Neqsim relief flare network

From equinor/neqsim · View interactive version

Neqsim relief flare network is an AI agent skill from the GitHub repository equinor/neqsim. Relief and flare design - PSV sizing per API 520 (gas/liquid/two-phase, fire), API 521 fire heat input, flare load summation, tip sizing, radiation contours, header back-pressure and Mach, and the TR3001 overpressure-study engine. USE WHEN: PSV sizing, relief contingency analysis, thermal relief of

How to use this skill

Skill file

NeqSim Relief & Flare Network Skill

Relief-system screening and simulation: individual PSV sizing, native valve response,

plant load summation, flare-tip selection and consequence estimates. References include

API 520, API 521, API 537, ISO 4126 and ISO 23251; using these

APIs does not establish compliance, certified capacity or installation approval.

PSV unit/API correction, 2026-11-05: ReliefValveSizing pressures are Pa absolute,

not barg or bara. Native SafetyValve and SafetyReliefValve pressure settings use

bara. Convert explicitly at that boundary. Do not infer a capacity, orifice-area or

certified-coefficient basis from a dynamic model's Cv. Select accumulation, blowdown,

back-pressure and radiation limits from the applicable project/code/vendor basis;

the example fractions below are study inputs, not universal acceptance limits.

For a shared PSV, inspect OverpressureStudyResult.getScenarioResults() and report both the area-governing

getGoverningScenario() and the disposal getMaximumLoadScenario(). Re-evaluate older results. Carry each

case's properties and installed piping checks into the relief register. Match offshore equipment tags and declared

PSV tags in the engineering report's apiRp14cProtectionReview section.

When to Use

handoff after rupture screening

Standards: API 520 Part I/II, API 521 (relief contingencies + radiation),

API 537 (flare equipment), NFPA 30, EN ISO 23251.

Native PSV response and canonical P&ID feedback

Use SafetyReliefValve for a self-acting native pressure/hysteresis response with

declared lift lag, dwell and rate limits. Execute the UUID overload used by

ProcessSystem; a direct method-only ramp is not evidence that the process runner

exercises the same response. Keep opening at set pressure, full-open pressure and

reseat pressure distinct. Enable the native gas choked-flow capacity limit for credited gas relief response.

Record getPressureReliefConfiguration() and the actual

lift, flow and ordered pop/reseat observations. A cycle count is not an acoustic or

mechanical chatter model.

Algebraic run()/run(UUID) and steady-mode transient dispatch preserve the

connected source flow and fluid identity while evaluating outlet capacity on a

private inlet workspace. Finite transient mode publishes withdrawal at both

ports; give it a dedicated tee branch and aggregate downstream demands before

upstream inventory integration. Do not use algebraic capacity as a balanced

parallel withdrawal or dynamic-response result.

For a process/P&ID feedback study:

  1. Connect the actual valve to a protected-vessel gas branch and an explicit

downstream pressure boundary through a source-backed tee. Refresh branch

intensive state before valve hydraulics; aggregate both actual demands before

the vessel consumes its outlet boundary. Do not prescribe an arbitrary relief

split or reconcile inventory afterwards.

  1. Import it with PidPressureReliefImporter into the existing PidDesignModel.

The initial supported route is an exact CONVENTIONAL SafetyReliefValve, LINEAR trim and a

real two-outlet Splitter. Record a capacity-basis evidence reference; a

self-acting PSV receives no fabricated controller or SIF signal.

  1. Use PidPressureReliefValidator to apply canonical settings to an isolated

process copy, read them back, fingerprint the actual configuration and attach

strict native scenario evidence. Reject stale bindings, wrong endpoints,

unsupported trim, secondary valve controllers/travel and ignored settings.

  1. Check no-demand standby, actual relief demand, failed/limited relief,

back-pressure sensitivity, slow response and recovery/refinement as applicable.

Reseating requires an earlier observed opening and subsequent physical seating;

an initially closed sample cannot satisfy recovery. No-demand PASS is not

successful protection on a demand.

  1. Retain full-window sampled pressure checks, actual positive discharge and

unwanted-relief checks separately from per-vessel component, mass and energy

closure. A successful response cannot clear numerical FAIL/HOLD or establish

unobserved continuous peaks, certified sizing, SRS/SIL/IPL credit or construction

approval. Check actual snapshot coverage before claiming transactional rollback

of the entire process.

The synthetic AdvancedV101PsvStudyTest, PidNativePressureReliefTest and

SafetyReliefValveUuidTest provide executable examples and regression evidence.

See the PSV workflow guide

and P&ID synthesis for canonical authority,

source identities, explicit absolute-to-gauge references and separate engineering

review gates.

Pattern 1 — Gas-phase area screening

import neqsim.process.util.fire.ReliefValveSizing;
import neqsim.process.util.fire.ReliefValveSizing.PSVSizingResult;

PSVSizingResult psv = ReliefValveSizing.calculateRequiredArea(
    5000.0 / 3600.0, // kg/s
    110.0e5,         // set pressure, Pa absolute
    0.10,            // explicit example overpressure fraction
    1.013e5,         // back pressure, Pa absolute
    333.15,          // K
    0.018,           // kg/mol
    0.95,            // compressibility factor
    1.30,            // Cp/Cv
    false,           // balanced bellows
    false            // rupture disc upstream
);

double area_m2 = psv.getRequiredArea();
String orifice = psv.getRecommendedOrifice();

This exact gas call and the following liquid, two-phase and fire calls are exercised

by ReliefValveSizingDocumentationTest. See the complete tested unit contract in

CODE0.

The selected standard area is a screening result, not a vendor capacity certificate.

Pattern 2 — Wetted-area fire heat-input screening

double Q_fire_W = ReliefValveSizing.calculateAPI521FireHeatInput(
    80.0, // wetted area, m2
    true, // adequate drainage
    true  // prompt firefighting is credited for this scenario
);

This helper is not a vessel energy-inventory simulation. Use an actual dynamic

vessel, declared heat input and a connected relief device to study pressure response.

Do not substitute an assumed latent heat for a phase/enthalpy calculation or invent

an insulation/firefighting credit not implemented and supported by project evidence.

Pattern 3 — Liquid area screening

import neqsim.process.util.fire.ReliefValveSizing.LiquidPSVSizingResult;

LiquidPSVSizingResult lpsv = ReliefValveSizing.calculateLiquidReliefArea(
    50.0 / 3600.0, // m3/s at relieving conditions
    850.0,         // kg/m3
    25.0e5,        // set pressure, Pa absolute
    0.10,          // explicit example overpressure fraction
    1.013e5,       // back pressure, Pa absolute
    0.004,         // dynamic viscosity, Pa s
    false          // balanced bellows
);

Pattern 4 — Two-phase area screening

double area = ReliefValveSizing.calculateTwoPhaseReliefArea(
    30000.0 / 3600.0, // kg/s
    80.0e5,          // set pressure, Pa absolute
    0.10,            // explicit example overpressure fraction
    5.0e5,           // back pressure, Pa absolute
    373.15,          // K
    0.30,            // gas mass fraction
    50.0,            // gas density, kg/m3
    700.0,           // liquid density, kg/m3
    250000.0,        // latent heat, J/kg
    2500.0           // liquid heat capacity, J/(kg K)
);

Pattern 4b — Integrated Overpressure Study (TR3001 / API 521)

For a full overpressure-protection study on one protected item — enumerate

credible relief contingencies, pick the governing case, size the PSV, and check

acceptance — use neqsim.process.safety.overpressure. Each cause calculator is

fluent and returns an immutable ReliefScenario; the engine sizes all credible demands with the applicable vapour, liquid or

two-phase method and selects the largest required area. The highest mass rate controls the individual disposal load.

import neqsim.process.safety.overpressure.*;

// 1. Cause scenarios (fluent → ReliefScenario)
ReliefScenario blocked = new BlockedOutletRelief().setName("Blocked gas outlet")
    .setInflowRateKgPerHr(36000.0).setReliefPressureBara(50.0)
    .setReliefTemperatureC(20.0).setFluid(gas).calculate();
ReliefScenario fire = new FireCaseRelief().setName("Pool fire")
    .setVesselDiameterM(2.0).setWettedHeightM(3.0)   // or setWettedAreaM2(..)
    .setHasDrainage(true).setHasFireFighting(true)
    .setLatentHeatJPerKg(350000.0).setReliefPressureBara(60.0)
    .setReliefTemperatureC(120.0).setFluid(gas).calculate();

// 2. Engine: governing case + sizing + acceptance
ProtectedItem item = new ProtectedItem("V-100", 100.0)   // tag, MAWP [bara]
    .setReliefSetPressureBara(100.0).setBackPressureBara(1.5);
OverpressureStudyResult result = new OverpressureProtectionStudy(item)
    .addScenario(blocked).addScenario(fire).evaluate();

result.getGoverningScenario().getName();   // worst credible case
result.getRequiredAreaIn2();               // API 526 required orifice area
result.getRecommendedOrifice();            // orifice letter
result.isCapacityAdequate();               // area-based adequacy
result.getAcceptance().getAccumulationFraction();  // vs 1.10 / 1.16 / 1.21

// 3. TR3001 compliance findings (PASS/FAIL/NEEDS_REVIEW)
List<ComplianceFinding> findings = new TR3001ComplianceChecker().check(result);
boolean compliant = new TR3001ComplianceChecker().isCompliant(findings);

// 4. Roll relief loads up to a disposal header (API 521 §5.3)
ReliefDisposalResult disposal = new ReliefDisposalNetwork("Fire zone 1")
    .addRelief(resultA, true).addRelief(resultB, true).calculate();
disposal.getTotalSimultaneousKgPerS();   // simultaneous header load
disposal.getPeakSingleKgPerS();          // largest single contributor
disposal.getGoverningContributor();

ControlValveFailureRelief, TubeRuptureRelief, FireCaseRelief.

or TWO_PHASE (with gasMassFraction, gasDensityKgPerM3,

liquidDensityKgPerM3, latentHeatJPerKg, liquidHeatCapacityJPerKgK) to

trigger the matching sizing path; missing two-phase inputs are reported as warnings.

item's MAWP, gauge/absolute basis, contingency, number of installed devices,

governing edition and project-approved accumulation criterion separately.

Adequacy is judged by AREA, not by re-plugging the selected area into the

nozzle equation: calculateRequiredArea (API 520 empirical) and the nozzle

capacity formula use different coefficient bases and are not inverses.

Pattern 5 — Flare Tip & Stack (API 537 + 521 §6)

import neqsim.process.equipment.flare.Flare;

Flare flare = new Flare("MainFlare");
flare.setInletStream(reliefStream);
flare.setRadiantFraction(0.30);                // typical 0.20–0.40
flare.setTipDiameter(0.5);                     // m
flare.setDesignHeatDutyCapacity(150.0, "MW");
flare.run(UUID.randomUUID());

// Radiation at ground distance
double q_Wm2 = flare.estimateRadiationHeatFlux(75.0);   // 75 m
double dSafe = flare.radiationDistanceForFlux(4730.0);  // example 4.73 kW/m2 threshold

Illustrative radiation screening levels; verify the applicable exposure duration,

receptor location and governing project/standard basis before acceptance:

| Receiver | Allowable flux (kW/m²) |

| ---------------------------------- | --------------------------- |

| Personnel — emergency only | 9.46 |

| Personnel — escape (≤1 min) | 6.31 |

| Property line / 2-min escape | 4.73 |

| Solar background | ~1.0 (subtract from above) |

Pattern 5b — Detailed Flare Flame & Sterile-Zone (API 537)

For sterile-zone radii, wind-tilted flame geometry, and flare noise, use

Api537FlareFlameModel (Kent 1968 flame length + tilt + iso-flux solver):

import neqsim.process.safety.fire.Api537FlareFlameModel;

Api537FlareFlameModel flame = new Api537FlareFlameModel(
        50.0,      // relief mass flow [kg/s]
        50.0e6,    // heat of combustion [J/kg]
        0.20,      // radiant fraction
        200.0)     // tip exit velocity [m/s]
    .setStackHeightM(40.0)
    .setWindSpeedMPerS(10.0);

double lFlame = flame.flameLengthM();
double tilt   = flame.flameTiltRad();
double r158   = flame.sterileZoneRadiusM(Api537FlareFlameModel.FLUX_1_58_KW); // ~personnel continuous
double r473   = flame.sterileZoneRadiusM(Api537FlareFlameModel.FLUX_4_73_KW); // property line
double r946   = flame.sterileZoneRadiusM(Api537FlareFlameModel.FLUX_9_46_KW); // emergency-only
double q75    = flame.heatFluxAtGroundDistance(75.0);  // W/m²
double pwl    = flame.soundPowerLevelDb();
double spl    = flame.soundPressureLevelDb(100.0);

Verified by Api537FlareFlameModelTest. Radii are nested (lower flux reaches

further); flame tilts downwind and the tip moves horizontally with wind speed.

Height and wind speed must be finite and nonnegative. Transmissivity must be a

finite fraction in [0, 1]. Invalid values throw IllegalArgumentException.

Pattern 6 — Plant Load Summation

For each contingency (general power failure, total reflux failure, fire zone):

  1. List PSVs that lift simultaneously
  2. Sum mass flows at each PSV at its relieving conditions
  3. Pick the governing contingency (highest header load)
  4. Size the flare for that load
double totalReliefLoad = psvs.stream()
    .filter(p -> isActiveDuring(p, contingency))
    .mapToDouble(p -> p.getMassFlowCapacity())
    .sum();

For simultaneous blowdown contingencies (multiple BDVs into one header), use

MultiVesselBlowdownStudy (see neqsim-depressurization-mdmt) — it superimposes

the transient blowdown curves on a common time grid and reports the peak

combined header mass flow and the header Mach at that instant, which is the load

that actually sizes the header.

Pattern 7 — Header Back-Pressure & Mach

Use the actual downstream stream/header pressure in the connected hydraulic model.

Distinguish superimposed from built-up back pressure and evaluate the selected valve's

certified operating envelope. A conventional/balanced/pilot label does not by itself

justify a fixed allowable percentage or correction factor.

SafetyReliefValve exposes setValveType, setBackpressureSensitivity and setKbMax

for its empirical response model. These parameters do not replace certified vendor

curves. Legacy SafetyValve uses setPressureSpec in bara; it has no

setSetPressure, setBackPressure or getBackPressureCorrectionFactor APIs.

Do not call those nonexistent overloads or pass barg to a bara setter.

Check header hydraulics and project Mach/velocity criteria separately. Include the

actual relief line and disposal destination in the canonical P&ID; a drawn off-page

connector alone is not a simulated flare network or validated back-pressure model.

Pattern 8 — Dispersion of Unignited Release

FlareDispersionSurrogateDTO disp = flare.getDispersionSurrogate();
// Use to bound H2S / SO2 ground concentration vs. IDLH/ERPG-2

For a governed production-readiness record, use

neqsim.process.engineering.safety.FlareConsequenceCalculation. It combines explicit

point-source radiation, neutral Gaussian centerline dispersion, spherical noise spreading,

and tip-Mach constraints in one typed result with uncertainty and provenance. Set

productionQualification=true only with standards/evidence references and

consequenceMethodApplicability=approved. This is a screening interface, not a substitute

for validated complex-terrain, stability-class, toxic, combustion, or detailed acoustic

modeling.

Steady dry-gas discharge into one header

Use SteadyFlareGasNetwork.rate for the simultaneous fixed-opening capacity of tagged branches

with individual inlet and tailpipe losses. Supply the project device pressure limits, gas properties,

pipe geometry and tip characteristic. Use SteadyFlareGasNetwork.TipCurve for rated dry-gas

flow (kg/s) and absolute tip-inlet pressure (bara) points on the modeled gas and outlet basis.

Inspect each capacity and outlet-pressure margin alongside

the network mass residual and pipe Mach values. For a blowdown history, recreate the source

pressures and openings at the common sampled peak and call ratePeakGasCapacity. See the

worked gas-network example.

Common Mistakes

| Mistake | Fix |

| --------------------------------------------------------- | -------------------------------------------------------------------- |

| Treating a sample accumulation fraction as code approval | Establish the contingency, applicable code/edition and pressure basis; declare the approved criterion |

| Wetted area = total surface | Establish actual wetted geometry, fire exposure and applicable standard limits |

| Inventing drainage, insulation or firefighting credit | Verify project evidence and the exact helper implementation; the smaller coefficient requires adequate drainage and prompt firefighting |

| Adding all PSV capacities for header | Use the governing contingency, not sum of nameplate capacities |

| Assuming a discharge coefficient from a service label | Obtain the applicable certified/vendor coefficient and correction-factor basis |

| Ignoring Mach and built-up pressure in the header | Evaluate actual compressible hydraulics; a project Mach margin is not the sonic choking condition |

| Ignoring inlet-line loss and valve/system interaction | Check applicable installation criteria and engineering-analysis requirements; a pressure-loss percentage alone does not prove chatter |

| Treating an API 526 letter as certified relief adequacy | Check selected area, service, certified coefficients and vendor capacity; apply project margin explicitly |

Validation Checklist

Related Skills

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.