when... |

|---|---|---|

| A microarchitectural structure (predictor, cache policy, pipeline) | ISCA / MICRO / HPCA | The structure exists to serve a named software behavior, and software changes with it |

| A language design, type system, or compiler optimization | PLDI / POPL / CGO / OOPSLA | The compiler co-evolves with an ISA, accelerator, or OS interface |

| An OS/distributed-systems design on commodity hardware | SOSP / OSDI / EuroSys / ATC | Hardware assumptions are load-bearing: new memory technology, custom hints, near-data compute |

| HPC-scale performance engineering | SC / PPoPP | The result generalizes into an architectural or systems principle beyond one machine |

| ML training/serving systems on stock stacks | MLSys | The ML workload drives a hardware/software interface change, not just better scheduling |

| Security via hardware mechanisms | IEEE S&P / USENIX Security / CCS | The defense requires co-designed architecture + systems support and its evaluation is performance-shaped |

Scope confirmation: the 2027 topics list spans heterogeneous architectures and

accelerators; cloud and datacenters; memory, storage, networking, and I/O; power,

energy, and thermal management; profiling, debugging, and testing; security,

reliability, and availability; parallelism and big-data systems; virtualization; and

experimental methodologies — with non-traditional topics welcome when centered in the

core disciplines.

Fit interrogation script

Run this before any writing begins:

Q1  Name the interface/boundary the work changes (ISA extension, OS/hardware
    contract, runtime/accelerator ABI, ...). No boundary named -> weak fit.
Q2  Deletion test per layer (above). Both halves survive alone -> route away.
Q3  Who must adopt this? If one community can adopt it without the other
    noticing, the intersection claim is decorative.
Q4  What evidence class does the claim need — real silicon, FPGA, simulator?
    If the answer is "none of these", the paper may be a PL/theory paper.
Q5  Can the contribution be stated in one sentence that a rapid reviewer
    reading only two pages will believe? Draft that sentence now.

Choosing between the two 2027 deadlines

ASPLOS 2027 offers two submission gates — April 15, 2026 (passed as of 2026-07-08)

and September 9, 2026 — framed by the CFP as "submit when ready." Treat the choice

as an evidence-maturity decision, not a calendar accident:

removed the mid-year round, so a miss costs roughly half a year.

camera-ready deadline, six weeks after notification) — but only for papers whose

core was sound. Do not submit a hollow evaluation hoping for the revision path;

the revision counts as a submission on your record with that PC.

Distinctive-fit signals worth writing down

software needs, or vice versa) — the most reliably ASPLOS-shaped idea.

and a software-realism instrument (kernel patch, runtime, full applications).

community's literature suffices, so would its venue.

Intersection anti-patterns

Recurring shapes that look ASPLOS-flavored but fail the screen:

of "hardware support could accelerate this." The intersection must be

load-bearing on page 1, not speculative in section 8.

workload, bound in one PDF with no shared mechanism. Two rejectable halves do

not sum to one acceptable whole.

Without a changed boundary or a transferable principle, it routes to ATC-style

venues or an industrial track.

conceived, claiming the whole intersection. Scope the claim to the evidence and

let the routing table above pick the venue for the scoped claim.

Repairing a near-miss instead of rerouting

If the deletion test fails narrowly, a reframing pass is often cheaper than a

venue change: identify the strongest cross-layer consequence of the existing

result (a new OS policy the hardware data enables; a compiler contract the

mechanism makes checkable), promote it from implication to evaluated

contribution, and rebuild pages 1-2 around the promoted claim. Budget this as

real research work — it usually needs one new experiment — and re-run the

interrogation script afterward rather than assuming the patch took.

Output format

[Fit verdict] first-choice ASPLOS / viable but single-community-stronger / route away
[Boundary changed] <the named interface>
[Deletion test] hardware-only remainder: Y/N · software-only remainder: Y/N
[Route-away target] <venue + one-line reason, or n/a>
[Deadline call] September 9, 2026 readiness: evidence gaps listed
[Two-page sentence] <the one-sentence contribution a rapid reviewer must believe>
Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.