Neqsim controllability operability

From equinor/neqsim · View interactive version

Neqsim controllability operability is an AI agent skill from the GitHub repository equinor/neqsim. Process controllability and operability — operating envelope mapping, turndown analysis, startup/shutdown sequencing, control valve sizing per ISA-75 (Fl, Fp, choked flow), rangeability, hunting/loop tuning, recycle stability. USE WHEN: a task involves operability assessment, turndown studies, contr

How to use this skill

Skill file

NeqSim Controllability & Operability Skill

The "can this plant be operated?" half of process design — operating envelopes,

turndown, startup/shutdown sequencing, control valve sizing, and steady-state

operability checks. Pairs with CODE0

which solves the transient response.

When to Use

partly closing a control valve, opening a bypass, or changing controller mode

For P&ID-driven operational changes, load neqsim-pid-process-operations first

to classify symbols, define the topology, bind plant tags, and turn each action

into a NeqSim model delta.

For MCP or Java workflows that already have a ProcessSystem, use

neqsim.process.operations.envelope.OperationalEnvelopeEvaluator or MCP

runOperationalStudy with action="evaluateOperatingEnvelope". The evaluator

does not duplicate equipment physics; it ranks margins from

EquipmentCapacityStrategyRegistry, uses optional tagreader field data through

OperationalTagMap, and can turn margin history into simple time-to-limit

screening.

Standards: ISA-75.01 / IEC 60534-2-1, API 685 (control valves), NORSOK P-002 (operability).

Pattern 1 — Operating Envelope Map

Sweep two key handles (e.g. flow and composition) and check that every constraint

is satisfied in the operating window:

double[] flows = linspace(0.1, 1.0, 10);   // 10–100% turndown
double[] gors  = linspace(50.0, 800.0, 8); // GOR variation

for (double f : flows) {
    for (double g : gors) {
        SystemInterface fluid = makeFluid(g);
        feed.setFlowRate(f * design_kgh, "kg/hr");
        process.run();
        envelope.recordPoint(f, g, checkConstraints(process));
    }
}

Constraints to check on every point:

| Constraint | Check | Source |

| ----------------------- | ---------------------------------------------------- | --------------------- |

| Compressor surge | Q_actual > Q_surge × 1.10 | Vendor curve |

| Compressor stonewall | Q_actual < Q_choke × 0.95 | Vendor curve |

| Separator vapor velocity | v < K × √((ρL−ρV)/ρV) | NORSOK P-100 (K=0.107) |

| Separator residence time | t_res ≥ 3 min liquid, ≥ 30 s gas | API 12J |

| HX ΔTmin | ΔT > 5 °C everywhere | Pinch design |

| Column flooding | C_factor < 0.85 × C_flood | Souders–Brown |

| Column weeping | C_factor > 0.55 × C_flood | Tray vendor |

| Pump NPSHa | NPSHa > NPSHr + 1 m margin | API 610 |

| Control valve opening | 20% < travel < 80% | ISA-75 |

Pattern 2 — Control Valve Sizing (ISA-75)

import neqsim.process.equipment.valve.ThrottlingValve;

ThrottlingValve cv = new ThrottlingValve("LV-1101", inletStream);
cv.setOutletPressure(P_downstream_bara);
cv.run();

double Cv_required = cv.getCv();          // ISA-75 sizing
double opening     = cv.getPercentValveOpening();
double dpRatio     = cv.getDeltaPressure() / cv.getInletPressure();
boolean choked     = dpRatio > cv.getFL() * cv.getFL() * (1 - cv.getFf() * cv.getXt());

Sizing rules:

Rangeability:

| Trim type | Rangeability |

| ---------------- | ------------ |

| Linear | 30:1 |

| Equal percentage | 50:1 |

| Quick opening | 10:1 |

If turndown ratio > rangeability, you need a split-range or two valves in parallel.

Seat Leakage Tightness (screening)

To rank candidate valve tightness requirements (isolation/ESDV block valves vs throttling control

valves), use the ValveSeatLeakageClass enum (neqsim.process.equipment.valve). It covers EN

12266-1 Rates A–G (isolation valves) and ANSI/FCI 70-2 Classes II–VI (control valves); Class IV

(0.01% of rated capacity) is the typical control-valve default, Class VI is the soft-seat

essentially-zero-leakage class:

import neqsim.process.equipment.valve.ValveSeatLeakageClass;

ValveSeatLeakageClass ctrl = ValveSeatLeakageClass.FCI_70_2_CLASS_IV;
boolean tight = ctrl.isEssentiallyZeroLeakage();   // false for Class IV, true for Class VI

// ANSI/FCI 70-2 Class V closed-form liquid leak-rate screening estimate (test medium water)
double leakRateMlPerMin =
    ValveSeatLeakageClass.estimateFciClassVLeakRate(50.0e5 /* Pa */, 0.10 /* m port */);

This is screening-level only and not a substitute for a manufacturer seat-leakage test certificate.

See docs/process/ValveMechanicalDesign.md for the

full reference.

Pattern 3 — Recycle Stability

A process with strong recycles can have multiple steady states or be unstable:

ProcessSystem.RecycleConvergenceMonitor mon = process.getRecycleMonitor();
process.run();
double[] residual = mon.getMassResidualHistory();
// Plot residual vs iteration — should be monotone decreasing.
// If oscillating: recycle interactions; if diverging: bad initial guess or fundamental instability

Stabilization tactics:

Pattern 4 — Startup / Shutdown Sequence

Document each major mode as a state machine:

| State | P / T / flow | Active controllers | Active SIFs |

| -------------- | ------------------------------------------- | ----------------------------------- | ------------- |

| Cold shutdown | atmospheric, ambient | none | all in OOS |

| Pressurization | ramp to design × 0.3 in 30 min | PIC slow ramp | HIPPS armed |

| Cold circulation | full rate, ambient (recycle to flare) | LIC, FIC | all armed |

| Heat-up | ramp 50 °C/h to design T | TIC, LIC, FIC | all armed |

| Normal | design point | all loops in AUTO | all armed |

| Emergency BD | depressurize per API 521 in 15 min | controllers tripped | BDV open |

Use CODE0 to validate the transient.

Pattern 5 — Loop Tuning Sanity

For each PID:

Common bad loops:

Pattern 6 — Operability Scorecard for the Report

Operability Scorecard
=====================
Turndown        : 25–110% of design     PASS (target ≥ 25%)
Compressor      : surge margin 18% @ low end   PASS (≥ 10%)
Column          : flooding margin 22% @ high end  PASS (≥ 15%)
Recycle stab.   : converges in 8 iters @ all loads  PASS
Control valves  : 4 valves outside 20–80% range — RESIZE
Startup time    : 6.5 hr (cold→full)    PASS (target ≤ 8 hr)
SD time         : 12 min API 521 BD     PASS (target ≤ 15 min)

Common Mistakes

| Mistake | Fix |

| --------------------------------------------------------- | ------------------------------------------------------------------ |

| Sizing CV with normal ΔP and forgetting choked flow | Always check σ = ΔP / Fl² × ΔP_max; if exceeded use choked formula |

| One CV across full 10–110% range | Rangeability > 30:1 needs split-range or two valves |

| Designing only at 100% flow | Min/max constraints often govern (surge, weeping, NPSH) |

| Ignoring recycle interactions until commissioning | Decompose with ProcessModel, verify convergence at each load |

| Aggressive Kp on level control | Causes throughput oscillation downstream; use P-only averaging |

| No startup BD path | Cold flare/atmospheric vent path required for trip-from-pressurized |

| Using "design rate" pump curve | Pumps often run at 60–80% Qbep at normal — pick BEP at normal |

Validation Checklist