Skeptical engineering certification
Workflow
- Select the requested L0-L7 maturity level and its evidence classes.
- Record the current discovery denominator and covered count; never preserve a percentage after the denominator changes.
- Cross-correlate evidence and explicitly retain contradictory observations.
- Classify every unknown as expected, unexpected, safe, unsafe, read, mutation, deferred, or blocked.
- Attempt approved invalidation paths and supersede evidence tied to an older discovery revision.
- Return
certifiedonly when all level evidence is current, denominator coverage is complete, and no unknown or contradiction remains. - Bind the release claim to the exact source snapshot, dependency locks, generated registries, tests, installed artifact digest, configuration schema, and evidence index with cryptographic hashes.
- Declare the tools and adapters actually used. A missing, substituted, failed, or unexecuted required tool remains visible in the denominator and cannot be reported as a pass.
Completion
Apply contracts/skeptical-certification.schema.json and policies/skeptical-certification.json. A green test run alone is never certification.