Prd v08 runbook creation

From mattgierhart/PRD-driven-context-engineering · View interactive version

Prd v08 runbook creation is an AI agent skill from the GitHub repository mattgierhart/PRD-driven-context-engineering. Create operational playbooks for incident response, deployments, and maintenance during PRD v0.8 Deployment & Ops. Triggers on requests to create runbooks, document procedures, or when user asks "how do we handle incidents?", "runbook", "operational procedures", "on-call guide", "incident response",

How to use this skill

Skill file

Runbook Creation

Position in workflow: v0.8 Release Planning → v0.8 Runbook Creation → v0.8 Monitoring Setup

Execution Mode

Default is standard. See CODE0 for selection logic.

| Mode | What this skill produces |

|------|--------------------------|

| quick | 2–3 runbooks covering the top RISK-/MON- pairs |

| standard | Incident + deployment + maintenance runbooks linked to MON- and DEP-, with escalation paths |

| deep | Full matrix + drill schedule + recovery scenarios + tabletop exercise outputs |

Consumes

This skill requires prior work from v0.8 Release Planning and earlier stages:

This skill assumes DEP- entries are complete with rollback procedures and post-deploy validation steps defined.

Produces

This skill creates/updates:

All RUN- entries are operational procedures, not confidence-based. They are:

Example RUN- entries:

RUN-001: Database Connection Pool Exhaustion
Category: Incident
Trigger: MON-005 alert (connection pool >90%) — from v0.8 Monitoring Setup
Owner: Backend Team
Last Tested: 2025-02-20

## Scope
- **Handles**: Connection pool saturation, slow queries causing pooling
- **Does NOT handle**: Database server crash (see RUN-010), Network failure (see RUN-011)

## Prerequisites
- [ ] Access to AWS RDS console
- [ ] PostgreSQL read credentials in LastPass
- [ ] PagerDuty access for escalation
- [ ] Datadog dashboard access (MON-005 source)

## Procedure

### Step 1: Verify Alert
Check current connection pool status:

Commands:
\`\`\`sql
SELECT count(*) FROM pg_stat_activity WHERE state = 'active';
SELECT * FROM pg_stat_activity WHERE state = 'active' ORDER BY query_start;
\`\`\`

Verification:
- [ ] Connection count ≥90% of max pool (check DEP-001 pool config)

### Step 2: Identify Problematic Queries
Find long-running or blocked queries:

Commands:
\`\`\`sql
SELECT pid, now() - pg_stat_activity.query_start AS duration, query
FROM pg_stat_activity
WHERE (now() - pg_stat_activity.query_start) > interval '5 minutes';
\`\`\`

Verification:
- [ ] At least one query identified running >5 minutes

### Step 3: Kill Problematic Queries (if safe)
Only kill queries that are clearly stuck:

Commands:
\`\`\`sql
SELECT pg_terminate_backend(pid) FROM pg_stat_activity
WHERE pid = <problematic_pid>;
\`\`\`

Verification:
- [ ] Connection count dropping within 2 minutes
- [ ] MON-005 alert resolving

### Step 4: Investigate Root Cause
- Check recent deployments (last 24h via git log)
- Review application logs for query patterns (Datadog logs)
- Check for missing indexes on recent queries

## Escalation
- **When to escalate**: Issue persists >15 minutes, data integrity concern, cannot kill queries safely
- **Who to contact**: Database Team Lead (Slack: @db-team, PagerDuty)
- **What to provide**: Timeline, queries identified, actions taken, connection count trend

## Post-Incident
- [ ] Document incident timeline (who was paged, when actions taken)
- [ ] File ticket for query optimization if needed
- [ ] Update this runbook if steps were wrong/missing
- [ ] Schedule team drill of this runbook within 1 week if escalated

Linked IDs: MON-005 (alert), DEP-001 (pool config), RISK-008 (data integrity)

---

RUN-002: Production Deployment Procedure
Category: Deployment
Trigger: Scheduled release when all DEP- criteria met
Owner: DevOps Team
Last Tested: 2025-02-18

## Scope
- **Handles**: Standard production deployments (mainline releases)
- **Does NOT handle**: Hotfix deployments (see RUN-003), Database migrations (see RUN-004), Emergency rollback (see RUN-005)

## Prerequisites
- [ ] All DEP- criteria verified
  - [ ] DEP-002: All tests pass in staging
  - [ ] DEP-003: No critical RISK- blockers
  - [ ] DEP-004: Security review complete
- [ ] Staging deployment successful
- [ ] Release approval from Tech Lead in #deployments channel
- [ ] On-call engineer available for rollback (next 30 minutes)

## Procedure

### Step 1: Pre-Deploy Announcement
Notify stakeholders of upcoming deployment:

Commands:
\`\`\`bash
./scripts/notify-deploy.sh --env production --version v${VERSION} --channel #deployments
\`\`\`

Verification:
- [ ] Message posted to #deployments

### Step 2: Create Deployment Checkpoint
Tag current production for rollback (per DEP-003):

Commands:
\`\`\`bash
git tag -a "pre-deploy-$(date +%Y%m%d-%H%M)" -m "Checkpoint before v${VERSION}"
git push origin --tags
\`\`\`

Verification:
- [ ] Tag created and pushed to git

### Step 3: Execute Deployment
Deploy to production using CI/CD:

Commands:
\`\`\`bash
./scripts/deploy.sh --env production --version v${VERSION}
\`\`\`

Verification:
- [ ] Deployment pipeline exits with status 0
- [ ] New version visible: curl https://api.prod.example.com/health | jq .version

### Step 4: Post-Deploy Validation
Run smoke tests (per DEP-004):

Commands:
\`\`\`bash
./scripts/smoke-test.sh --env production --suite critical
\`\`\`

Verification:
- [ ] All smoke tests pass
- [ ] Manual spot-check: key UJ- flows work (test signup, login, create report)
- [ ] Error rate within baseline: curl https://api.prod.example.com/metrics | jq .error_rate_5m

### Step 5: Monitor for 30 Minutes
Watch dashboards for anomalies:

Verification:
- [ ] No new critical/warning alerts (check Datadog/Slack #alerts)
- [ ] Latency (MON-001) within normal range (<500ms p95)
- [ ] Error rate (MON-002) within baseline (<0.5%)
- [ ] Business metrics dashboard shows expected traffic

## Escalation
- **When to escalate**: Smoke tests fail, error rate >2%, user reports critical issue, latency >2s
- **Who to contact**: On-call engineer (PagerDuty), then Tech Lead
- **What to provide**: Version deployed, failure mode, logs from Datadog, timeline

## Post-Deployment
- [ ] Post deployment success to #deployments
- [ ] Update deployment log in runbook folder
- [ ] If issues: Escalate and execute RUN-005 (emergency rollback)

Linked IDs: DEP-001/002/003/004 (release criteria), RUN-005 (emergency rollback)

Core Concept: Runbook as Insurance

A runbook is not documentation—it is operational insurance. When systems fail at 3 AM, the runbook is the difference between 5-minute recovery and 5-hour chaos.

Runbook Categories

| Category | Purpose | Trigger |

|----------|---------|---------|

| Incident Response | Handle production issues | Alert fires, user reports |

| Deployment | Execute release procedures | Scheduled release |

| Maintenance | Regular operational tasks | Scheduled windows |

| Recovery | Restore from failures | Disaster scenario |

| Escalation | Route to right people | Issue beyond capability |

Execution

  1. Identify critical scenarios
  1. Map each scenario to a runbook
  1. Document step-by-step procedures
  1. Define escalation paths
  1. Add verification steps
  1. Create RUN- entries with full traceability

RUN- Output Template

RUN-XXX: [Runbook Title]
Category: [Incident | Deployment | Maintenance | Recovery | Escalation]
Trigger: [What initiates this runbook]
Owner: [Team or role responsible]
Last Tested: [Date of last drill/use]

## Scope
- **Handles**: [What scenarios this covers]
- **Does NOT handle**: [Explicit exclusions]

## Prerequisites
- [ ] Access to [system/tool]
- [ ] Credentials for [service]
- [ ] Contact info for [team]

## Procedure

### Step 1: [Action Title]
[Detailed instructions]

Commands:

Example command with placeholders


Verification:
- [ ] [How to confirm step succeeded]

### Step 2: [Action Title]
[Detailed instructions]

### Step N: [Final Action]
[Detailed instructions]

## Escalation
- **When to escalate**: [Conditions that require help]
- **Who to contact**: [Name/role, contact method]
- **What to provide**: [Information needed for handoff]

## Post-Incident
- [ ] Document incident timeline
- [ ] Update runbook if steps were wrong/missing
- [ ] Schedule post-mortem if severity > [threshold]

Linked IDs: [MON-XXX, DEP-XXX, RISK-XXX related]

Example RUN- entries:

RUN-001: Database Connection Pool Exhaustion
Category: Incident
Trigger: MON-005 alert (connection pool >90%)
Owner: Backend Team
Last Tested: 2025-01-15

## Scope
- **Handles**: Connection pool saturation, slow queries causing pooling
- **Does NOT handle**: Database server crash (see RUN-010)

## Prerequisites
- [ ] Access to AWS RDS console
- [ ] Database read credentials
- [ ] PagerDuty access for escalation

## Procedure

### Step 1: Verify Alert
Check current connection pool status:

Commands:

SELECT count(*) FROM pg_stat_activity WHERE state = 'active';

SELECT * FROM pg_stat_activity WHERE state = 'active' ORDER BY query_start;


Verification:
- [ ] Connection count matches alert threshold

### Step 2: Identify Problematic Queries
Find long-running or blocked queries:

Commands:

SELECT pid, now() - pg_stat_activity.query_start AS duration, query

FROM pg_stat_activity

WHERE (now() - pg_stat_activity.query_start) > interval '5 minutes';


### Step 3: Kill Problematic Queries (if safe)
Only kill queries that are clearly stuck:

Commands:

SELECT pg_terminate_backend(pid) FROM pg_stat_activity

WHERE pid = <problematic_pid>;


Verification:
- [ ] Connection count dropping
- [ ] MON-005 alert resolving

### Step 4: Investigate Root Cause
- Check recent deployments (last 24h)
- Review application logs for query patterns
- Check for missing indexes on recent queries

## Escalation
- **When to escalate**: Issue persists >15 minutes, data integrity concern
- **Who to contact**: Database Team Lead (Slack: @db-team, PagerDuty)
- **What to provide**: Timeline, queries identified, actions taken

## Post-Incident
- [ ] Document incident timeline
- [ ] File ticket for query optimization if needed
- [ ] Update this runbook if steps were wrong/missing

Linked IDs: MON-005, DEP-001, RISK-008
RUN-002: Production Deployment Procedure
Category: Deployment
Trigger: Scheduled release, all DEP- criteria met
Owner: DevOps Team
Last Tested: 2025-01-20

## Scope
- **Handles**: Standard production deployments
- **Does NOT handle**: Hotfix deployments (see RUN-003), Database migrations (see RUN-004)

## Prerequisites
- [ ] All DEP- criteria verified (DEP-002, DEP-003)
- [ ] Staging deployment successful
- [ ] Release approval in deployment channel
- [ ] On-call engineer available for rollback

## Procedure

### Step 1: Pre-Deploy Announcement
Notify stakeholders of upcoming deployment:

Commands:

Post to #deployments Slack channel

./scripts/notify-deploy.sh --env production --version ${VERSION}


### Step 2: Create Deployment Checkpoint
Tag current production for rollback:

Commands:

git tag -a "pre-deploy-$(date +%Y%m%d-%H%M)" -m "Checkpoint before ${VERSION}"

git push origin --tags


### Step 3: Execute Deployment
Deploy to production using CI/CD:

Commands:

Trigger production deploy pipeline

./scripts/deploy.sh --env production --version ${VERSION}


Verification:
- [ ] Deployment pipeline green
- [ ] New version visible in health check endpoint

### Step 4: Post-Deploy Validation
Run smoke tests and verify key flows:

Commands:

./scripts/smoke-test.sh --env production


Verification:
- [ ] All smoke tests pass
- [ ] Key UJ- flows verified manually
- [ ] Error rate within baseline (MON-001)

### Step 5: Monitor for 15 Minutes
Watch dashboards for anomalies:
- Error rate dashboard
- Latency dashboard
- Business metrics dashboard

Verification:
- [ ] No new alerts
- [ ] Metrics within normal range

## Escalation
- **When to escalate**: Smoke tests fail, error rate >2%, user reports
- **Who to contact**: On-call engineer, then Tech Lead
- **What to provide**: Deployment version, failure mode, logs

## Post-Incident
- [ ] Post deployment success/failure to #deployments
- [ ] Update deployment log
- [ ] Schedule retro if issues encountered

Linked IDs: DEP-001, DEP-002, DEP-003, MON-001

Runbook Quality Checklist

For each runbook, verify:

| Criterion | Question | Pass? |

|-----------|----------|-------|

| Actionable | Can someone follow this without asking questions? | |

| Complete | Are all steps documented with commands? | |

| Verifiable | Does each step have a verification check? | |

| Scoped | Is it clear what this does and doesn't cover? | |

| Escalatable | Is the escalation path defined? | |

| Tested | Has this runbook been tested in a drill? | |

| Maintained | Is there an owner who updates it? | |

Runbook Types by MON- Alert

Map monitoring alerts to runbooks:

| Alert Type | Runbook | Response Time |

|------------|---------|---------------|

| Critical | Dedicated incident RUN- | <5 min |

| Warning | Shared investigation RUN- | <30 min |

| Info | Reference documentation | Next business day |

Common Procedures to Document

| Category | Must-Have Runbooks |

|----------|-------------------|

| Incident | Service down, Performance degradation, Security incident |

| Deployment | Standard release, Hotfix, Rollback |

| Maintenance | Database backup, Log rotation, Certificate renewal |

| Recovery | Data restore, Failover, Service restart |

Anti-Patterns

| Pattern | Signal | Fix |

|---------|--------|-----|

| Too vague | "Investigate the issue" | Add specific commands and checks |

| Too long | 50+ step runbook | Split into focused runbooks |

| Outdated | References deprecated tools | Add review date, assign owner |

| No verification | Steps without confirmation | Add verification after each step |

| Assuming knowledge | "You know how to do this" | Write for someone's first day |

| No escalation | Dead ends with no help path | Always define escalation |

Quality Gates

Before proceeding to Monitoring Setup:

Downstream Connections

| Consumer | What It Uses | Example |

|----------|--------------|---------|

| Monitoring Setup | RUN- procedures linked from alerts | MON-001 → RUN-001 |

| On-Call Team | RUN- as operational reference | Night incident → RUN-001 |

| Post-Mortems | RUN- gaps inform improvements | "Runbook missing step" → Update RUN-001 |

| Training | RUN- for new engineer onboarding | Run drills using RUN-002 |

Detailed References

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.