Flag #62/#63: allowed-tools removed. Inherits Bash(*) from
.claude/settings.json. Restricting to specific subcommand patterns at the
skill level silently blocks agents on permission prompts the agent cannot
see — see dispatch #171 for the devex incident that surfaced this trap.
-->
Plan Complete
Run this when all phases in a plan are done. This finalizes the living artifacts and produces the Reference document.
At this point, master already contains the squashed phase commits (landed via /phase-complete at each phase boundary). No additional squash needed.
Arguments
- $ARGUMENTS: Plan name or path (e.g., "deployment infrastructure" or "docs/plans/20260322-deployment-infrastructure.md"). If empty, find the most recently modified plan in
docs/plans/.
Instructions
Step 1: Preconditions
- If
$ARGUMENTSis empty, find the most recently modified plan indocs/plans/. - Run
git diff --stat HEADandgit status. If no changed files, note "clean tree — QG will review the full project scope." - Identify the plan file and read it to understand the full scope.
Step 2: Run the quality gate
Invoke /quality-gate via the Skill tool, passing plan-complete: $ARGUMENTS as the skill argument. The plan-complete prefix tells /quality-gate what boundary type to use for the QGR receipt filename.
This runs the full QG protocol: parallel agent review → consolidate → bug-exposing tests → fix → coverage tests → confirm clean → present QGR → write QGR receipt file.
The QG scope should be the entire project codebase, not just recent changes — this is the final gate before the plan is declared complete.
Wait for the QGR to be presented and the receipt file written before proceeding.
Step 3: Principal approval
Present the QGR to the principal. Do not proceed without explicit approval. This is a plan boundary — the principal must sign off.
Step 4: Finalize the Plan
- Read the plan file
- Update all phase statuses to "Complete"
- Ensure all QGRs are present
- Add a "Plan Completion" section:
- Summary of all phases delivered
- Total test count across all phases
- Total issues found and fixed across all QGRs
- Any open items or follow-up work identified
Step 5: Finalize the A&D
- Locate the A&D document (search
agency/workstreams/*/anddocs/plans/) - Review: does it reflect reality, not aspirations?
- Update any design decisions that changed during implementation
- Mark any decisions that were deferred or abandoned
Step 6: Finalize the PVR
- Locate the PVR document (search
agency/workstreams/*/) - Review: are all requirements addressed?
- Note any requirements that were descoped or deferred
- Update success criteria with actual results
Step 7: Produce the Reference Document
Generate a final "this is how it works" document:
- Create
docs/<project-name>/reference.md(or appropriate location) - Structure:
- Overview (from PVR goal)
- Architecture (from A&D)
- Key design decisions (from A&D, with rationale)
- How to use (from Plan, distilled to operational knowledge)
- Known limitations and future work
- Present the draft to the principal for review
Step 8: Commit
Use /git-safe-commit via the Skill tool. The message must follow the Phase X.Y: format. Principal must approve the commit message.
Step 9: Update handoff
Locate the handoff file for this project (glob usr/*/*/handoff.md or usr/*/captain/handoff.md). Update with:
- Plan completion status
- Reference document location
- Any follow-up work identified
- Handoff to captain for PR creation
Print:
Plan complete. Master contains all phase commits. The captain session on master manages PR creation and pushes to origin.
Artifacts finalized:
- Plan: [path]
- A&D: [path]
- PVR: [path]
- Reference: [path]