Implementation Readiness Skill
[!IMPORTANT]
Verify BRD-lite, PRD, SRS/FRS, UX, and test prerequisites before implementation starts.
Optional args: slug=<feature>, ticket=<id/url>, mode=interactive|autonomous|channel, channel=<id>, auto_continue=true|false, profile=business|hybrid|technical.
Instructions
When the user asks to perform this workflow, execute the following steps:
Implementation Readiness Workflow
Goal: Decide whether a planned change is ready for implementation or must return to planning/design.
Steps
- Load artifacts:
- Load task-linked approved brief/ticket, PRD/story or equivalent approved evidence, canonical ledger (
docs/product/<slug>/evidence.json) when present, optional verification kit/journey map reference (docs/verification/<app>/, an explicit task-supplied path, or accessible equivalent per the installedcommon/common-project-verificationskill) when supplied, SRS/FRS when needed, UX/design evidence, implementation plan, and test plan. - Do not require a separate filename when an approved task record supplies the necessary information; missing documents do not force repeat intake. An accessible existing equivalent suffices without requiring new kit authoring. A matching record and stable slug are required; unrelated documents/working-tree changes are not authority or approval.
- Carry the delivered
delivery_mode, authoritative work-item reference plus source revision, owner, and approval reference from the handoff; do not re-infer them from filenames or surprising tree state. - Readiness consumes evidence-lane references, never their claims: technical verification, business acceptance, and release remain separate decisions, and an absent reference is
not assessed.
- Check readiness:
- Approved task record supplies outcome, constraints/non-goals, testable ACs, owner and approval; equivalent approved low-risk evidence suffices without separate BRD/PRD/SRS files.
delivery_mode: briefrequires only that record with outcome, scope fence, owner, observable criteria, approval reference, and verification lane; missing formal IDs are expected, while a sensitive change is never ready asbrief.approval: approvedpasses;pendingblocks;assumed-autonomouswarns and blocks only whensnc_tier=high. Sensitive trust-boundary changes still require applicable design/human floor. - ACs have one observable behavior per AC across happy, edge, and error paths, with necessary preconditions and platform/market/role scope; truth tables for interacting conditions. Examine scope coverage and conflicts before issuing READY or PARTIAL; consequential conflicts block affected slices with consequence, owner, and required input without inventing business/error policy.
- Affected-scope evidence freshness and current authority: stale proof (changed source/build/journey identity) or disputed decisions block only the consuming action/affected slice, requiring reproof while unrelated applicable evidence is retained; stale evidence cannot produce PASS.
- Verification kit prerequisites: when a task supplies a kit reference (
docs/verification/<app>/, an explicit task-supplied path, or an accessible equivalent per the installedcommon/common-project-verificationskill), verify target prerequisites (app build/digest, driver, seed data, healthy instance). No supplied reference is not a blocker by itself: equivalent project instructions suffice and new kit authoring is never required. An explicitly supplied path that is missing or inaccessible blocks only its dependent scope; record the exact gap and accountable owner, and never silently substitute another kit or target. When a referenced kit or journey prerequisite (environment, driver, data, authority) is unavailable, record the exact gap, accountable owner, and affected slice without blocking independent approved work or inventing commands. A kit reference never supplies missing human authority, bypasses platform gates, or acts as a runtime PASS. - Human risk acceptance: where lawful, an explicit recorded release
risk_acceptdecision documents uncertainty and rationale; it waives specific baseline sources for release only, but never converts unvalidated/inconclusive evidence into validated proof, and cannot authenticate host approval. An investmentrisk_acceptdocuments uncertainty and rationale without waiving evidence or altering product state. Missing monetary data is not a qualitative-investment blocker. - Optional product capability gap: if optional product-evidence capability (
product-evidence/product-managementpackage / script / Node >=20) is absent, record exact gap inmissing_evidence(e.g.Capability gap: <pkg> not installed; opt in at a reviewed ref and sync), preservefeature_status, and treat product gate result as an unvalidated proposal only; other missing required tooling or environment remains a BLOCKED prerequisite for the affected slice. - Available requirement/design evidence identifies affected modules and consequential API/data/interface/migration/permission/failure/NFR choices; unresolved sensitive or consequential choices route to technical design and human approval.
- Trace ACs across 4 V-Model levels (Acceptance, System, Integration, Unit) per
skills/quality-engineering/quality-engineering-test-plan-authoring/references/lifecycle-and-roles.md(STLC Stages 1-2); low-risk changes use equivalent existing evidence. - UX/design evidence covers loading, empty, error, permission, responsive/mobile cases when UI changes.
- Mobile readiness (Contract C6): app build/digest/version, OS/device matrix, driver preflight (
appium-mcp/native runner), permissions, test data/reset (distinguishfullReset,noReset, real binary upgrade wherenoReset != real upgrade, and state preservation for prior build/session/offline queue), lifecycle mechanism (warm resume vs config change vs true process death whereActivityScenario.recreate != process death). Missing build or driver blocks affected mobile slices. - Test strategy maps ACs to unit, integration (API contracts/dependencies), system (E2E/mobile), security, Zephyr/manual lanes; tool prerequisites known (credentials, environments, feature flags, test data, MCP). Schedulable delivery dependencies required; unresolved prerequisites block affected slices.
- Decide:
- READY: approved evidence, owner, ACs, required design/approval and test prerequisites permit named slice(s) to start.
- BLOCKED: required authority/approval, owner, unclear AC, consequential design, environment, or risk unresolved; do not recommend unconditional implementation.
- PARTIAL: name each independently bounded ready slice with owner, approval and verification lane; name each blocked slice with its owner, dependency/input and reason. Only ready slices may flow downstream.
- Route:
- For autonomous/channel mode, return READY only with named slices, owners, verification lanes, approval and available required environments.
- READY ->
implement-featureordev-fix. - BLOCKED ->
plan-featureordesign-solution; do not emit unconditional implementation recommendation. - PARTIAL -> send only explicitly ready slices downstream with their blockers and owners; downstream execution cannot absorb blocked slices or claim their activation.
- Write run record to
artifacts/runs/[slug]/[compactISO]-implementation-readiness.jsonwhen writes allowed.
Runtime Contract
- Use before implementation starts to gate go/no-go.
- Load
common-decision-disciplineand apply its ยง8 continuation contract at entry and every handoff: the settled result selects the successor and specialized gates dominate. - Required inputs: matching approved task record/ticket or equivalent evidence, owner, testable ACs and design/test prerequisites applicable to each proposed slice. Missing filenames do not force repeat intake.
- Return BLOCKED only when required authority/approval, owner, unclear AC, consequential design, environment, or risk remains unresolved.
Handoff Payload
slug,operator_profile,delivery_mode, work-item reference plus source revision, approval reference, verdict (READY/BLOCKED/PARTIAL), ready slices with criteria refs and verification lanes, blocking gaps, capability gaps, evidence-lane refs, outcome report, next workflow.
Blocking Questions
- Ask max 3 at a time with a recommended default and 2-3 options.
Output Template
# Implementation Readiness
## Delivery Mode And Work Item
- Mode: brief | standard | extended; work item + revision: [ref @ rev]; owner: [owner]; approval: [ref or pending]
- Evidence lanes: technical [not assessed], acceptance [not assessed], release [not assessed]
## Verdict
## Ready Slices
| Slice | Owner | Criteria refs | Verification lane |
| --- | --- | --- | --- |
| [slice] | [owner] | [REQ/AC or observable criteria] | [lane] |
## Blocking Gaps
| Area | Gap | Owner/Input Needed |
| --- | --- | --- |
| [area] | [gap] | [owner/input] |
## Outcome Report
{schema_version: 1, run_id: "[run-id]", slug: "[slug]", workflow: implementation-readiness, feature_status: design_ready, started_at: "[timestamp]", completed_at: "[timestamp]", requirement_trace: {brd_objectives: [], requirements: [], acceptance_criteria: [], srs: []}, completed_evidence: [], missing_evidence: [], decision_needed: [], recommended_next_workflow: implement-feature, cost: {source: unavailable}, agent: {identity: "[agent-identity]", model: "[model]"}}
## Next Workflow
## Cost Report
Call `get_session_cost(workflow="implementation-readiness")` before final handoff.