Release PR
Overview
Creates or updates a GitHub pull request from dev (main branch) to master (release branch) with auto-generated release notes. The release notes are assembled from GitHub milestone issues and git commit history, following the established evitaDB release notes format.
When to Use
- You are ready to cut a release and need a PR from
devtomaster - You want to refresh the release notes on an existing release PR
- Invoked as
/release-pr
Workflow
Execute the following steps in order. Stop and report to the user if any step fails.
Preliminary Phase: Pre-Release Verification
Verify dependency signatures, dependency freshness, and (optionally) backward compatibility before proceeding with the release.
PGP dependency signature verification
Verify that all dependency signatures are valid before proceeding with the release. This catches PGP key rotations that would break the CI/CD PGP Keys Check step.
P1: Run PGP verification
./tools/verify-pgp-keys.sh --check
If it exits 0 (all signatures valid), skip to Step 1.
If it exits non-zero, the script outputs a structured report for each failing group with:
- New signing fingerprint
- Cross-reference result (same key signs other group artifacts)
- Public keyserver lookup result (which server, UID)
- Old key expiry status
P2: Present findings to the user
For each group in the script output, present a summary table:
| Check | Result |
|---|---|
| New key fingerprint | 0x... (from script output) |
| Cross-ref: same key signs other group artifacts | Yes/No |
| Key found on public keyserver | Yes/No (which server) |
| Key UID | From script output |
| Old key expired | Yes (date) / No |
P3: Apply validated keys
For [PASS] entries (cross-reference succeeded AND/OR key exists on a keyserver):
- Ask the user for confirmation using AskUserQuestion before applying changes.
- If confirmed, run:
```shell
./tools/verify-pgp-keys.sh --fix
```
This updates pgp-keys-map.list with the validated fingerprints.
- Commit the change:
git add pgp-keys-map.list && git commit -m "chore: update PGP keys for <groupIds> after key rotation" - Proceed to P4 to re-verify.
For [FAIL] entries (cross-reference failed AND key not on any keyserver):
- Stop and warn the user. Do NOT proceed with the release. Report exactly which checks failed and advise manual investigation. This could indicate a supply-chain compromise.
If the report contains a mix of PASS and FAIL entries, apply the PASS fixes first, then stop and report the FAIL entries. Do not proceed to Step 1 until all entries are resolved.
P4: Re-run verification
After applying fixes, re-run the check:
./tools/verify-pgp-keys.sh --check
If it passes, proceed to P5. If it still fails, repeat from P2 for the remaining failures.
P5: Check for dependency updates (informational)
Run:
mvn versions:display-dependency-updates
This check is purely informational and must never block the release. If the command fails, hangs, or exits non-zero, note that it could not complete and move on to P6 regardless — do not stop the workflow or ask the user to fix anything here. If it succeeds, briefly summarize any dependencies with available updates for the user's awareness; upgrading them is out of scope for this skill.
P6: Backward-compatibility checks (optional, ask first)
Both checks below are slow (a long-running test / a static-analysis audit) — ask before running either. Skipping is a valid choice; note whatever was skipped in the final report (Step 7).
- Data backward compatibility. Ask the user via AskUserQuestion before doing anything else here — whether to run
EvitaBackwardCompatibilityTestnow.
- If yes, run:
```shell
mvn -pl evita_test/evita_long_running_tests test -P longRunning -Dtest=EvitaBackwardCompatibilityTest
```
If it fails, stop and report the failure to the user — a backward-compatibility regression should not ship silently in a release PR. Let the user decide how to proceed.
- If no, record it as skipped and continue.
- Kryo serialization backward compatibility. Ask the user via AskUserQuestion before launching anything — whether to run the
kryo-bwc-auditskill now, as a separate sub-agent so it doesn't clutter this session's context. Do not launch the sub-agent speculatively or by default; the question must be asked and answered first.
- If yes, launch it with the Agent tool (e.g.
general-purpose), instructing the agent to invoke thekryo-bwc-auditskill against the current branch and return its findings table and verdict summary. - Relay the agent's summary to the user. If it reports any blocking (
***) findings, flag them clearly and let the user decide how to proceed — do not silently continue to PR creation. - If no, record it as skipped and continue.
Proceed to Step 1.
Note: Any PGP key update commits from the Preliminary Phase will be part of the working tree when Step 2 checks for a clean state. The user must push those commits before proceeding.
Step 1: Validate branch
Run git branch --show-current and verify the result is dev. If not, stop and tell the user they must be on the dev branch.
Step 2: Validate working tree is clean and pushed
- Run
git status --porcelain— if output is non-empty, stop and tell the user to commit or stash changes. - Run
git fetch origin devthen comparegit rev-parse devvsgit rev-parse origin/dev— if they differ, stop and tell the user to push their commits first.
Step 3: Extract release version
- Read the root
pom.xmland extract the version from the first<version>tag. - Strip the
-SNAPSHOTsuffix if present (e.g.2026.1-SNAPSHOTbecomes2026.1). - Format the PR title as
Release {version}(e.g.Release 2026.1). - Ask the user to confirm the version using AskUserQuestion before proceeding.
Step 4: Determine base version for dependency comparison
Run the following to find the latest release tag on master:
git fetch origin master
git describe --tags --abbrev=0 origin/master
This returns a tag like v2025.8.15. Strip the leading v to get the base version (e.g. 2025.8.15). This is passed to list-issues.sh as the second argument for dependency comparison.
Step 5: Generate release notes
Run both scripts and capture their output:
./tools/list-issues.sh "{version}" "{base_version}"
./tools/list-commits.sh "{base_version}"
Where {version} is the milestone title from Step 3 (e.g. 2026.1) and {base_version} is from Step 4 (e.g. 2025.8.15).
Then aggregate the two outputs into a single release notes body following these rules:
- Issues from
list-issues.share authoritative — they have proper issue numbers and milestone categorization. Always include all of them. - Commits from
list-commits.shsupplement — include commit entries that represent meaningful user-facing features or bug fixes not already covered by an issue entry. Match by description similarity to avoid duplicates. - Filter out non-user-facing items from the commits list:
- CI/CD fixes (GitHub Actions, Docker workflows)
- Internal code quality refactors (toString fixes, code style)
- Compilation fixes
- Test infrastructure changes
- Keep these sections in order:
### ☢️ Breaking changes### 🚀 Features### 🐛 Bug Fixes### ⛓ Dependencies upgrades
- Omit documentation (
📝) and test (🧪) sections from the final release notes — they are internal-facing. - Omit empty sections entirely.
- The final body must start with
## What's Changed.
Step 6: Create or update the PR
- Check if a PR from
devtomasteralready exists:
```shell
gh pr list --repo FgForrest/evitaDB --head dev --base master --state open --json number,title --jq '.[0]'
```
- If no PR exists: create one:
```shell
gh pr create --repo FgForrest/evitaDB --head dev --base master \
--title "Release {version}" \
--body "<release notes body>"
```
- If PR exists: update its title and body:
```shell
gh pr edit {PR_NUMBER} --repo FgForrest/evitaDB \
--title "Release {version}" \
--body "<release notes body>"
```
Step 7: Report result
Print the PR URL and a summary of what was done (created vs updated), plus the status of the P5/P6 checks (dependency updates found, whether EvitaBackwardCompatibilityTest and kryo-bwc-audit were run or skipped, and their outcomes).
Important Notes
- Always use a HEREDOC to pass the PR body to
gh pr createorgh pr editto preserve markdown formatting. - The
list-issues.shscript requires theghCLI to be authenticated. - If
list-issues.shreports no milestone found, tell the user to verify the milestone title exists on GitHub. - If the base version tag doesn't exist, tell the user and ask them to provide the previous release version manually.