Pre-Phase Review
Review the living artifacts (PVR, Architecture & Design, Plan) before starting a new phase. Surface anything that needs attention and get clearance to proceed.
Arguments
- $ARGUMENTS: Optional next phase description (e.g., "Phase 3: First Cloud Deploy"). If empty, infer from the plan file's next incomplete phase.
Instructions
Step 1: Locate living artifacts
Search for the three artifact types:
- PVR — Glob
agency/workstreams/*/**/*-pvr-*.mdandusr/*/**/*-pvr-*.mdfor Product Vision & Requirements files. - A&D — Glob
agency/workstreams/*/**/*-architecture-*.md,agency/workstreams/*/**/*-ad-*.md, anddocs/plans/*-architecture-*.mdfor Architecture & Design files. - Plan — Glob
docs/plans/*.mdand pick the most recently modified plan file.
If any artifact is missing, note it ("PVR not found — skipping PVR review") but continue with whatever exists. If none are found, tell the user and stop.
Step 2: Parallel review agents
Launch three agents in parallel, one per artifact:
PVR reviewer:
- Read the PVR file.
- Is it still accurate given what has been built so far?
- Are requirements met, changed, or newly discovered?
- Are success criteria still valid and measurable?
- Flag anything that no longer reflects reality.
A&D reviewer:
- Read the A&D file.
- Are design decisions still sound given what was learned during implementation?
- Are there decisions that should be revisited based on new information?
- Are there new patterns, conventions, or architectural choices made during implementation that should be documented here?
- Flag any drift between the document and the actual codebase.
Plan reviewer:
- Read the Plan file.
- Are remaining phases still correctly scoped given what was learned?
- Should anything be reordered, split, or merged?
- Are there new risks, dependencies, or blockers?
- Does the phase boundary still make sense, or has scope shifted?
Each agent should return a structured list of findings, each categorized as:
- Clean — no changes needed
- Highlight — informational, no action required but worth noting
- Decision needed — requires the principal's input before proceeding
Step 3: Consolidate findings
Merge results from all three agents. Group by category:
- No changes needed — list any artifacts that are fully up to date
- Highlights (informational) — things worth noting but not blocking
- Decisions needed — items requiring the principal's input, each with:
- What the issue is
- What the options are
- Trade-offs for each option
- A recommendation
Step 4: Present to the principal
Always show the full consolidated report, even if everything is clean.
If no issues were found:
PVR, A&D, and Plan reviewed. No changes needed. Ready to proceed to [next phase].
If there are highlights but no decisions:
Show the highlights, then: "No decisions needed. Ready to proceed to [next phase]."
If decisions are needed:
Show everything, then present each decision with numbered options so the principal can reply by number.
Step 5: Apply decisions
If the principal makes decisions that require artifact updates:
- Update the relevant files based on their decisions.
- Confirm what was changed in each file.
- Do NOT commit — leave changes unstaged for the principal to review.
Step 6: Update handoff
After decisions are applied, locate the handoff file (glob usr/*/*/handoff.md or usr/*/captain/handoff.md). Update with:
- Pre-phase review findings and decisions made
- Updated phase scope (if any changes were made)
- Current state of PVR, A&D, and Plan
- What the next phase will tackle
Step 7: Get clearance
Ask: "Ready to proceed to [next phase]?"
Wait for explicit confirmation before the phase begins.