Neqsim utilities specification

From equinor/neqsim · View interactive version

Neqsim utilities specification is an AI agent skill from the GitHub repository equinor/neqsim. USE WHEN: selecting and documenting process utility levels and quality requirements: steam, cooling/heating media, instrument air, fuel gas, nitrogen, water and refrigeration. Covers utility design bases, consumer-to-header allocation and project specification reviews. Use neqsim-utility-design for

How to use this skill

Skill file

NeqSim utilities specification

Define the service conditions a utility must deliver at each consumer before sizing

its supply system. Reuse the process design basis and solved cases. Select utility

levels with heat integration, then use

utility design for screening calculations.

For the full report, load

utilities design report.

Establish the requirement source

Read the project basis, applicable regulatory requirements, company specifications,

consumer datasheets and vendor operating envelopes. Use

standards lookup to verify designations,

editions, scope and applicability. Record each requirement's source, identifier,

value, unit, operating case, verification status and evidence. Resolve conflicts

through the project's documented precedence and deviations process.

NORSOK P-002 is a candidate process-system basis where adopted by the project;

instrument-air quality may invoke ISA-7.0.01 and ISO 8573-1. Applicability and

licensed requirements must be checked before assigning limits. Do not identify

NORSOK U-001 or IOGP S-714 as generic utility-system specifications, or cite

ASME PTC 12 as a general boiler-feedwater quality specification.

A public catalogue confirms scope and edition, not compliance with unavailable

clauses. Keep unavailable requirements as explicit gaps. Do not turn examples,

legacy skill tables or a screening model's defaults into mandatory design values.

Shared consumer and header contract

For every service, define:

distinguish these from generation conditions and mechanical design conditions.

response, with their requirement sources.

monitoring, sampling and control requirements.

State absolute pressure as bara and gauge pressure as barg. Convert only using an

explicit reference atmospheric pressure. State gas reference temperature, absolute

pressure, dry/wet basis and compressibility convention before using standard-volume

flows; do not assume Nm3/h and Sm3/h are interchangeable. Distinguish actual

volume, standard volume, mass and molar flow. Preserve the source unit and record

any conversion method. Missing demand is unknown, never an assumed zero.

Choose simultaneous operating cases before consolidating loads. Do not sum

unrelated individual maxima as a normal demand or apply a universal diversity,

spare-capacity or storage factor. Separate continuous, intermittent, startup,

shutdown, emergency and future loads. Record every allowance once and justify it.

Select levels and quality by service

| Service | Requirements and decisions to establish |

|---|---|

| Steam and condensate | Define pressure levels from process temperature profiles, heat-integration targets and consumer requirements. Calculate saturation properties at absolute pressure; check superheat, steam quality, pressure losses and condensate backpressure. Include letdown, desuperheating, flash recovery, traps and return contamination. Set approach temperatures and margins from the project basis, not a fixed increment. |

| Heating water, hot oil and tracing | Define supply/return temperatures, minimum circulation, fluid properties, freeze protection, thermal stability, expansion and degradation limits. Match the required temperature grade and distinguish recovered heat from fired or electrical input. |

| Cooling water, seawater and air cooling | Use site climate and seasonal cases, seawater intake or cooling-tower conditions, material/corrosion constraints and discharge permits. Set return temperatures, allowable pressure drop, fouling and water chemistry from evidence. Check the complete exchanger temperature profile, including approach limits and turndown; do not select cooling medium solely from one process temperature. |

| Instrument and plant air | Specify delivery pressure, particles, oil and moisture separately by service and consumer. Distinguish pressure dew point at its stated measurement pressure from atmospheric dew point; never compare them without conversion. Specify quality class and test basis where adopted. Derive receiver autonomy from the essential demand during the defined failure and usable pressure range; include actuator stroking and dryer regeneration. |

| Fuel gas | Use the burner/turbine vendor envelope for composition, heating-value basis, Wobbe index, delivery conditions, contaminants and allowable variation. State LHV versus HHV, reference conditions and relative-density basis. Evaluate water/hydrocarbon dew points across the pressure-temperature envelope, liquid separation, filtration, heating and supply interruptions. No universal H2S limit, Wobbe tolerance or dew-point margin is assumed. |

| Nitrogen | Define oxygen concentration and other contaminants, purity convention, dryness, pressure and availability for each purge, inerting or blanketing service. Derive the oxygen target from the material and operating conditions, and validate the purge method, mixing/displacement assumption, leakage and measurement endpoint. Do not prescribe a universal vessel-volume multiplier. Assess supply method, storage and oxygen-deficiency hazards. |

| Water systems | Keep potable, service, demineralized, boiler-feed and cooling-water requirements separate. Define quality from duty, boiler pressure/regime, OEM requirements, metallurgy, corrosion/scale control and applicable health/discharge rules. State conductivity reference temperature and concentration bases. Do not prescribe a universal conductivity, dissolved-oxygen limit or chemical-treatment recipe. |

| Refrigeration | Select the medium/cycle against required temperature profiles, climate, refrigerant properties, safety and environmental restrictions. Check evaporator/condenser approaches, heat rejection, operating envelope and part-load performance. Identify a Carnot-fraction estimate as screening rather than a simulated or vendor-qualified cycle. |

Do not automatically connect nitrogen to instrument air. Any backup connection

needs an engineered change covering equipment compatibility, asphyxiation,

backflow prevention, pressure control and the project's safety requirements.

For firewater, drains, vents/flare, electrical supply and other utility interfaces,

load the relevant specialist skill and use the agreed interface conditions.

Do not infer their adequacy from a heat-duty roll-up.

Check sizing hand-off and economics

Pass the selected levels, source requirements and simultaneous case loads to

@utility-design. Keep raw process heat and shaft-work signs distinct from

positive utility consumption. Confirm current NeqSim API signatures and units

before extracting duties. Identify internal heat recovery so neither recovered

heat nor utility generation is counted twice.

For liquid thermal utilities, use the enthalpy rise across supply/return conditions

for mass-flow calculations. A constant heat-capacity approximation needs a stated

range and justification. Check quality and temperature feasibility before accepting

a calculated flow.

Use sourced tariffs, fuel/emission factors, currency, price date and case durations

for annual cost and emissions. Distinguish thermal energy, shaft power and

purchased electrical energy, including stated efficiencies. Do not multiply every

peak load by full-year hours or count internal transfer energy as purchased energy.

Acceptance and hand-off

to utilities design report.

Use readiness labels consistent with the main process report. Screening estimates

and unconfirmed requirements cannot establish detailed-design adequacy or standards

compliance.

Related skills

Reference cooling water and seawater

Load neqsim-cooling-water for water-cooled

process equipment, seawater utilities, reference IAPWS properties, coolant flow

and pumping. Keep each exchanger side on its own fluid model and distinguish

fixed-salinity bulk utilities from electrolyte chemistry and salt mixing.

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.